Largest jobs
Structural steel packages we have already delivered
Each of these jobs was designed, detailed, fabricated and shipped by World Steel from our own plant. The bars share one scale, so you can read the size of each package at a glance.
-
Sunpro Steel Factory
5,000 t about 5,500 short tons
Steel industryCan Tho City, Vietnam · 2024
-
CPV Food Processing Factory
2,500 t about 2,750 short tons
Food processingDong Nai Province, Vietnam · 2020
-
Long Son petrochemical complex
2,000 t about 2,200 short tons
Oil and gasBa Ria–Vung Tau, Vietnam · 2022
-
M&D (MD Factory)
2,000 t about 2,200 short tons
Warehouse and industrialThailand · 2024
-
Tongwei Tien Giang feed factory, phase 1
1,500 t about 1,650 short tons
Animal feedDong Thap Province, Vietnam · 2018
-
New Era cold storage
1,000 t about 1,100 short tons
Cold storage, phase 1 tonnageTay Ninh Province, Vietnam
Weights are structural steel supplied by World Steel, in metric tons. One month of our plant’s output is 2,500 t.
Capacity
Put your tonnage next to a month of our plant
Move the slider to the steel weight of the job you are bidding. It shows how that tonnage compares with one month of World Steel’s fabrication output, so you can judge whether the plant has room for it.
- 20,000 m² (215,000 sq ft) plant site
- 300+ people in engineering, production and QC
- Several projects in the shop in parallel
- Steel shipped to 14 countries
3,000 metric tons
about 3,310 short tons
That is about of one month of World Steel’s fabrication output. That equals about months of the plant’s full output.
A comparison with plant output, not a lead time. Your quote confirms the production slot and ship date for your tonnage.
Check a slot for this jobFlagship project · Oil and gas
Long Son petrochemical complex: more than 56,000 m² of steel structures
At the Long Son petrochemical complex in Ba Ria–Vung Tau, Vietnam, World Steel designed, fabricated and supplied about 2,000 metric tons of steel structures covering more than 56,000 m² (about 600,000 sq ft) for the oil and gas sector. Process plants like this hold steel to strict owner specifications: traceable materials, full inspection records and close coordination with the piping and equipment contractors on a crowded site.
- Sector
- Oil and gas, petrochemical
- Structural steel
- About 2,000 t (2,200 short tons)
- Covered area
- More than 56,000 m² (about 600,000 sq ft)
- Location
- Long Son, Ba Ria–Vung Tau, Vietnam
- Year
- 2022
What we fabricate
Structural steel for the jobs large contractors bid
Pre-engineered buildings are one of our product lines. Large-project work runs across all of these structure types, from the same plant, model and quality system.
Heavy industrial plants
Tall, wide bays with crane runways, brackets and heavy built-up columns sized in the same model as the frame.
See more →Distribution and logistics centers
Large footprints repeated bay after bay, where steel weight per square meter and freight decide the bid.
See more →Multi-story steel frames
Columns, floor beams and bracing for offices, mixed-use and parking structures, detailed for the erection sequence.
See more →Long-span hangars and arenas
Clear spans for aircraft, sports and assembly halls, with the deflection and wind cases checked up front.
See more →Data center shells
Repeatable frames with heavy roof loads for mechanical equipment and tight schedule pressure.
See more →Built-up girders and heavy sections
Plate girders and welded sections cut, fitted and submerged-arc welded on our own beam lines.
See more →Seismic force-resisting frames
Moment and braced frames for high seismic regions, welded with AWS D1.8-qualified procedures and welders.
See more →Something else?
Send the drawings and we tell you plainly whether it fits our shop.
Send a bid package →How a large job runs
From bid documents to the last shipment, one fabricator in charge
The same team carries your job from the take-off to the final container, and you see where every piece is without asking.
-
Bid review and capacity check
Our estimators and engineers read the bid documents, take off the tonnage and confirm the production slot we can hold for it.
-
Design calculations for your Engineer of Record
We prepare calculations and drawings to the code basis of the job, ready for your Engineer of Record to review and approve.
-
Shop drawings, included
One Tekla Structures model produces every erection and assembly drawing, released in the sequences your schedule needs.
-
Fabrication in sequences
The job moves through the shop sequence by sequence, so the steel your erector needs first is made first.
-
Live tracking in PEB Studio
Your project team sees each piece move from cutting to packing, with weld and coating records attached.
-
Hold points you can witness
Inspections can be witnessed live on video, by your own third-party inspector or in person at the plant.
-
Packed and shipped by erection sequence
Members are tagged, bundled and loaded so each shipment arrives at your US port in the order it goes up.
-
Support while your crew erects
The engineers who detailed the steel answer field questions by phone and video until the frame is up.
Prequalification
What your prequalification reviewer will ask for
Large contractors vet a fabricator before the bid goes in. These are the records behind World Steel, each one checkable.
- IAS AC472 accreditationDesign and fabrication of metal building systems, accredited since 2019 and audited twice a year with IAS experts.
- ISO 3834-2 welding qualityFusion welding certified by Bureau Veritas to the comprehensive quality level of EN ISO 3834-2.
- AWS welding proceduresAcceptance per AWS D1.1 for US work, and AWS D1.8-qualified procedures and welders for seismic welds.
- Traceable mill certificatesPlate and sections from mills in Vietnam, traced to each member; EN 10204 3.1 certificates with Charpy results on request.
- Independent inspectionSmith Emery is our inspection partner, and your own inspector can be given remote access to hold points on request.
- Documents for your bid fileCertificates and sample submittal documents are in the download center, ready for your prequalification package.

World Steel
What we design, make and ship
- Design calculations and drawings for your Engineer of Record
- Shop drawings and erection drawings, included
- Fabrication, welding and coating in our plant in Vietnam
- Quality records, mill certificates and inspection access
- Packing by erection sequence and shipping to your US port
- Engineering support during erection by phone and video
The US contractor, our customer
What stays with your team
- Engineer of Record review, approval and PE seal
- Building permit and special inspection arrangements
- Foundations, anchor rods and site work
- Steel erection and the erection crew
- Local trades and final building completion
FAQ
Questions large contractors ask before they award
How much structural steel can World Steel fabricate?
The plant fabricates 2,500 metric tons of structural steel a month, about 2,750 short tons, on a 20,000 m² (215,000 sq ft) site with more than 300 people in engineering, production and quality control.
Can you take a large job while running other work?
Yes. Several projects move through the shop in parallel. When we quote your job, we confirm the production slot and ship date we can hold for its tonnage, so the schedule is agreed before you sign.
Can you deliver a large job in phases?
Yes. The model, the shop drawings and the fabrication are released in sequences, and each shipment is packed in the order your erector needs it at the US port nearest your site.
Do you erect the steel?
No. World Steel designs, fabricates and supplies the steel structure. Erection, foundations and site work are the US contractor’s scope, and our engineers support the erection crew by phone and video.
Who approves and seals the drawings?
The US contractor, our customer, and their Engineer of Record. We prepare calculations and drawings ready for that engineer’s review and approval, and answer review comments on our design.
Can you build to our own engineer’s design?
Yes. Send the design and we price it as drawn, or propose Value Engineering options that your Engineer of Record approves before anything changes.
What documents can you provide for prequalification?
Our IAS AC472 and ISO 3834-2 certificates, sample submittal documents, welding procedures and sample mill certificates. Ask for anything else your prequalification form needs and we tell you what we can supply.
Can we audit the plant before we award?
Yes. Book a video walk-through from the US or visit the plant in Tay Ninh Province, Vietnam. Hold points on your job can also be witnessed remotely.
Open call · US contractors
World Steel is looking for US contractor partners
General contractors, design-build and EPC firms, erectors and dealers who need structural steel: let’s build a long-term, win-win partnership. You win and build the project in your market. Our plant in Vietnam designs, fabricates and supplies the complete steel structure, with 2,500 metric tons a month behind your bids.
You bring
- Your market and owners
- EOR approval and permit
- Foundations and erection
We bring
- 2,500 t a month, own plant
- IAS AC472, first in Vietnam
- Engineering and shop drawings
Bidding a large US job? Send us the steel package.
Upload the bid documents, the tonnage and the bid date. Our estimators and engineers review them and confirm the production slot we can hold for your job.