Minnesota · Food and agribusiness
Structural steel for Minnesota food and agribusiness plants
Minnesota is home to some of the largest food and agribusiness companies in the US, and to the plants that serve them: pork and turkey processing in the south, dairy plants, sugar beet plants in the Red River Valley, feed mills and ethanol plants on the prairie. They run year round, wet inside and frozen outside.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and sent by rail on the northern route to your Minnesota site.
- Plants
- Meat, dairy, sugar, feed
- Clusters
- South, central, Red River
- Inside
- Wet, washed daily
- Outside
- Snow and deep frost
Why it matters
Wet inside, frozen outside
In process rooms, ledges and pockets collect product and water, so the steel is detailed to drain and to clean, and coated for daily washing. Coolers and freezers need a continuous insulated envelope with thermal breaks where steel passes through. Refrigeration and air handling add heavy roof platforms, and snow drifts against them.
Our plant built 2,500 t of steel for the CPV Food processing factory in Vietnam, and steel for Haid feed plants, a repeat customer. We design or detail process halls, cold room steel and roof platforms, and specify galvanizing or epoxy coatings for wet areas.
What we design and fabricate
Steel for food and agribusiness plants
Washable details
Sealed and sloped details in wash-down areas.
Cold rooms
Insulated envelopes and thermal breaks.
Roof plant
Refrigeration platforms designed with their drift.
Coatings
Galvanizing or epoxy for wet areas.
Who does what
Food plant steel, split clearly
World Steel supplies
- Process hall, cold room and platform design or detailing
- Thermal break and envelope steel details
- Coating systems for wash-down areas
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- Food safety and sanitary design with the owner
- Engineer of Record approval and PE seal
- Permit and inspections
- Refrigeration and process equipment
- Erection and site work
Minnesota
What we do not claim
World Steel names no food or agribusiness company in Minnesota as a customer and holds no food safety certification for buildings. CPV Food and Haid are projects in Vietnam.
Minnesota ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Minnesota contractors
Minnesota contractors: let’s win the next project together
If your next bid involves food and agribusiness plants, World Steel wants to be your long-term, win-win steel partner in Minnesota. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Minnesota project is cut, welded, inspected and packed.
Q&A
What Minnesota buyers ask
Can you detail steel for daily wash-down?
Yes. We detail process steel to drain and to clean, and specify galvanizing or epoxy coatings for daily washing.
Do you supply feed and grain buildings?
Yes. Feed mill buildings, grain and equipment buildings designed for the site snow and wind.
Have you built food plants?
Yes. Our plant supplied 2,500 t of steel for the CPV Food processing factory in Vietnam.
Official sources: Minnesota Department of Agriculture
Minnesota solutions
Every Minnesota guide
Related pages
Code facts on this page summarize Minnesota practice, the Minnesota State Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in Minnesota?
Send the drawings or the site address, size and use. We set the Minnesota design basis with your Engineer of Record, design or detail the steel to the Minnesota State Building Code and to snow, drift and frost, and quote it made in our plant in Vietnam, packed in erection order for rail on the northern route to your site.