Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Trucks loaded with fabricated steel leaving the World Steel plant, seen from the air

The plant that fabricates US orders: World Steel in Tay Ninh Province, Vietnam (Hai Son Industrial Park, formerly Long An).

Request a quote

Bring us the job. We will tell you how our plant can build it.

From a single warehouse to a 5,000-ton bid package, every route below reaches the estimators and engineers who quote structural steel fabricated in our own plant in Vietnam and shipped to your US port.

2,500 metric tons of structural steel a month

Quote routes

Pick the route that sounds like your job

Each route keeps the form short and asks only what an estimator or engineer needs to scope and quote your steel.

For large US jobs I have a bid package for a large job Bidding a large US project? Upload the bid documents and tell us the tonnage and bid date. Our estimators and engineers review them and confirm the production slot we can hold for your job. Have ready: Bid set, estimated tonnage, bid date Start the bid package →

How quoting works

From your files to a written scope and a held slot

  1. You send the job

    Pick a route, fill in the few fields it asks for and upload what you have.

  2. We take it off

    Estimators read the documents and take off the steel, with engineers checking the code basis.

  3. You get the scope

    A written scope of supply: what World Steel designs, fabricates and ships, and what stays with your US team.

  4. Slot and ship date

    The quote confirms the production slot and ship date we can hold for your tonnage.

  • Files stay privateUploads go to private storage, are named at random and are only opened by our team.
  • Shop drawings includedShop and erection drawings are part of every project, at no extra cost.
  • Tracked in PEB StudioOnce you order, your team follows each piece from cutting to packing in real time.

Before you send

Questions about quoting

Something else? Write it in the message box and an engineer answers with your quote.

Which route should I pick?

The one that sounds most like where your project stands. Bidding a large job with documents in hand? Use the bid package route. Not sure? Send a message from the contact page and we route it for you.

How large a job can World Steel quote?

Our plant fabricates 2,500 metric tons of structural steel a month, about 2,750 short tons. Our largest delivered package is the Sunpro Steel factory at 5,000 metric tons, and several projects run through the shop in parallel.

Do you publish prices?

No. Structural steel is priced job by job from the drawings, the code basis, the coating and the delivery port. Send what you have and we quote that job.

Who erects the steel and seals the drawings?

The US contractor, our customer. World Steel designs, fabricates and supplies the steel structure. Erection, drawing approval by your Engineer of Record, the PE seal and the permit stay with your US team.

Is my upload safe?

Files go to private storage under random names, are scanned where the host allows it, and are opened only by our estimating and engineering team.

Rather talk to an estimator first?

Call or message our hotline, or book a video walk-through of the plant before you send anything.