Colorado · Food and beverage
Structural steel for Colorado food and beverage plants
Weld and Morgan counties process beef, dairy and grain on a large scale, and the Front Range from Golden to Fort Collins is one of the country’s brewing centers. Food and beverage plants need washable steel in the process areas, insulated cold rooms and heavy roof plant, under snow and hail.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and landed on the West Coast and railed to Denver for your Colorado site.
Summit registerFood and beverage plants
- Clusters
- Greeley, Fort Morgan, Golden
- Process areas
- Washable details
- Cold rooms
- Insulated, thermal breaks
- Roofs
- Snow, hail and plant
Why it matters
Clean, cold and built to grow
In process rooms, ledges and pockets collect product and water, so the steel is detailed to drain and to clean. Cold rooms need insulated panels and thermal breaks where steel passes through the envelope, or frost and condensation follow.
Breweries and food plants grow in phases, so we keep the model and the details and design end walls to come off for the next bay. Roof plant for refrigeration goes on dunnage designed for snow and hail exposure.
What we design and fabricate
Steel for food and beverage plants
Washable details
Sealed and sloped details in wet process areas.
Cold rooms
Insulated panels and thermal breaks at the envelope.
Roof plant
Dunnage for refrigeration and air handling.
Coatings
Galvanizing or epoxy systems for wash-down areas.
Who does what
Food plant steel, split clearly
World Steel supplies
- Process hall frames and roof plant steel
- Insulated envelope and thermal break details
- Coating systems for wet areas
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- Food safety design with the owner
- Engineer of Record approval and PE seal
- Local permit and inspections
- Refrigeration and process equipment
- Erection and site work
Colorado
What we do not claim
World Steel names no food or beverage company as a customer and holds no food safety certification for the buildings it supplies; food safety design is set with the owner.
Colorado ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Colorado contractors
Colorado contractors: let’s win the next project together
If your next bid involves food and beverage plants, World Steel wants to be your long-term, win-win steel partner in Colorado. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Colorado project is cut, welded, inspected and packed.
Q&A
What Colorado buyers ask
Can you detail steel for wash-down areas?
Yes. We detail process area steel to drain and to clean, and specify galvanizing or epoxy coatings.
Can the plant grow later?
Yes. We design end walls to come off and keep the model so the next bay matches.
Have you built large food plants?
Yes. CPV Food in Vietnam used 2,500 t of our structural steel. It is published on our projects page.
Official sources: Colorado Department of Agriculture
Colorado solutions
Every Colorado guide
Related pages
Code facts on this page summarize Colorado practice, local IBC adoption, county snow tables, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the county or city building department confirm the code and edition in force for your project.
Building in Colorado?
Send the drawings or the site address, size and use. We set the Colorado design basis with your Engineer of Record, design or detail the steel to your local code, snow table and wind, and quote it made in our plant in Vietnam, packed in erection order for the trip to your site.