Responsibility diagram
Who does what under DPU, stage by stage
From packing at our plant in Vietnam to unloading at your US site. Navy is World Steel, red is you, and the dashed red line is where the risk of loss or damage passes to you.
Example of a named place: DPU named laydown yard, Savannah, Georgia (Incoterms® 2020). The quote states the exact place, because it moves the hand-over points.
Cost, risk and insurance
Paying for a leg is not the same as carrying its risk
Under every Incoterms® rule, cost and risk can pass at different points. Under DPU they work like this.
Where risk passes
When the steel has been unloaded at the named place.
Who pays for what
Everything to the named place, including unloading, is ours. US customs entry and duties are yours.
Cargo insurance
Not required of either party. We carry the risk until unloading, so we insure our own interest.
US customs and duties
You are the importer of record
You, or the party you appoint, act as US importer of record and pay any duties, including Section 232.
Imported steel can be subject to US duties, including Section 232, and the rules change by proclamation. We publish no duty rates or landed costs. Our Section 232 page summarizes the current rules from official sources, and your licensed customs broker confirms the classification at entry.
-
Commercial invoice by line
Members and accessories grouped so each HTSUS line can be classified, with weights in kg and lb.
-
EN 10204 3.1 mill certificates
Mill, grade and heat number for the melt-and-pour declaration.
-
Certificate of origin
Steel made in our plant in Vietnam, with the mill and country of each heat on its certificate.
-
Documents in PEB Studio
Released to your broker’s login before the vessel arrives.
When it fits
DPU works well for
- Laydown yards and terminalsSteel landed at a yard where a crane or forklift is already arranged.
- Phased deliveriesLots unloaded at a staging yard ahead of the erection sequence.
Watch out for
Points to settle before you sign
- Unloading must be possibleWe can only agree DPU where we can arrange unloading at the named place.
- Customs is still yoursAs with DAP, the entry must be cleared before delivery.
Our part under DPU
Bundles are tagged and packed in erection order, so the yard can unload and stage them in the order your erector sets them. Each arrival is logged in PEB Studio by QR scan.
Why trade with World Steel
We know DPU, the US market and international trade
Buying steel from another country should not mean guessing who pays what. Our team prepares export files from Vietnam, works with US forwarders, customs brokers and truckers, and writes every quote so the Incoterm, the named place, the importer of record and the party carrying any duties are clear before you sign.
We work in English.
Your project manager, engineers and logistics team write, call and draw in English: quotes, contracts, shop drawings, packing lists, customs documents and PEB Studio. No interpreters and no language barrier, at hours that suit your US time zone.
We know the US market
Gateway ports, customs entries, Section 232, inland trucking and rail, and the US codes your building is designed to.
International trade is our routine
Export clearance in Vietnam, bills of lading, certificates of origin, mill certificates and bank documents, prepared in-house.
Every term, in writing
Each quote names the Incoterm, the named place, the importer of record and who carries duties. Nothing is left to assumption.
One language from quote to closeout
English across email, video calls, drawings and documents, so your broker, erector and lender read the same file.
Live in PEB Studio
Production, packing, seal numbers and documents released in real time, whichever term you buy on.
One accredited plant
Made in our own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472.
US gateway ports
Where a DPU shipment lands
We pick the port that keeps the inland leg short and has a suitable sailing from southern Vietnam. Each port page shows its terminals, rail links and the states it serves.
State guides
Building in a specific state?
Each state guide covers the code edition, wind, snow and seismic conditions, the ports that serve it and how steel reaches the site.
Questions from US buyers
DPU questions we hear
Is DPU the same as the old DAT?
Incoterms® 2020 renamed DAT to DPU and allowed any named place, not only a terminal. The seller still unloads.
Which Incoterm will my World Steel quote use?
The one you ask for, where it suits the job. FOB, CFR, CIF and DAP are the terms we quote most for US projects; DDP is quoted case by case. Every quote names the Incoterm, the named place and the importer of record in writing.
Does DPU decide when I own the steel or when I pay?
No. Incoterms® rules allocate delivery, costs, risk and customs formalities. Title, payment terms and remedies are set by the sales contract, which we write in English.
Incoterms® 2020
Compare with the other ten rules
Every rule has its own page with the same responsibility diagram, so you can compare what changes from one term to the next.
Closest to DPU: DAP (Delivered at Place), DDP (Delivered Duty Paid). Or see all eleven side by side.