Designed to
ASCE 7-22 under IBC 2024, or the edition your jurisdiction enforces
Checked twice
Frames and bracing (MWFRS), then every panel, purlin and fastener (C&C)
New in ASCE 7-22
Tornado loads for Risk Category III and IV buildings in tornado-prone areas
Sign-off
Wind criteria approved in writing by your Engineer of Record before sizing
The signature of wind design
Four zones, four fastening plans
Each zone gets its own purlin spacing, screw pattern and trim fastening, and the zone map goes on the erection drawings.
- Corner zones
Highest suction on the roof. Purlins move closer together, panel screws are spaced tighter and clips are checked for the peak uplift.
- Edge zones
A band along eaves and rakes where separating air lifts the panels. Denser fastening than the field, and trims fastened for the same pressure.
- Field zone
The middle of the roof, with the lowest uplift. Standard purlin spacing and fastener pattern, still sized for the site wind.
- Wall end zones
The last few meters of each wall at the corners carry higher pressure, so girts and screws there are heavier than mid-wall.
Two separate checks
Why a sound frame can still lose its roof
ASCE 7 looks at wind at two scales. Mixing them up is the most common reason a metal building keeps its frames and loses its skin.
Main wind force-resisting system
Frames, rafters, columns and bracing feel pressure averaged over a large tributary area, which smooths out short gusts. Our SAP2000 model sizes them for overall wind together with snow, seismic and collateral loads.
- Rigid frames and knee joints
- Roof and wall bracing
- Column bases and anchor reactions
Components and cladding
Panels, screws, purlins and girts feel brief, concentrated peaks over a few square meters, and those peaks run much higher. A second set of checks sizes every secondary member and fastener for the pressure in its own zone.
- Roof and wall panels with their screw pattern
- Purlins, girts, laps and bridging
- Trims, flashings, doors and framed openings
The zones and fastener patterns are drawn on the erection drawings, so the crew installs what the calculation assumed. See how our wind and seismic design runs.
What sets the number
Six inputs behind the design wind pressure
Each one is fixed for your coordinates and your building, then printed with its source at the front of the calculation package.
Risk category
Schools, shelters and emergency facilities are designed for rarer, harsher wind than a typical warehouse.
Decided by · Owner with the Engineer of Record
Basic wind speed
Pulled for your coordinates and risk category from the ASCE 7-22 hazard data. We print no regional number.
Decided by · Engineer of Record
Exposure category
Open fields, prairie and shoreline (C or D) raise pressure; trees and suburbs (B) lower it.
Decided by · Engineer of Record after a site review
Topography
Ridges, escarpments and hilltops speed the wind up near the crest.
Decided by · Engineer of Record from site contours
Enclosure
Dock doors and other large openings can let wind inflate the building from inside.
Decided by · Architect, from door and window sizes
Geometry
Roof pitch, eave height and plan size all shift the pressure coefficients.
Decided by · Architect and World Steel
Beyond the zone map
Where the building gets extra wind detailing
Canopies and overhangs
Wind loads them from above and below at once, so they get their own uplift design and connections.
Overhead doors
A door must be rated for at least the pressure at its location, and the jambs and header are designed for the door's reactions.
Internal pressure
A dock or hangar door that might be open, or might fail, in a storm makes the building partially enclosed in the calculations, and every load goes up.
Purlin stability
Uplift puts the unbraced purlin flange in compression, so bridging and anti-roll devices go where the calculation shows they are needed.
Large-project capacity
2,500 t of structural steel a month
World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so a large US package is a normal month, not a stretch.
How large jobs run- Sunpro Steel Factory · Steel industry 5,000 t
- CPV Food Processing Factory · Food processing 2,500 t
- Long Son petrochemical complex · Oil and gas 2,000 t
- M&D (MD Factory) · Warehouse and industrial 2,000 t
- Tongwei Tien Giang feed factory, phase 1 · Animal feed 1,500 t
- New Era cold storage · Cold storage, phase 1 tonnage 1,000 t
Compare suppliers
Six envelope questions to put to any metal building supplier
Print them, send them with your bid invitation, and compare the answers side by side.
- Is roof uplift capacity based on a test of the whole assembly or only the panel?
- Do the drawings show screw type, size and spacing for each roof and wall zone?
- Do purlin and girt sizes change between zones, and is the bracing shown?
- How do the door and window pressure ratings compare with the calculated pressure?
- Is glazing impact-protected where the site falls in a wind-borne debris region?
- How are trims and flashings fastened at eaves, rakes and the ridge?
World Steel answers every one of them on the drawings: zone maps, screw patterns and member sizes per zone, with shop drawings included at no extra charge.
Delivered
US buildings designed with zone-by-zone wind checks
Designed to US codes, fabricated in our plant in Vietnam and shipped packed in erection sequence.
Asked by US project teams
High-wind design questions
11 answers from our engineers, grouped by topic.
Pressure zones 4 answers
Why do roof corners get more screws than the middle of the roof?
Air separates as it passes a roof edge and creates intense local suction that peaks at the corners. ASCE 7 assigns those zones higher pressures, so purlin spacing tightens and fastener patterns get denser there.
Are the zone widths the same on every building?
No. ASCE 7 sets the width of edge and corner zones from the building's least plan dimension and its eave height, so a tall narrow building and a long low warehouse get different zone maps. We draw yours on the erection set.
Do walls have zones too?
Yes. Wall corners carry higher pressure than mid-wall, so the end bays get heavier girts and tighter screw spacing. Doors and windows in those zones need a higher rating than the same unit placed mid-wall.
What does a canopy add to the wind design?
A canopy is loaded from above and below at the same time, so it carries net pressure far higher than the wall beside it. It gets its own members, connections and back-span check on the frame.
Doors and enclosure 3 answers
When is a warehouse treated as “partially enclosed”?
When one wall has openings that are large compared with the rest of the envelope. Wind can then rush in and lift the roof from below, so the design uses higher internal pressure, or the doors are rated to stay shut under design wind.
Can we design as enclosed and just keep the doors shut in a storm?
Only if the doors are rated for the design pressure and your Engineer of Record accepts that assumption. Doors left open by habit, or a door that fails, change the load on every frame, so the choice is written into the design criteria.
Who supplies wind-rated doors?
Doors, windows and roller shutters come through World Steel partners or your own suppliers, rated by their manufacturers. We design the framed openings and jambs for the reactions those doors deliver.
Code basis and sign-off 4 answers
Will my building need a tornado design?
Only if it is Risk Category III or IV and sits in a mapped tornado-prone area under ASCE 7-22. Typical warehouses and shops are Risk Category II and are unaffected. Storm shelters are a separate matter under ICC 500.
Can you tell me the wind speed for my county?
We print no regional values. Your Engineer of Record pulls the basic wind speed for the exact coordinates and risk category from the ASCE 7-22 hazard data, and that number goes on the first page of our calculations.
Who approves the wind criteria?
Your Engineer of Record approves them in writing before we size anything. World Steel designs and fabricates the steel; drawing approval, the PE seal and the permit sit with the US contractor, our customer.
Is wind design different for a large distribution center?
The method is the same, but long walls and wide roofs give bigger field zones and more repeated bays, so savings from zone-by-zone sizing add up across the job. Our plant fabricates 2,500 metric tons a month, so large footprints are routine.
Keep reading
Related engineering guides
Each one goes deeper on a part of the design this page touches.
- Hurricane coast buildings
- Energy code envelopes
- ASCE 7-22 design loads
- Cold-formed purlins (AISI S100)
- Connections & load path
- Roofing system
All eight US site-condition guides, the standards we design to and the IAS AC472 program are on the engineering & standards hub.
Proof at scale
Photo
Photo
Get an engineer’s eyes on your US building
Share drawings, a sketch or the footprint and site address. We agree the design criteria with your Engineer of Record, then send a written scope and the list of submittals, from a plant that fabricates 2,500 metric tons of structural steel a month.