Hawaii · Warehouses
Structural steel for Hawaii harbor warehouses and distribution
Hawaii imports most of what it uses by sea, so warehouses, cold storage and distribution buildings cluster near Honolulu Harbor, Kapolei and Kahului. Land is scarce and expensive, buildings are tall and dense, and salt air is everywhere. We fabricate their clear-span steel with coatings to suit.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped by ocean freight to Honolulu for your Hawaii site.
- Hubs
- Kapolei, Sand Island, Kahului
- Land
- Scarce, dense sites
- Coatings
- For salt air
- Release
- Area by area
Why it matters
Warehouses where land is scarce
A distribution building in Kapolei makes the most of a small parcel with tall clear heights and tight truck courts, and every member is exposed to salt air and hurricane wind.
We release the steel in the order your team erects it, galvanize or coat it for the exposure and pack each area together in containers for the voyage.
What we design and fabricate
Steel for distribution centers
Clear-span frames
Wide bays with tall clear heights.
Dock door framing
Jambs and headers for many doors in a row.
Wall bracing
Bracing laid out around the dock doors.
Roof-ready steel
Purlins sized for future solar or units on request.
Who does what
Warehouse steel, split clearly
World Steel supplies
- Clear-span frames, bracing, purlins and girts
- Dock door framing and canopies
- Area-by-area releases packed in erection order
- Live production tracking in PEB Studio
- Tekla shop and erection drawings, included
The US contractor arranges
- Site plan, slab and paving
- Engineer of Record approval and PE seal
- Doors, docks and racking
- Fire protection and utilities
- Erection and site work
Hawaii
What we do not claim
World Steel names no Hawaii logistics company or developer as a customer and claims no completed Hawaii warehouse. Photos show World Steel projects abroad.
Hawaii ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Hawaii contractors
Hawaii contractors: let’s win the next project together
If your next bid involves harbor warehouses, World Steel wants to be your long-term, win-win steel partner in Hawaii. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Hawaii project is cut, welded, inspected and packed.
Q&A
What Hawaii buyers ask
Can you build tall clear heights?
Yes. We design frames for the clear height and racking your team sets.
Can the steel ship in containers?
Yes. We pack bundles to suit containers or breakbulk.
Do you supply racking?
No. Racking and dock equipment are your team’s scope.
Official sources: Hawaii Department of Business, Economic Development and Tourism
Hawaii solutions
Every Hawaii guide
Related pages
Code facts on this page summarize Hawaii practice, the Hawaii State Building Code as your county adopts it, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in Hawaii?
Send the drawings or the site address, size and use. We set the Hawaii design basis with your Engineer of Record, design or detail the steel to your county’s code, hurricane wind and island seismic, coat it for salt air, and quote it made in our plant in Vietnam, packed in erection order and shipped by ocean freight to Honolulu.