Minnesota · Snow and frost
Structural steel for Minnesota snow and frost
Minnesota winters are long and cold. Ground snow rises from the Iowa line to the Arrowhead and the North Shore, and frost depths are among the deepest in the lower 48 states, so foundations and anchor rods sit far below grade. On large food plant and warehouse roofs, drift often decides the steel.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and sent by rail on the northern route to your Minnesota site.
- Snow
- Rises to the north
- Frost
- Among the deepest in the US
- Cold
- Long, hard winters
- Governs
- Drift and anchorage
Why it matters
Heavy roofs, deep footings, cold steel
Snow piles up against parapets, roof steps, rooftop units and taller buildings next door, and unbalanced and sliding snow load one side of a roof more than the other. Very cold air also matters for exposed steel: where the design calls for it, the Engineer of Record can specify steel with notch toughness for low service temperatures.
We calculate snow and drift for the site to ASCE 7, size purlins and frames to match, design base plates and anchor rods for the foundation depth your engineer sets below the frost line, and supply steel with Charpy test results when it is specified.
What we design and fabricate
Steel for snow and frost
Drift-zone purlins
Purlins sized for drift at each obstruction.
Frames
Rigid frames for balanced, unbalanced and drift snow.
Anchorage
Base plates and anchor rods for deep foundations.
Tested steel
Charpy-tested steel when the design calls for it.
Who does what
Snow and frost design, split clearly
World Steel supplies
- Snow and drift calculation for the stated basis
- Purlin, frame and platform design or detailing
- Anchorage details for the foundation design
- Mill certificates traced by heat, with Charpy results on request
- Tekla shop and erection drawings, included
The US contractor arranges
- Ground snow and risk category by the Engineer of Record
- Foundation and frost depth design
- Engineer of Record approval and PE seal
- Permit and inspections
- Erection and site work
Minnesota
What we do not claim
World Steel does not design foundations. Frost depth and footings come from your Engineer of Record, and we detail the anchorage to match.
Minnesota ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Minnesota contractors
Minnesota contractors: let’s win the next project together
If your next bid involves snow and frost, World Steel wants to be your long-term, win-win steel partner in Minnesota. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Minnesota project is cut, welded, inspected and packed.
Q&A
What Minnesota buyers ask
Is snow heavier in northern Minnesota?
Yes. Ground snow rises toward the north and the Lake Superior shore, so we take it for each address.
Do you design for frost?
We design base plates and anchor rods for the foundation depth your engineer sets below the frost line.
Can you supply steel for very low temperatures?
Yes. Plate mills can supply steel with Charpy impact test results when your Engineer of Record specifies it.
Official sources: ASCE Hazard Tool
Minnesota solutions
Every Minnesota guide
Related pages
Code facts on this page summarize Minnesota practice, the Minnesota State Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in Minnesota?
Send the drawings or the site address, size and use. We set the Minnesota design basis with your Engineer of Record, design or detail the steel to the Minnesota State Building Code and to snow, drift and frost, and quote it made in our plant in Vietnam, packed in erection order for rail on the northern route to your site.