Colorado · Snow
Structural steel for Colorado snow loads by elevation
In Colorado, the snow on a roof depends on how high the site sits. A building on the plains near Greeley carries light snow; the same building in Summit County or Aspen can carry several times as much. Many mountain counties publish their own ground snow by elevation, and the design has to follow them, with drift and sliding snow on top.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and landed on the West Coast and railed to Denver for your Colorado site.
Summit registerSnow by elevation
- Driver
- Site elevation
- Source
- County table or ASCE 7
- Main risk
- Drift and sliding snow
- Our part
- Snow from the site up
Why it matters
The same building, a different roof
A frame sized for Denver is not a frame for Breckenridge. Above about 2,400 m (8,000 ft), ground snow rises fast, drift builds against higher roofs and parapets, and snow slides off steep roofs onto lower ones and onto walkways.
We take ground snow from the county table for the site’s elevation, or from ASCE 7 where no table exists, check drift and sliding snow at every step, and design purlins, rafters and frames for the load where it lands. Roof equipment goes on dunnage above the drift.
What we design and fabricate
Steel for mountain snow
Drift zones
Closer purlins and heavier rafters where drift lands.
Frames
Primary frames designed for the county snow value.
Roof equipment
Dunnage raised above the drift with clear space under it.
Insulated envelope
Roof panels and thermal breaks for cold, dry winters.
Who does what
Snow design, split clearly
World Steel supplies
- Frame, purlin and rafter design for snow and drift
- Drift and sliding snow checks at every step
- Insulated roof and wall systems
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- Ground snow confirmed by the Engineer of Record
- Engineer of Record approval and PE seal
- Local permit and inspections
- Snow guards and site snow storage
- Erection and site work
Colorado
What we do not claim
World Steel holds no Colorado approval. The ground snow and the design basis are confirmed by your Engineer of Record and the county for each site.
Colorado ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Colorado contractors
Colorado contractors: let’s win the next project together
If your next bid involves snow by elevation, World Steel wants to be your long-term, win-win steel partner in Colorado. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Colorado project is cut, welded, inspected and packed.
Q&A
What Colorado buyers ask
Why does the county snow table matter?
Because it sets the ground snow for the site’s elevation, and the reviewer checks the design against it.
Do you check sliding snow?
Yes. Snow sliding from a higher roof onto a lower one is checked with drift.
Can steel be shipped to mountain sites?
Yes. We size bundles for mountain roads and pack them in erection order for the last leg.
Official sources: ASCE Hazard Tool · Structural Engineers Association of Colorado
Colorado solutions
Every Colorado guide
Related pages
Code facts on this page summarize Colorado practice, local IBC adoption, county snow tables, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the county or city building department confirm the code and edition in force for your project.
Building in Colorado?
Send the drawings or the site address, size and use. We set the Colorado design basis with your Engineer of Record, design or detail the steel to your local code, snow table and wind, and quote it made in our plant in Vietnam, packed in erection order for the trip to your site.