Exported steel in place in Thailand: a World Steel job abroad, shown for the building type rather than a US site.
Florida · Hurricane wind
Hurricane wind design for Florida steel buildings
All of Florida lies inside the hurricane-prone region of ASCE 7, so wind sets the size of almost every member and screw in a Florida steel building. We engineer the frame, purlins, girts, bracing and panel attachment as one load path for the wind speed, exposure and risk category of your parcel, and we show every input before fabrication starts.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, and shipped to a Florida port.
- Code basis
- Florida Building Code, 8th Edition (2023), with wind loads from ASCE 7-22
- Wind speed
- Ultimate design wind speed from the code map for your parcel and risk category
- Exposure
- Exposure D along open water, C in open country, B in built-up areas
- Season
- Atlantic hurricane season runs June 1 to November 30
Why wind leads
In Florida, wind decides the steel
Gravity loads in Florida are light: there is no snow, and roof live loads are modest. Wind is the opposite. Suction on the roof lifts the purlins and frames, pressure on the walls pushes the girts and columns, and the whole building wants to slide and overturn on its anchor rods. Most member sizes in a Florida metal building come from the wind combinations.
Damage surveys after Andrew, Charley, Michael and Ian kept pointing to the same places: roof corners and edges, overhead doors, thin trims and lightly fastened panels. Well-designed steel frames usually stayed up. That is why our wind design spends as much effort on the envelope attachment and the openings as on the main frames.
Inputs we confirm
The wind criteria we settle before design
Every value goes on the first sheet of the calculation package, so your Engineer of Record and plan reviewer can check it in minutes.
| Input | What it is | Florida notes |
|---|---|---|
| Risk category | I to IV, from the building’s use and occupancy | Warehouses are usually II; large assembly III; emergency operations centers and designated shelters IV |
| Ultimate wind speed | Read from the code map for the risk category | Shown in m/s with mph in brackets; the highest values sit in South Florida and the Keys |
| Exposure category | Surface roughness upwind of the site | Exposure D within the distance the code sets from open water; check every direction |
| Enclosure classification | Enclosed, partially enclosed, partially open or open | Large doors that may fail can make a building partially enclosed and raise internal pressure |
| Topography and elevation | Topographic factor Kzt and ground elevation factor Ke | Usually 1.0 on flat Florida terrain; checked near dunes, bluffs and embankments |
Load path
From roof sheet to anchor rod, every link designed
Roof panels and screws
Fastener spacing tightened in the corner and edge zones, where suction is far higher than in the field of the roof.
Purlins and girts
Cold-formed members checked to AISI S100 for uplift, with flange bracing where wind puts the inner flange in compression.
Main frames
Rigid frames sized for the governing wind combinations, including uplift with little dead load to resist it.
Bracing and connections
Rod, cable or portal bracing carries wall wind to the foundations, with bolted connections detailed for reversal.
Framed openings
Jambs and headers designed for the reactions of each overhead door at its design pressure.
Anchor rod reactions
Uplift, shear and overturning at every column handed to your foundation engineer in one table.
What we do not claim
No building is hurricane-proof and we give no wind rating. We design the steel structure to the criteria agreed for your site, your Engineer of Record approves the drawings, and the building department decides on the permit. Foundations, erection, doors and glazing by others, and maintenance all shape how a building performs in a storm.
Florida ecosystem
Products and solutions for this condition
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Real World Steel photos
World Steel at work
Florida solutions
Other Florida guides
Questions
What Florida buyers ask
What wind speed will my Florida building be designed for?
The ultimate design wind speed the Florida Building Code map gives for your parcel and risk category. We read it for the site address, show it in m/s with mph in brackets, and your Engineer of Record confirms it.
Is a metal building weaker in a hurricane than concrete block?
Not when it is engineered for the site. A steel frame can be designed for the same code pressures as any other system; what matters is the load path and the envelope details, which is where we put our effort.
Do you design for tornadoes?
ASCE 7-22 adds tornado loads only for Risk Category III and IV buildings in mapped tornado-prone areas. Storm shelters are a separate design under ICC 500. We apply either when your project requires it.
Keep reading
Related pages
Code facts on this page summarize the Florida Building Code, ASCE 7-22 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building official confirm the edition and local amendments in force for your permit.
Building in Florida?
Send the site address, size and use. We set the Florida criteria, design the steel to the Florida Building Code and quote it made in our Vietnam plant, with approvals for every envelope product coordinated in writing.