Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Cold storage and farm steel for Central Washington

The Yakima Valley and the Wenatchee area store much of the country’s apples in cold and controlled-atmosphere rooms, and the Columbia Basin stores and processes potatoes, onions and grain. These buildings are cold and humid inside, carry snow outside and are built in seasons between harvests.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, and shipped to a Washington port.

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Washington project is cut, welded, inspected and packed.

Q&A

What Washington buyers ask

Can you supply insulated panels with the frame?

Yes. We supply insulated roof and wall panels with the frame, or the frame only if the panels come from a specialist cold room installer.

Which coating do you use inside cold rooms?

Usually galvanizing or an epoxy system chosen for condensation and washdown, following your specification.

Can a building be ready before the next harvest?

We plan fabrication and shipping backward from your harvest date and show progress in PEB Studio. We publish no lead times; each quote states the schedule.

Washington solutions

Every Washington guide

Related pages

Code facts on this page summarize Washington rules, the International Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building official confirm the edition and local amendments in force for your permit.

Building in Washington?

Send the drawings or the site address, size and use. We set the Washington design basis with your Engineer of Record, design or detail the steel and quote it made in our plant in Vietnam, packed in erection order for your site.