Wisconsin · Logistics
Structural steel for Wisconsin warehouses and logistics
The I-94 corridor from Kenosha to Milwaukee sits between two large markets and has filled with distribution centers serving both Chicago and Wisconsin. I-43 and I-41 carry freight on to Green Bay and the Fox Valley. Our steel arrives the same way most freight does here: by rail through Chicago, then by truck.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and sent by rail through Chicago to your Wisconsin site.
- Corridor
- I-94, Kenosha to Milwaukee
- Also
- I-43 and I-41 north
- Gateway
- Rail through Chicago
- Delivery
- Erection order
Why it matters
Big boxes in snow country
A distribution center needs tall clear heights, wide column grids and long dock walls. In Wisconsin it also needs a roof designed for snow and drift at every parapet and rooftop unit, and dock canopies that carry snow. Tenants set the schedule, so the steel has to arrive in the order the crew erects it.
We design or detail clear-span and multi-span frames, dock canopies and door framing for the site snow and wind, release the steel area by area and pack it for rail and truck.
The route
How steel reaches a Wisconsin site
Truck to site
The last leg on I-94, I-43 and I-41, loads matched to the erection area.
Wisconsin
Wisconsin ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Wisconsin contractors
Wisconsin contractors: let’s win the next project together
If your next bid involves I-94 logistics, World Steel wants to be your long-term, win-win steel partner in Wisconsin. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Wisconsin project is cut, welded, inspected and packed.
Q&A
What Wisconsin buyers ask
Which route is best for Wisconsin?
Usually a West Coast port with rail to Chicago, then truck. We plan the route with your logistics team.
Can you supply a warehouse on a tenant’s schedule?
Yes. We release the steel area by area so erection can start before the whole building is fabricated.
How are members packed?
In erection order, with piece marks and protected bundles, so each load matches the next area to erect.
Official sources: Wisconsin Department of Transportation
Wisconsin solutions
Every Wisconsin guide
Related pages
Code facts on this page summarize Wisconsin practice, the Wisconsin Commercial Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in Wisconsin?
Send the drawings or the site address, size and use. We set the Wisconsin design basis with your Engineer of Record, design or detail the steel to the Wisconsin Commercial Building Code and to snow, drift and frost, and quote it made in our plant in Vietnam, packed in erection order for rail through Chicago to your site.