Walk the campus
Every part of a data center campus that steel carries
Pick a phase to see how a campus grows, then pick an area to read how we design and fabricate its steel.
Diagram for explanation only. It is not a World Steel project and shows no real site, sizes or loads.
-
Data halls
Long-span frames over open white space, columns set out on the rack grid, a roof built for hung services.
Read the guide -
Roof plant
Dunnage frames, screens and walkways for cooling units, sized for weight, wind, snow drift and seismic forces.
Read the guide -
Mechanical and electrical yards
Generator, switchgear and chiller platforms, stairs, catwalks and screen walls, galvanized for outdoor exposure.
Read the guide -
Pipe and cable racks
Multi-tier racks and cable bridges that carry chilled water, power and fiber between plant and halls.
Read the guide -
Multi-story blocks
Office, network and electrical rooms stacked in braced or moment frames on composite floors.
Read the guide
The master plan built out hall by hall from the same design and piece-mark system.
The data center solution group
Nine guides, from the data hall to the seismic zone
Written for US contractors, owners’ teams and engineers, each tied to the way we design, fabricate and document your steel.
In-depth articles
Inside the data center, rack by rack
Forty in-depth articles on planning, rating, laying out, cooling, powering, protecting and building a US data center, each read from the structural side: what the frame has to carry, where it sits on the schedule, and how World Steel designs and fabricates the steel for it in Vietnam.
Built on Hwaiyu Geng (ed.), Data Center Handbook, 2nd edition (Wiley, 2021), paraphrased and cited by chapter, with US codes and standards.
Sustainability, energy, data center types, edge sites and the cost picture.
Risk thinking, site search, Risk Category IV, performance-based seismic design and reuse of existing buildings.
Wind, roof snow and rain, flood, lessons from Sandy and Tohoku, and post-event inspection.
TIA-942, Tier redundancy, ASHRAE thermal guidance, BICSI 002 and NFPA 75.
Floor loads, ceiling height, column grid, raised floor and the overhead support steel.
Containment, economizers, liquid cooling, roof plant and the air the steel breathes.
Generator yards, UPS and battery rooms, microgrids, grounding and electrical galleries.
Project management, modular delivery, fire ratings, reliability and future growth.
Structural steel at campus scale
A large steel group behind your data center program
World Steel Group is not a small kit supplier. Our plant fabricates up to 2,500 metric tons (about 2,750 US tons) of structural steel a month: built-up columns and girders, long-span trusses, hot-rolled frames, platforms and racks. That is the capacity large US contractors need to keep several halls moving at once.
We work as the steel supply partner of the US contractor, who erects the steel, holds the permit and works with the Engineer of Record. One project manager stays with you from the first calculation to the last container.
Speed and schedule
Three lanes running at once
Steel from Vietnam is fast when the plant works while your site does. Here is what runs in parallel; your written scope turns it into a schedule for your project.
US site · your contractor
- Site and utilities
- Foundations
- Anchor rods set to our plan
- Erection area by area
Vietnam plant · World Steel
- Design for EOR approval
- Anchor rod package first
- Tekla detailing by area
- Cut, weld, coat, QC release
Ocean · to your US port
- Early areas sail first
- Packed in erection order
- Packing lists per container
- Tracked in PEB Studio
Real photos from our plant in Vietnam
Where the steel for your campus is made
Girders, trusses, columns and platforms for US projects are cut, welded, blasted, coated and packed in World Steel’s own plant in Tay Ninh Province, Vietnam. Real photos of our shop floors, not stock images; none shows a data center.
Who does what
A clear line between the steel and the site
World Steel supplies the steel structure only. The US contractor, our customer, builds the data center.
World Steel
- Structural steel design to US codes, for your Engineer of Record’s review
- Tekla shop and erection drawings, at no extra charge
- Frames, trusses, columns, platforms, racks, dunnage and support steel
- Metal deck, roof and wall panels when you want them
- Coating or hot-dip galvanizing for the exposure
- QC records, mill certificates and the Manufacturing Data Record
- Packing in erection sequence and shipping to your US port
- Real-time fabrication tracking in PEB Studio
The US contractor, our customer, and their team
- Drawing approval, the PE seal and the permit, with your Engineer of Record
- Owner’s design criteria: rack loads, hung loads, risk category, vibration
- Foundations, slabs and anchor rod setting
- Erection, field bolting and field welding
- Power, cooling, fire protection and IT systems
- Field special inspection and testing
- Import, customs and inland delivery as agreed in the Incoterm
The data center steel ecosystem
One campus, the whole World Steel ecosystem behind it
The building package, the industry page and the engineering guides connect here, with the products we make for data centers and past World Steel projects.
- Data center shell buildingsThe building package: what ships in a data center shell.
- Data centers & technologyThe industry page: who we serve and the buildings they need.
- Multi-story steel buildingsStacked frames on composite floors.
- Seismic steel structuresNine guides for US earthquake country.
- Built-up steel sectionsHeavy columns, girders and tapered frames from plate.
- Design optimizationLess steel for the same code loads.
- Shop drawings, includedTekla shop and erection drawings at no extra charge.
- PEB Studio trackingEvery member followed in real time.
- Contractor partnershipA long-term steel supply partner for US contractors.
- Build to your drawingsYour Engineer of Record’s design, fabricated in our plant.
- Vietnam to USA logisticsOcean freight to your US port, in erection order.
- US codes & standardsThe codes every frame is designed to.
Products made in our plant in Vietnam
Photo
Photo
Photo
Photo
Photo
World Steel projects: heavy, phased and multi-story work
Photo
Photo
Photo
Photo
Photo
Past World Steel work, shown for the structure type and scale. None of these is a data center.
US codes and standards
The documents behind every data center frame
We design and fabricate to these standards as your project requires. They are design references, not certifications: we claim no AISC or AWS company certification.
Questions from US contractors
Data center steel questions we hear
Can World Steel supply the structural steel for a US data center campus?
Yes. We design and fabricate the steel for data halls, roof plant, equipment yards, pipe and cable racks and multi-story blocks in our own plant in Vietnam, and ship it to your US port. Large US contractors are our customers: they erect the steel and hold the permit.
How much steel can you fabricate?
World Steel Group’s plant fabricates up to 2,500 metric tons (about 2,750 US tons) of structural steel a month, enough to run several halls of a campus in overlapping phases.
Who approves and seals the design?
The US contractor, our customer, and their Engineer of Record. We deliver calculations and drawings ready for their review and approval; the PE seal and the permit are theirs.
Do you erect the steel?
No. World Steel supplies the steel structure only. Erection is the scope of the US contractor, World Steel’s customer.
Do you supply power or cooling equipment?
No. Power, cooling, fire protection and IT equipment are designed by your engineers and procured separately. We supply the frame and the steel that supports that equipment.
What is your lead time?
We do not publish lead times, because they depend on tonnage, approvals and shipping. Your written scope includes a schedule for your project, and fabrication progress is visible in PEB Studio.
Are shop drawings included?
Yes. Shop drawings come with every project at no extra charge, with hanger steel, dunnage and supports detailed with the frame.
Planning a data center campus?
Send the campus plan, the owner’s design criteria if you have them, and the first phase you need. We return a written scope for structural steel designed to US codes, made in our plant in Vietnam and shipped to your US port.