Arkansas · Delivery
Structural steel delivered to Arkansas job sites
Arkansas has no seaport, but the Mississippi and Arkansas rivers connect it to the Gulf. Our steel usually lands at New Orleans or Houston and comes north by truck on I-30 and I-40, by rail, or by barge to river ports near Little Rock and Osceola. Members are packed in erection order.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered through New Orleans or Houston for your Arkansas site.
- Gulf gateway
- Port of New Orleans
- Second gateway
- Port of Houston
- Rivers
- Mississippi, Arkansas
- Packing
- Erection order
Why it matters
Gulf port, then river or road
New Orleans is the natural gateway for the Delta and the northeast, with barge service up the Mississippi. Houston suits central and western Arkansas by truck and rail. The choice depends on the site, the package and the delivery terms.
We pack bundles by erection area, label every piece and show loading in PEB Studio, so your team knows what arrives on each truck or barge.
The route
How steel reaches an Arkansas site
River ports
Barge terminals near Little Rock, Pine Bluff and Osceola.
Arkansas
Arkansas ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Arkansas contractors
Arkansas contractors: let’s win the next project together
If your next bid involves river, rail and truck, World Steel wants to be your long-term, win-win steel partner in Arkansas. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Arkansas project is cut, welded, inspected and packed.
Q&A
What Arkansas buyers ask
Which port is best for Arkansas?
Usually New Orleans or Houston. We compare routes for your site and terms.
Can steel come by barge?
Yes, to river ports on the Mississippi and Arkansas rivers, with truck to the site.
How are members packed?
In erection order, labeled by area, with packing lists for each bundle.
Official sources: Arkansas Waterways Commission
Arkansas solutions
Every Arkansas guide
Related pages
Code facts on this page summarize Arkansas practice, the Arkansas Fire Prevention Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in Arkansas?
Send the drawings or the site address, size and use. We set the Arkansas design basis with your Engineer of Record, design or detail the steel to the Arkansas Fire Prevention Code, New Madrid seismic rules and storm loads, and quote it made in our plant in Vietnam, packed in erection order and delivered through New Orleans or Houston to your site.