Florida · Codes and approvals
Florida Building Code, the HVHZ and product approval, explained
Florida runs one statewide building code, a statewide product approval system and, in Miami-Dade and Broward counties, the stricter High-Velocity Hurricane Zone. We design the steel to that code for your Engineer of Record’s approval, and we coordinate every envelope approval on every project. World Steel does not hold Florida Product Approval or a Miami-Dade NOA in its own name, and we say so up front.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, and shipped to a Florida port.
- Statewide code
- Florida Building Code, 8th Edition (2023), updated on a three-year cycle
- HVHZ
- Miami-Dade and Broward counties
- Product approval
- Florida Product Approval statewide; Miami-Dade NOA or HVHZ-approved products in the HVHZ
- Steel design
- Calculations and drawings for your Engineer of Record’s review and approval
The rules in force
What Florida adds to the national codes
One statewide code
The Florida Building Code is based on the International Codes with Florida provisions, and local governments enforce it. We confirm the edition in force at your permit application.
High-Velocity Hurricane Zone
Miami-Dade and Broward apply HVHZ chapters with stricter wind, testing and inspection rules for roofing, walls and openings.
Product approval
Panel walls, roofing, exterior doors, windows, skylights, shutters and some structural components need Florida Product Approval or a local approval for the project.
Miami-Dade NOA
Miami-Dade County’s Notice of Acceptance is the approval HVHZ inspectors look for on many envelope products; Florida approvals marked for HVHZ use are also accepted.
Threshold buildings
Buildings over three stories or 15.2 m (50 ft) high, or large assembly occupancies, need a structural inspection plan and a special inspector under Florida law.
Private providers
Florida lets owners use a licensed private provider for plan review and inspections; we prepare the same package either way.
Approvals, honestly
How each part of the building is approved
Main frames and secondary steel are engineered for your site and approved through the permit set. Envelope products are approved product by product.
| Part | How it is approved | World Steel’s role |
|---|---|---|
| Main frames, purlins, girts, bracing | Site-specific design approved by your Engineer of Record, reviewed with the permit | We design and fabricate; your engineer reviews and approves |
| Roof and wall panels | Florida Product Approval or local approval; HVHZ-approved product or NOA in Miami-Dade and Broward | We specify panels with the approval your site needs and list the status of each |
| Doors, windows, louvers, skylights | Manufacturer’s Florida approval or NOA for the design pressure | We give the design pressures and frame the openings |
| Anchor rods and foundations | Foundation design by your engineer, with our reactions | We supply reactions, anchor rod layout and templates |
| Fabrication | Special inspection of fabricated items, unless the building official accepts an approved fabricator | IAS AC472 accreditation and our inspection records, offered to the building official |
Plain words
What we say and what we never claim
We say
- Designed to the Florida Building Code and ASCE 7-22
- Drawings ready for your Engineer of Record’s review and approval
- Approvals for envelope products coordinated on every project
- Made in the first and only IAS AC472 accredited plant in Vietnam
We never claim
- A Florida Product Approval or Miami-Dade NOA held by World Steel
- That a building is hurricane-proof, or any wind rating
- Certification by MBMA, AISC or AWS: we design to their documents
- That the building department must accept anything: it decides
Florida ecosystem
Products and solutions for this condition
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Real World Steel photos
World Steel at work
Florida solutions
Other Florida guides
Questions
What Florida buyers ask
Which edition of the Florida Building Code applies?
The edition in force on the date your permit application is submitted. The 8th Edition (2023) is current as we write this; we confirm the edition and any local amendments with your jurisdiction.
Will my building department accept steel fabricated in Vietnam?
The building department reviews the permit set and decides on inspections. Our plant is accredited under IAS AC472, and we provide fabrication and inspection records that many jurisdictions accept in place of in-plant special inspection, at the building official’s discretion.
Who seals the drawings?
The US contractor, our customer, and their Engineer of Record. World Steel designs and fabricates the steel structure and delivers the calculations and drawings they review, approve and seal for the permit.
Official sources: Florida Building Commission · Miami-Dade County product control (NOA)
Keep reading
Related pages
Code facts on this page summarize the Florida Building Code, ASCE 7-22 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building official confirm the edition and local amendments in force for your permit.