Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Drone view across the World Steel plant: office block in front, fabrication halls behind

Large-project program

A steel package too big for most shops is a normal month for ours

World Steel fabricates 2,500 metric tons of structural steel a month in its own IAS AC472-accredited plant in Vietnam. General, design-build and EPC contractors send us the steel package of a large US job and get one fabricator for the design calculations, shop drawings, fabrication, coating and shipping.

  • 2,500 t a monthabout 2,750 short tons
  • IAS AC472first and only in Vietnam
  • Jobs up to 5,000 tSunpro Steel Factory, 2024
World Steel monthly fabrication capacity: 2,500 metric tons, about 2,750 short tons 2,500 METRIC TONS EVERY MONTH
About 2,750 short tons of structural steel a month, fabricated in World Steel’s own plant in Tay Ninh Province, Vietnam.

Capacity

Put your tonnage next to a month of our plant

Move the slider to the steel weight of the job you are bidding. It shows how that tonnage compares with one month of World Steel’s fabrication output, so you can judge whether the plant has room for it.

  • 20,000 m² (215,000 sq ft) plant site
  • 300+ people in engineering, production and QC
  • Several projects in the shop in parallel
  • Steel shipped to 14 countries

3,000 metric tons

about 3,310 short tons

200 t10,000 t

A comparison with plant output, not a lead time. Your quote confirms the production slot and ship date for your tonnage.

Check a slot for this job

Flagship project · Oil and gas

Long Son petrochemical complex: more than 56,000 m² of steel structures

At the Long Son petrochemical complex in Ba Ria–Vung Tau, Vietnam, World Steel designed, fabricated and supplied about 2,000 metric tons of steel structures covering more than 56,000 m² (about 600,000 sq ft) for the oil and gas sector. Process plants like this hold steel to strict owner specifications: traceable materials, full inspection records and close coordination with the piping and equipment contractors on a crowded site.

Sector
Oil and gas, petrochemical
Structural steel
About 2,000 t (2,200 short tons)
Covered area
More than 56,000 m² (about 600,000 sq ft)
Location
Long Son, Ba Ria–Vung Tau, Vietnam
Year
2022

How a large job runs

From bid documents to the last shipment, one fabricator in charge

The same team carries your job from the take-off to the final container, and you see where every piece is without asking.

  1. Bid review and capacity check

    Our estimators and engineers read the bid documents, take off the tonnage and confirm the production slot we can hold for it.

  2. Design calculations for your Engineer of Record

    We prepare calculations and drawings to the code basis of the job, ready for your Engineer of Record to review and approve.

  3. Shop drawings, included

    One Tekla Structures model produces every erection and assembly drawing, released in the sequences your schedule needs.

  4. Fabrication in sequences

    The job moves through the shop sequence by sequence, so the steel your erector needs first is made first.

  5. Live tracking in PEB Studio

    Your project team sees each piece move from cutting to packing, with weld and coating records attached.

  6. Hold points you can witness

    Inspections can be witnessed live on video, by your own third-party inspector or in person at the plant.

  7. Packed and shipped by erection sequence

    Members are tagged, bundled and loaded so each shipment arrives at your US port in the order it goes up.

  8. Support while your crew erects

    The engineers who detailed the steel answer field questions by phone and video until the frame is up.

Laced crane columns for Sunpro Steel in the World Steel shop Flagship project · Steel mill Sunpro Steel: 5,000 t of steel and a 150 t crane for a steel maker’s own plant Shop photos of the run, the finished plant, and how we design steel mill crane buildings to AIST TR-13, CMAA, AISC and ASCE 7. See the Sunpro Steel mill
Cost and riskHow we lower cost and risk on a large steel packageTen reasons, eight cost levers and a risk register closed out control by control, with payment by Letter of Credit. See the risk register

World Steel

What we design, make and ship

  • Design calculations and drawings for your Engineer of Record
  • Shop drawings and erection drawings, included
  • Fabrication, welding and coating in our plant in Vietnam
  • Quality records, mill certificates and inspection access
  • Packing by erection sequence and shipping to your US port
  • Engineering support during erection by phone and video

The US contractor, our customer

What stays with your team

  • Engineer of Record review, approval and PE seal
  • Building permit and special inspection arrangements
  • Foundations, anchor rods and site work
  • Steel erection and the erection crew
  • Local trades and final building completion

FAQ

Questions large contractors ask before they award

How much structural steel can World Steel fabricate?

The plant fabricates 2,500 metric tons of structural steel a month, about 2,750 short tons, on a 20,000 m² (215,000 sq ft) site with more than 300 people in engineering, production and quality control.

Can you take a large job while running other work?

Yes. Several projects move through the shop in parallel. When we quote your job, we confirm the production slot and ship date we can hold for its tonnage, so the schedule is agreed before you sign.

Can you deliver a large job in phases?

Yes. The model, the shop drawings and the fabrication are released in sequences, and each shipment is packed in the order your erector needs it at the US port nearest your site.

Do you erect the steel?

No. World Steel designs, fabricates and supplies the steel structure. Erection, foundations and site work are the US contractor’s scope, and our engineers support the erection crew by phone and video.

Who approves and seals the drawings?

The US contractor, our customer, and their Engineer of Record. We prepare calculations and drawings ready for that engineer’s review and approval, and answer review comments on our design.

Can you build to our own engineer’s design?

Yes. Send the design and we price it as drawn, or propose Value Engineering options that your Engineer of Record approves before anything changes.

What documents can you provide for prequalification?

Our IAS AC472 and ISO 3834-2 certificates, sample submittal documents, welding procedures and sample mill certificates. Ask for anything else your prequalification form needs and we tell you what we can supply.

Can we audit the plant before we award?

Yes. Book a video walk-through from the US or visit the plant in Tay Ninh Province, Vietnam. Hold points on your job can also be witnessed remotely.

Open call · US contractors

World Steel is looking for US contractor partners

General contractors, design-build and EPC firms, erectors and dealers who need structural steel: let’s build a long-term, win-win partnership. You win and build the project in your market. Our plant in Vietnam designs, fabricates and supplies the complete steel structure, with 2,500 metric tons a month behind your bids.

You bring

  • Your market and owners
  • EOR approval and permit
  • Foundations and erection

We bring

  • 2,500 t a month, own plant
  • IAS AC472, first in Vietnam
  • Engineering and shop drawings

Bidding a large US job? Send us the steel package.

Upload the bid documents, the tonnage and the bid date. Our estimators and engineers review them and confirm the production slot we can hold for your job.