Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Arizona · Ports and overland

From our plant in Vietnam to your Arizona site

Arizona has no seaport, so every ton of imported steel lands on the coast and finishes its trip overland. Most of it comes through Los Angeles and Long Beach and travels east on I-10 by truck, or by rail to ramps in the Phoenix area. We plan the packing, member lengths and shipment order around that last leg from the start.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, and delivered to your Arizona site through the Southern California ports.

Rows of labeled steel bundles ready to leave the plant
Labeled bundles lined up for dispatch from World Steel in Vietnam.
Gateway
Los Angeles and Long Beach
Overland
Truck on I-10 or rail to Phoenix
Packing
Erection order, road-legal lengths
Tracking
Every bundle in PEB Studio

Gateways and routes

How the steel gets to Arizona

Port of Los Angeles

Container and breakbulk terminals in San Pedro Bay, with rail and truck links to the Inland Empire and I-10.

Port page →

Port of Long Beach

The neighboring port, with on-dock rail and terminals for containers and project cargo.

Port page →

Rail to the Valley

Rail ramps and transload yards in the Phoenix area for heavy or high-volume packages.

Truck on I-10

Direct truck delivery from the ports to Phoenix, Pinal County and Tucson, scheduled to your erection sequence.

Planned for the haul

Packing for an overland finish

Road-legal lengths

Members sized and spliced so standard trucks can carry them without special permits where possible.

Erection-order bundles

Bundles packed and labeled by sequence, so each truck brings the next pieces the crew needs.

Container or breakbulk

Container loading for most members, breakbulk for oversize pieces, chosen per package.

Tracked to the site

Bundle lists and loading photos in PEB Studio, from the plant to the port of discharge.

What we do not publish

No transit times, freight rates or duty rates. Sailings and inland transport are confirmed when the cargo is booked, and each quote names the port of discharge, the Incoterm and the importer of record.

Arizona ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · Arizona contractors

Arizona contractors: let’s win the next project together

If your next bid involves ports and overland, World Steel wants to be your long-term, win-win steel partner in Arizona. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Arizona project is cut, welded, inspected and packed.

Black-coated members bundled on a loading rack
Black-coated bundles staged on the loading rack, World Steel, Vietnam.
Steel bundles stacked high on a packing frame awaiting loading
A packing frame in the Vietnam plant stacked with bundles before they are loaded out.
Packing hall with steel bundles, timber dunnage and loading racks
Timber dunnage and bundles in the packing hall at the Vietnam plant.
Trucks loaded with fabricated steel leaving the World Steel plant, seen from the air
The plant that fabricates US orders: World Steel in Tay Ninh Province, Vietnam (Hai Son Industrial Park, formerly Long An).

Q&A

What Arizona buyers ask

Which port is best for an Arizona project?

Usually Los Angeles or Long Beach, the closest major ports to Phoenix and Tucson. We choose between them by sailing, terminal and inland connection for your package.

Can you deliver to the site?

Yes, under the Incoterm you choose. With a delivered term we arrange the inland leg to your site; with a port term your contractor or forwarder takes over at the port.

How are long members shipped?

Members are spliced where the design allows so they fit containers and standard trucks. Oversize members travel as breakbulk with the right permits.

Official sources: Port of Los Angeles: facts and figures

Arizona solutions

Every Arizona guide

Related pages

Code facts on this page summarize Arizona practice, the International Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building official confirm the edition and local amendments in force for your permit.

Building in Arizona?

Send the drawings or the site address, size and use. We set the Arizona design basis with your Engineer of Record, design or detail the steel and quote it made in our plant in Vietnam, packed in erection order for the haul to your site.