What gets tested
Inspection by system
| System | What the inspector checks | Reference |
|---|---|---|
| SFRM (spray-applied) | Surface condition, application, thickness, density and cohesive and adhesive bond strength | IBC Chapter 17, ASTM E605, ASTM E736, AWCI Technical Manual 12-A |
| Mastic and intumescent coatings | Product and listing, surface preparation and primer, dry film thickness against the schedule | IBC Chapter 17, AWCI Technical Manual 12-B, SSPC-PA 2 gauge practice |
| Shop-applied coatings | Shop records and readings, verification on arrival or at the plant, repairs after erection | As agreed with the building official before coating |
| High-rise SFRM | Higher minimum bond strength, rising again above 128 m (420 ft) | IBC Section 403 |
The evidence chain
Records that make acceptance straightforward
-
Approved submittals
Product data, the listed designs, thickness schedule and primer acceptance on file before work starts.
-
Surface preparation
Blast standard, profile and conditions recorded for each batch of members.
-
Batch traceability
Coating batch numbers linked to the members they went on.
-
Thickness readings
Dry film readings by member, at the frequency the inspection standard or specification sets.
-
Repairs logged
Damage, repair and re-measurement recorded with the same care as the original work.
-
Special inspection reports
Filed by the inspector with the building official for final acceptance.
- Our factory Our own IAS AC472 plant in Vietnam, where US orders are fabricated, inspected and bundled for shipping. Visit the factory →
- Completed projects Buildings framed with World Steel steel, from US warehouses and community centers to jobs overseas. See projects →
The shop question
Inspecting fire protection applied away from the site
IBC Chapter 17 lets the building official waive some special inspection of work done in a fabricator’s shop when the fabricator is approved, for example through an accredited program such as IAS AC472. That approval covers structural fabrication. Shop-applied fire protection should not be assumed to be covered; agree the approach with the building official and the special inspector first.
Options include a special inspector at the plant, remote witnessing of readings, an independent coating inspector, or verification of shop records and spot readings when the steel arrives. Whatever is agreed is written into the inspection plan before the first member is coated.
Real photos
From our plant in Vietnam
World Steel’s own shop floors and jobs, where the steel for US projects is made. Not stock images.
How World Steel supports this
Designed to US codes, made in our plant in Vietnam
IAS AC472 accredited plant
The first and only fabricator in Vietnam accredited under IAS AC472.
Remote access for inspectors
Your special inspector can witness readings and review records remotely on request.
Manufacturing Data Record
Mill certificates, coating records and readings in one handover file.
The fire protection ecosystem
Products and solutions behind this guide
The products we make for this part of a seismic structure, the services that come with them and past World Steel projects, all one click away.
Products made in our plant in Vietnam
Solutions that come with it
World Steel projects: process plants, healthcare, multi-story
Photo
Photo
Past World Steel work, shown for the structure type. It does not describe the seismic criteria of any one project.
Standards on this page
Read the standard behind it
Each standard page explains what it covers, the edition we reference and how we apply it. We design and fabricate to these standards; they are not certifications.
Keep reading
Related solutions
Questions from US buyers
Inspection and testing: questions we hear
Does IAS AC472 accreditation cover fire protection?
It covers World Steel’s structural steel fabrication and inspection program. Shop-applied fire protection is agreed separately with your building official and special inspector.
Who measures intumescent thickness on site?
The special inspector, using the practice in AWCI Technical Manual 12-B and calibrated gauges. We supply shop readings by member.
What if a reading is below the required thickness?
The area is built up with the same listed product and measured again. Repairs are recorded like the original work.
Can my inspector visit the plant in Vietnam?
Yes, and remote witnessing is also available on request. The approach is agreed before coating starts.
Are shop drawings included for fire-rated steel?
Yes. Shop drawings come with every project at no extra charge, with the rating, protection system and listed design shown for each rated member. Your Engineer of Record reviews and approves the structural drawings.
A plain-English summary for US buyers, not the code text and not engineering advice for a specific site. The adopted codes and standards govern, and your Engineer of Record confirms the criteria for each project.