Cantilever (single column)
Retail and office lots where doors, carts and plows need one open side.
- One column line at the back of the stall
- Nothing to hit when opening doors
- Deeper column and base for the overturning load
Three frame types
Each frame type covers stalls in a different way. Turn on solar-ready to see where modules would sit later.
Retail and office lots where doors, carts and plows need one open side.
Wide rows, employee lots and fleet parking where steel per stall matters most.
Two rows of stalls sharing one column line down the middle.
Solar-ready: purlins spaced and frames sized for modules and racking added later, with conduit paths agreed in advance. Modules, racking and wiring are supplied by your solar and electrical contractors.
What an open canopy must resist
An open canopy is not a small building. With no walls, wind gets under the roof and tries to lift it, so the columns, base plates and anchor rods do most of the work. These are the six things that size a carport frame.
Diagram, not to scale. Your site, your Engineer of Record and your civil engineer set the real values.
Uplift
Wind under an open roof lifts it. Columns, base plates and anchor rods are sized for the ASCE 7-22 open-canopy pressures at your address.
Downward wind and snow
Ground snow, drift against higher canopies and wind pushing down, all from ASCE 7-22 for your site.
Vehicle clearance
The tallest vehicle under the lowest member and light, set by you and your civil engineer.
Drainage
Gutters and downspouts down the columns to your site drainage, not onto cars or walkways.
Impact
Pedestals or bollards at every column; base plates sized for the pedestal height.
Lights and cameras
Brackets and conduit paths for lighting, cameras and signs agreed before fabrication.
The canopy ecosystem
A carport can grow into a solar and EV charging canopy without replacing the steel. Here is the path, with the products and pages behind each step.
Steel frames and roof sheeting over your stalls.
Purlins and frames sized for modules you add later.
A canopy built around modules and chargers from day one.
Fabrication capacity
2,500 metric tons a month
About 2,750 short tons of structural steel fabricated every month in World Steel’s own plant in Vietnam.
Big tonnage does not have to queue behind other work. The plant is sized to take the steel package of a large US job, from heavy frames and built-up girders to multi-story framing, and to ship it to your US port in the order your erector needs it.
Largest jobs delivered: Sunpro Steel 5,000 t · CPV Food 2,500 t · Long Son petrochemical 2,000 t · M&D Thailand 2,000 t →Real World Steel frames
Open structures carry wind from below as well as above. These are World Steel canopy and portal frames, from the plant floor to the finished frame on site. Tap a photo to open it full size.
Photo
Omakase Car Park, Thailand
Photo
Portal frames, Tay Ninh
Photo
Purlins from above
Photo
Packed in our plant
Photo
Bundled by bay Projects outside the US, shown for the structure type; they are not US sites.
Photo
Canopy project by World Steel
Open steel canopy structure, designed, fabricated and supplied by World Steel. Thailand · 2022.
Open the projectBuying steel from outside the US
US buyers ask us the same ten questions before they order steel made in Vietnam. Here is what we do about each one, and where you can check it for yourself.
What the package contains
Covered parking is mostly roof and columns, so the details matter more than the tonnage. We offer cantilever and two-column frames, size them for drifting snow and wind uplift at your address, and can lay out purlins to carry solar racking later. Lighting support steel can be added to the same package.
standard = in the base scope · optional = add if you want it · confirm = depends on your design
Talk to an engineer
Our engineers work in English. We lay the column grid over your stalls, pick the frame type and send a written scope for the steel.
Covered in our state guides
Asked by owners, solar developers and contractors
14 answers on frame types, wind uplift, solar-ready design and shipping.
A cantilever (single-column) frame keeps one side of every stall open for doors and plows; a two-column frame uses less steel per stall and suits wide rows; a multi-bay or double-cantilever frame covers two rows from one column line down the middle. We compare them for your stall layout and loads and show the steel weight of each.
That depends on stall width and the bay spacing that suits your loads. Common layouts put two or three standard stalls between columns; we draw the column grid over your striping plan so columns never land in a stall or a drive aisle.
Yes. The same frames cover drive-throughs, pickup lanes, work yards and loading areas, with clearances set for the tallest vehicle that will pass under.
Open structures are designed for the wind pressures ASCE 7-22 gives for open buildings and canopies, including uplift, for the basic wind speed and exposure at your address. Columns, base plates and anchor rods are sized for it; the foundations are designed by your Engineer of Record and built by your contractor.
Ground snow load and drift are taken from ASCE 7-22 for your site. Snow sliding off a sloped canopy onto parked cars is a design question we raise with your team before the slope is fixed.
IBC 2024 and ASCE 7-22 by default, AISC 360 for hot-rolled members and AISI S100 for cold-formed purlins. Your Engineer of Record approves the drawings and your contractor files for the permit.
The purlins are spaced and the frames are sized for the weight and wind load of solar modules and racking you plan to add later, and conduit paths down the columns are agreed in advance. You buy the steel once and the solar contractor adds modules when you are ready.
No. Modules, racking, inverters, chargers and wiring stay with your solar and electrical contractors. We supply the steel structure that carries them. For canopies built around solar from day one, see our solar and EV charging canopies package.
High enough for the tallest vehicle that will pass under: vans, delivery trucks and, where the fire marshal asks, fire apparatus in the drive aisle. You set the clear height with your civil engineer; we design the frame to keep it clear under the lowest member and any light fixture.
A sloped canopy sheds water to one edge. We place gutters and downspouts so they run down the columns to the drainage your civil engineer designs, instead of onto parked cars or walkways.
In a parking lot, yes. Columns sit on raised pedestals or behind bollards and wheel stops set by your civil engineer. We size base plates and anchor rods for the pedestal height you choose.
No. World Steel designs, fabricates and supplies the steel structure, and the roof sheeting if you want it. Foundations, erection and site work are the scope of the US contractor, our customer.
Repeated columns, rafters and purlins pack densely into 40-foot containers, bundled by bay and by erection sequence, and ship from Vietnam to the US port in your quote.
No. Send the striping plan, the stall count and the site address and we return a written scope and quotation.
Keep reading
Send the striping plan, the stall count and the site address. We pick the frame, make it solar-ready if you want, and send a written scope for the steel, made in our plant in Vietnam.