Wisconsin · Paper and foundries

Structural steel for Wisconsin paper mills and foundries

Wisconsin has made more paper than any other state for decades, with mills along the Fox and Wisconsin rivers from Appleton and Neenah to Green Bay and Wausau, and foundries and metal plants close by. These plants rebuild and expand around running machines: tall halls, heavy cranes, platforms and humid, hot process air.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and sent by rail through Chicago to your Wisconsin site.

Built-up members with welded stiffeners and drilled clip plates on shop supports
Stiffeners and drilled clip plates welded on, World Steel plant in Vietnam.
Clusters
Fox Valley, Wausau, Milwaukee
Halls
Tall machine buildings
Cranes
Heavy, high duty
Air
Humid and hot

Why it matters

Steel around running machines

A paper machine hall is long and tall, with heavy cranes to lift rolls and machine parts, and air full of moisture and heat. Foundries add heat, dust and very heavy crane duty. Most work is an expansion or rebuild next to a plant that keeps running, so the steel arrives in tight sequences.

Our plant built 5,000 t of structural steel for the Sunpro Steel factory in Vietnam. We design or detail crane runways and heavy built-up columns, platforms and machine support steel, specify coatings for the process air, and release the steel in the sequence of the shutdown.

What we design and fabricate

Steel for paper mills and foundries

Crane runways

Runways and crane columns for heavy duty.

Built-up members

Deep plate girders and columns for tall halls.

Platforms

Operating floors, stairs and walkways.

Coatings

Systems for humid, hot process air.

Who does what

Mill steel, split clearly

World Steel supplies

  • Hall, runway and platform design or detailing
  • Built-up members for heavy loads
  • Packages sequenced for shutdowns
  • Mill certificates traced by heat
  • Tekla shop and erection drawings, included

The US contractor arranges

  • Crane classes and process loads from the owner
  • Engineer of Record approval and PE seal
  • Plan approval, permit and inspections
  • Machines, cranes and process equipment
  • Erection and site work

Wisconsin

What we do not claim

World Steel names no paper, foundry or metals company as a customer and claims no completed Wisconsin mill. Sunpro Steel is a project in Vietnam.

Wisconsin ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · Wisconsin contractors

Wisconsin contractors: let’s win the next project together

If your next bid involves paper mills and foundries, World Steel wants to be your long-term, win-win steel partner in Wisconsin. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Wisconsin project is cut, welded, inspected and packed.

Operator checking web and flange plates set in blue H-beam assembly jigs
Web and flange plates set in the H-beam assembly jigs before automatic welding, Vietnam plant.
Welder looking over the stiffeners and end plate of a heavy column
Column stiffeners and end plate under inspection at World Steel, Vietnam.
Galvanized tower tubes with plastic-wrapped flanges stacked in an open yard
Galvanized tower tubes with their flanges wrapped to protect the zinc in transit.
Gray members stacked and strapped together on a packing rack
Gray members strapped into a bundle on the packing rack, World Steel, Vietnam.

Q&A

What Wisconsin buyers ask

Can you supply heavy crane runways?

Yes. Runway beams, brackets and built-up crane columns for the crane classes the plant specifies.

Can steel arrive for a planned shutdown?

Yes. We release and pack the steel in the sequence your shutdown plan needs.

Which coatings suit humid mill air?

We specify a coating system for the exposure, or galvanizing, from brands such as Jotun, PPG, Carboline and Hempel.

Official sources: Wisconsin Economic Development Corporation

Wisconsin solutions

Every Wisconsin guide

Related pages

Code facts on this page summarize Wisconsin practice, the Wisconsin Commercial Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.

Building in Wisconsin?

Send the drawings or the site address, size and use. We set the Wisconsin design basis with your Engineer of Record, design or detail the steel to the Wisconsin Commercial Building Code and to snow, drift and frost, and quote it made in our plant in Vietnam, packed in erection order for rail through Chicago to your site.