Mapping the risk
Where American ground shakes hardest
Not only California. Five regions where seismic design routinely shapes a steel building.
Pacific coast
The San Andreas fault family through California and the Cascadia subduction zone beneath Oregon and Washington.
Alaska
The Aleutian arc wraps southern Alaska; Anchorage designs for some of the highest ground motions in the country.
Intermountain belt
Along the Wasatch Front through Salt Lake City and north through Idaho into Montana.
New Madrid zone
The 1811–1812 sequence still sets elevated design values in Missouri, Arkansas, Tennessee, Kentucky and southern Illinois.
East Coast
Charleston was badly damaged in 1886, and parts of the Carolinas carry seismic design requirements today.
Steel works in your favor because inertia scales with weight, and a metal building is a fraction of the weight of a masonry or tilt-up shell of equal size. The engineering effort lands on the pieces that hold a light frame together: braced bays, knee joints, flange braces and anchor rods. Much of today's connection practice traces back to Northridge in 1994, when inspectors found cracked welds in steel moment frames and the industry rewrote how those joints are qualified.
Six decisions under ASCE 7-22
Turning a street address into seismic design inputs
We publish no regional number. Each input is fixed for your coordinates and your building, then printed with its source at the front of the calculation package.
-
Risk category
How essential the building is: a barn and a fire station are treated very differently
Source: IBC Table 1604.5, settled with your Engineer of Record
-
Site class
How stiff the soil is; ASCE 7-22 adds the in-between classes BC, CD and DE
Source: Your geotechnical engineer's report
-
Ground motions
Spectral accelerations, plus the multi-period spectrum new in this edition
Source: ASCE Hazard Tool output for the exact coordinates
-
Seismic Design Category
A letter from A to F that caps systems, heights and detailing options
Source: ASCE 7-22 Chapter 11
-
Lateral system
Which moment or braced frame resists the shaking, with its R, Ω₀, Cd and height limit
Source: ASCE 7-22 Table 12.2-1, read with AISC 341
-
Supported items
Racking, mezzanines, tanks and rooftop units hung on or braced by the steel
Source: ASCE 7-22 Chapter 13, with equipment and MEP designers
What changes on a light frame
Six details that seismic design touches in a metal building
One-story moment frames
ASCE 7 sets special roof-weight and height limits for single-story steel frames. If yours falls outside them, we switch to a system that fits.
Rods versus members
Tension-only rods handle wind well, yet the code limits them once the category climbs. Then we use members that carry tension and compression, or a portal frame.
Joints sized to the member
Under AISC 341 a connection must outlast the member next to it, so the intended yielding stays in steel and never moves into the bolts.
Stability bracing
Small angles tie rafter and column flanges back to purlins and girts. Size and spacing come from the seismic analysis and appear on the erection set.
Weight above the floor
Mezzanines, crane runways and rooftop units are modeled where they actually sit, with drift and P-delta checked.
Overstrength reactions
Some elements need the Ω₀ load combinations. Those reactions are listed apart from the rest, ready for the ACI 318 seismic anchor checks.
Who does what
How a seismic package moves from our office to your permit
You and your design team
Send the basics
Site address, architectural drawings and the soil report. No report yet? We state the site class we assumed and what would change.
Review and approve
Your Engineer of Record reviews and approves the submittal; the PE seal and permit are the US contractor's scope.
World Steel engineers
Criteria in writing
Risk category, site class, category and lateral system confirmed with your Engineer of Record before anything is sized.
One combined model
Earthquake, wind and snow run together in SAP2000; on many western sites wind or snow sizes the frames and seismic sizes braces, joints and anchors.
Detailed piece by piece
Braces, gussets and base plates modeled in Tekla Structures at their design forces, each with a piece mark on the erection set.
World Steel plant
Seismic welds
Welded with AWS D1.8-qualified procedures and welders, with the inspection plan for the lateral system.
Factory evidence
The Manufacturing Data Record collects material, weld and inspection evidence for every brace and frame that resists the earthquake.
Included in the submittal
Seismic deliverables for your Engineer of Record
- >Front-page summary of every seismic parameter and its source
- >SAP2000 output covering story drift and stability
- >Column reactions per load case; Ω₀ cases called out separately
- >Anchor rod plan showing every base plate
- >Erection drawings locating braced bays and their connections
- >IFC file of the steel for clash checks with architecture and MEP
- >Welding procedures and the inspection plan for the lateral system
- >A response letter for each round of plan-check comments
Our largest jobs, from a plant that fabricates 2,500 metric tons of structural steel a month. Large-project program.
Built to American codes
World Steel references engineered to US standards
Each was designed to US codes, fabricated in Vietnam and shipped packed in erection sequence.
Asked by US project teams
Seismic design questions
10 answers from our engineers, grouped by topic.
Your seismic category 4 answers
Which load controls my metal building: wind, snow or earthquake?
That depends on the site, and often the answer differs by member. Across much of the West, wind or snow sets the frame sizes while seismic sets bracing, certain connections and the anchorage. Every member is checked for every combination and sized for the worst.
How is my Seismic Design Category determined?
From three inputs: the ground motions at your coordinates, the soil site class and the building's risk category. Once the geotechnical report is in, we confirm the category with your Engineer of Record and print it on the calculations.
Can you start before we have a soil report?
Yes, for pricing and preliminary design, on assumptions we state in writing. Final design needs the site class from a geotechnical report, and good soil data under ASCE 7-22 can reduce the seismic forces.
Our county still enforces an older IBC. Does that matter?
Not to us. IBC 2024 with ASCE 7-22 is our starting point, and we design to the edition your jurisdiction enforces whenever the permit calls for it. The basis is fixed at kickoff.
Frames, joints and welds 3 answers
When does AISC 341 apply to a metal building?
When the design uses a steel seismic system with a response modification coefficient R greater than 3, which is the usual route in Seismic Design Category D and above. In categories B and C a system with R of 3 can often be used without AISC 341 detailing. Your Engineer of Record confirms the choice.
Are your seismic welds made to AWS D1.8?
Welds in the seismic force-resisting system are made with AWS D1.8-qualified welding procedures and welders in our plant, with the records in the Manufacturing Data Record. No AWS company certification is held or claimed.
Can rod bracing be used in a high seismic area?
Sometimes, within the limits ASCE 7 and AISC 341 set for the system and category. Where rods are not allowed, we switch to angle, HSS or portal bracing that carries tension and compression.
Approval and supply 3 answers
Who stamps the seismic calculations?
Our engineers produce the calculation package and drawings. Your Engineer of Record reviews and approves them, and the PE seal and permit are the scope of the US contractor, our customer.
Can you supply the seismic frames for a large West Coast project?
Yes. Our plant fabricates 2,500 metric tons of structural steel a month, and seismic frames are welded with AWS D1.8-qualified procedures and welders. Large jobs ship in erection-sequence loads.
Where can I read more on seismic steel?
Our seismic steel structures group covers Seismic Design Categories, AISC 341 systems, connections and inspection in more depth, and the California solutions group covers the state's own requirements.
Keep reading
Related engineering guides
Each one goes deeper on a part of the design this page touches.
- Seismic steel structures hub
- Seismic Design Categories A–F
- AISC 341 seismic provisions
- ASCE 7-22 design loads
- Connections & load path
- Wind & seismic design process
- AWS D1.1 welding
- AWS D1.8 seismic welding
- IAS AC472 accreditation
- California steel solutions
All eight US site-condition guides, the standards we design to and the IAS AC472 program are on the engineering & standards hub.
Proof at scale
Photo
Photo
Get an engineer’s eyes on your US building
Share drawings, a sketch or the footprint and site address. We agree the design criteria with your Engineer of Record, then send a written scope and the list of submittals, from a plant that fabricates 2,500 metric tons of structural steel a month.