Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Open call · Caribbean and CARICOM contractors

World Steel is looking for Caribbean contractor partners

You win the project, keep the client and build it on your island. We design, detail and fabricate the structural steel in our own plant in Vietnam, 2,500 t (about 2,750 US tons) a month, and ship it packed in erection order to your port. Shop drawings come with every job at no extra cost.

2,500 ta month from our own plant
5,000 tlargest single job, Sunpro Steel
26Caribbean countries and territories
Includedshop drawings on every job

Capacity first

Our plant capacity becomes your capacity in the islands

Large island work, a port warehouse, a power or energy plant, a resort phase, a rebuild program of schools, is often too big for the fabricators within reach. Our own plant fabricates 2,500 t of structural steel a month and releases big packages area by area, so you can bid the large jobs with a fabricator that has already delivered them.

One plant, 2,500 t a month

Cutting, welding, blasting and coating under one roof in Tay Ninh Province, Vietnam, accredited under IAS AC472 since 2019 and audited twice a year.

Released area by area

A large package is split into erection areas and fabricated in that order, so your crew can start on the first area while the next ones are still in the shop.

Laser cutting to 100 mm

Laser machines cut plate up to 100 mm thick and make the bolt holes, so heavy base plates and connections come from the same plant.

Built-up members in-house

Welded plate girders, box and cruciform columns and crane runway girders for long spans and heavy loads.

Flagship jobs, metric tons

Sunpro Steel Factory, steel structure by World Steel Sunpro Steel FactorySteel industry · Can Tho City, Vietnam · 2024 5,000 tabout 5,500 short tons
CPV Food Processing Factory, steel structure by World Steel CPV Food Processing FactoryFood processing · Dong Nai Province, Vietnam · 2020 2,500 tabout 2,750 short tons
Long Son petrochemical complex, steel structure by World Steel Long Son petrochemical complexOil and gas · Ba Ria–Vung Tau, Vietnam · 2022 2,000 tabout 2,200 short tons
M&D (MD Factory), steel structure by World Steel M&D (MD Factory)Warehouse and industrial · Thailand · 2024 2,000 tabout 2,200 short tons
New Era cold storage, steel structure by World Steel New Era cold storageCold storage, phase 1 tonnage · Tay Ninh Province, Vietnam 1,000 tabout 1,100 short tons

Plant output 2,500 t (about 2,750 US tons) a month. How large jobs run

In the Caribbean we have already supplied 18 footbridges, two warehouses and a two-floor mosque for Guyana. Pedestrian bridges →

Win-win, island after island

What each shore brings, and what we both win

The line between us is simple and written into every agreement: you own the island side, we own the plant side, and the steel crosses the sea between.

Your island side

The contractor, our customer

  • The client, the bid and the contract
  • Local codes, the authority and your engineer of record
  • Drawing approval, the seal and the building permit
  • Port clearance with your broker and delivery to site
  • Foundations, erection crews, cranes and site work

Our plant side

World Steel, in Vietnam

  • Design to the wind, seismic and exposure basis your engineer sets
  • Approval, shop and erection drawings at no extra cost
  • Fabrication, blasting and coating for salt air
  • Erection-order packing, piece marks and packing lists
  • Live tracking in PEB Studio and engineers on call
Bid larger jobs

Capacity behind your bid that no island shop can match.

Fewer site fixes

Every member checked in the plant before it ships.

One steel supplier

Frames, built-up members, purlins and connections from one plant.

Easier repeat jobs

The next job starts from your approved setup, not a blank form.

Honest scope. World Steel designs and fabricates to the code basis your engineer of record sets in each country. We hold no local approval, licence or registration in any Caribbean country and do not apply for permits. We supply the steel structure only; erection and site work are the contractor’s.

Backing on every Caribbean bid

What a partner gets on hurricane coasts and salt-air sites

The engineering and plant support that comes with each job, with the in-depth Caribbean guide behind every card.

Hurricane wind design

Wind speed, exposure and enclosure from your engineer, checked from the roof sheet to the anchor bolt.

Hurricane wind design →

Coatings for salt air

ISO 12944 C5 and CX systems from Jotun, PPG, Carboline, Hempel, Nippon or International Paint, sold in the region for touch-up.

Salt air: C5 and CX →

Galvanizing and duplex

Hot-dip galvanizing arranged with a galvanizer named for the project, painted over where the spray zone calls for duplex.

Galvanizing and duplex →

Earthquake detailing

Seismic frames detailed to AISC 341 where the code requires it, welded by AWS D1.8-qualified welders.

Earthquakes and hurricanes →

Shop drawings included

Approval, shop and erection drawings from the Tekla model, at no extra cost on every project.

Shop drawings →

PEB Studio tracking

Follow each member from cutting to loading in real time and plan the site around real progress.

PEB Studio →

Overhead cranes on request

Cranes supplied with the building when you ask, with runway girders designed for them.

Overhead cranes →

Inspection your way

Hold points agreed in the inspection plan for each job; your inspector can witness in the plant or join an online audit.

Online factory audit →

Ways to work together

Four ways to partner, all backed by one plant

Pick the one that matches how you win work in the islands. Each is written into an agreement for the job or the program it covers, with no exclusivity asked.

One job at a time

Bid partner

Send the tender or drawings of a job you are bidding. We return a technical review, the steel scope and drawings you can bid with.

A series of buildings

Program partner

Hotels, warehouses or plants across several islands under one agreement, one inspection plan format and one design team, job after job.

After a hurricane

Rebuild partner

Schools, shelters and clinics from one steel family designed once, fabricated side by side and packed island by island.

OEM under your name

Your brand

Piece labels, bundle tags and product labels carry your brand. Materials for OEM jobs come 100% from Vietnam plants.

After a storm, a rebuild program runs best as a steel family: hurricane rebuild programs.

How it starts

From your first email to steel on the quay

Send a job or your profile

An open tender, a set of drawings or just your company and the work you bid.

Review and design basis

Our engineers check the job and agree wind, seismic and exposure with your engineer of record.

Scope split in writing

Who supplies what is written into the agreement, so nothing falls between us.

Approval and shop drawings

Your engineer approves the design; shop and erection drawings follow at no extra cost.

Fabrication you can follow

Cut, welded, inspected and coated in our plant, member by member in PEB Studio.

Shipped to your port

Bundles in erection order with piece marks and packing lists, ready for your crew.

Made for Guyana in our plant

Caribbean steel, cut, drilled and marked piece by piece

Real World Steel photos of two Guyana jobs in fabrication in our plant in Vietnam: the 18 footbridges and a two-floor mosque in Georgetown. Shop photos, not site photos.

18 pedestrian bridges for Guyana

Fitter drilling bolt holes in welded bridge girders in the World Steel plant
Two long welded plate girders with drilled splice holes for the Guyana footbridges
Fitter beside a truss chord assembly on the shop floor with its drawing
Overhead crane moving long welded bridge girders along the shop
Drilled splice bolt patterns on the ends of welded bridge girders
Fitter drilling a stiffened bridge girder marked with its piece mark
Cut and drilled connection plates marked with the bridge job number
Operator at the CNC cutting table nesting connection plates

A mosque in Georgetown, two floors, girders up to 1.5 m (4.9 ft) deep

Deep plate girder for the Guyana Mosque fitted up from plate
Welding a deep girder for the Guyana Mosque beside its end plate
Painted plate girders with drilled end plates for the Guyana Mosque
Painted members for the Guyana Mosque strapped into bundles for shipment
See the Guyana Mosque project →

Apply now

Become World Steel’s partner on your island

One short form: your company, the work you bid and the countries you build in. Attach an open tender and we start with a technical review of that job. Prefer to talk first? Message us on WhatsApp.

Not a contractor?

Suppliers and vendors

This program is for contractors who buy structural steel. Suppliers who want to work with World Steel, please visit our group site.

worldsteelgroup.com

Building in the United States too? US contractor partnership

Q&A

What Caribbean contractors ask before partnering with us

Does World Steel erect steel in the Caribbean?

No. World Steel designs, details, fabricates, coats and ships the steel structure. The contractor, our customer, erects it with its own crews and runs the site. That is why we do not compete with you: we only win when you win the job.

Who approves and seals the drawings?

Your engineer of record, registered in the country where the building stands. We state the design basis on sheet one of the calculations and supply approval drawings for review. World Steel holds no local licence or registration and does not apply for permits; your team files them.

Which building codes do you design to?

The basis your engineer of record and the local authority name: the Caribbean Uniform Building Code, the OECS Building Code, a national code, or the IBC with ASCE 7 loads. The steel is designed to that basis and every value is stated in mm and kg first.

Are shop drawings charged separately?

No. Approval, shop and erection drawings are included on every project at no extra cost, drawn from the Tekla model with piece marks your crew erects from.

How large a job can you take on?

Our own plant fabricates 2,500 t (about 2,750 US tons) of structural steel a month. Our largest single job is the Sunpro Steel factory at 5,000 t. Large packages are released area by area so erection can start early.

How does the steel reach my island?

From our plant through Cai Mep in Vietnam, across the Pacific and through the Panama Canal to your port, directly or through a regional transshipment hub. Port clearance is handled with your broker under the Incoterm agreed in the contract.

How do the coatings hold up in salt air?

Each member gets a system chosen for its ISO 12944 corrosivity, from C5 on the coast to CX in the spray zone, with hot-dip galvanizing or duplex where the spec asks for it. We use brands sold in the region, such as Jotun, PPG and Hempel, so touch-up paint is easy to buy.

Do we have to sign an exclusive agreement?

No. You partner with us on the jobs that suit you. A program agreement simply keeps your design basis, inspection plan and labels on file so each new job starts faster.

Can we inspect the steel before it ships?

Yes. Hold and witness points are agreed in the inspection plan for each job. Your inspector can visit our plant in Vietnam or join an online factory audit, and every member’s QC release shows in PEB Studio.

Can you supply overhead cranes with the building?

Yes, on request. We supply the cranes with the building and design the runway girders and crane columns for them.

Do you have work in the Caribbean already?

Yes. We have supplied 18 footbridges, two warehouses and the steel structure of a mosque in Georgetown for Guyana. Our larger references, up to 5,000 t, are industrial plants in Vietnam and Thailand that you can show an owner.

We are a supplier, not a contractor. Who do we contact?

This program is for contractors who buy structural steel. Suppliers who want to work with World Steel, please visit worldsteelgroup.com.

Bidding a steel job in the Caribbean?

Send the tender or just the island, site, size and use. We agree the design basis with your engineer of record, design and coat the steel for hurricane wind and salt air, and quote it made in our plant in Vietnam and shipped to your port.