Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Building package · Agricultural

From machine shed to feed mill.

A machine shed, a livestock barn and a feed mill need different steel: different spans, different openings and very different air inside. World Steel, a structural steel fabricator producing 2,500 t (5.5 million lb) a month in our own plant in Vietnam, designs each one for what lives in it and ships it to your US contractor, from a single barn to a whole agribusiness site.

MACHINESCROPSLIVESTOCKFEED MILL CLEAR SPANVENTILATEDGALVANIZEDHEAVY TOWER

Diagram, not to scale. Each building is designed for its own loads and site.

Built for

Machines, crops, animals and feed

Coatings

Galvanized or duplex where animals live

Capacity

2,500 t (5.5 million lb) a month

Shop drawings

Included at no extra charge

Design for the inside

Tell us what lives inside. The steel follows.

A farm building is shaped by what it shelters. Choose one to see what changes in the frame, the openings and the coating.

What the building shelters

Machinery

Combines, planters, sprayers and trucks.

  • Clear spans so machines turn without hitting a post
  • Eave height and door openings set by the tallest machine
  • Open sides or an open endwall where you want them, with the frame designed for that wind
Rigid frames
NO POSTS: ROOM TO TURN

Hay and crops

Hay, grain in bags, seed and produce.

  • Wide, simple bays for loaders and stacking
  • Ventilation openings so stored crops can breathe
  • Wall framing checked for crops stacked against it, when you tell us the load
Louvers
AIR

Livestock

Cattle, dairy, poultry, pigs and horses.

  • Hot-dip galvanized framing, or duplex, for ammonia and humidity
  • Sealed, corrosion-resistant fasteners
  • Ridge and wall openings framed for the fans and curtains you choose
Hot-dip galvanizing
AMMONIA + HUMIDITY GALVANIZED FRAME

Feed and processing

Feed mills, packing halls and processing plants.

  • Multi-story process towers carrying heavy equipment
  • Long production and warehouse halls beside them
  • Support steel for conveyors, bins and platforms, from the equipment maker’s loads
Long-span steel structures
MILL PRODUCTION HALL

Illustrations only. Your layout, loads and site decide the real frame. Fans, curtains, bins and livestock equipment come from their own makers; we frame for their openings and weights.

Air and coatings

The air inside decides the coating

Farm buildings range from dry sheds to some of the most corrosive buildings anywhere. We review the exposure of each building and propose the coating and fasteners for it, using ISO 12944 corrosivity categories as a shared vocabulary with your engineer.

Machine shed

Air inside

Dry, with dust and occasional washdown

Our answer

Shop primer and paint system chosen for the site

Hay and crop store

Air inside

Dust, humidity from the crop

Our answer

Paint system, ventilation openings framed in

Livestock barn

Air inside

Ammonia and constant humidity

Our answer

Hot-dip galvanized or duplex, sealed fasteners

Fertilizer or salt store

Air inside

Highly corrosive salts and dust

Our answer

Duplex system and fasteners reviewed for the products stored

Large projects in agribusiness

Feed mills that came back for more

Beyond the farm gate, agriculture runs on feed mills and processing plants: heavy multi-story towers beside long halls. These are ours, made in the same plant that frames our largest jobs, up to about 5,000 t for one steel mill.

Tongwei: about 1,500 t in phase 1

A feed factory in Vietnam, 2018. The same owner came back to World Steel for the expansion.

Aerial view of the Tongwei feed factory with its tall process tower and blue-roofed halls Photo Tongwei, phase 1
Feed factory process tower beside a long blue-roofed steel hall Photo Tower and halls
Steel process tower during erection with a crane beside it Photo The tower going up
Heavy steel frame of a multi-story feed mill tower Photo Heavy tower frame

Haid Group: two plants, one fabricator

Haid Vinh Long and the Thang Long aquatic feed factory, both 2024, in two provinces.

Aerial view of the Haid Vinh Long feed plant among rice fields Photo Haid Vinh Long
Red-primed steel frame of a feed mill tower Photo Tower frame, primed
Aerial view of the Thang Long aquatic feed factory with blue roofs and steel silos Photo Thang Long, Hai Duong
Crane lifting members onto a red steel feed mill tower Photo Tower under the crane

Projects outside the US, shown for the structure type; they are not US farms or sites.

Fabrication capacity

From one barn to a whole agribusiness site

2,500 metric tons a month

About 2,750 short tons of structural steel fabricated every month in World Steel’s own plant in Vietnam.

Big tonnage does not have to queue behind other work. The plant is sized to take the steel package of a large US job, from heavy frames and built-up girders to multi-story framing, and to ship it to your US port in the order your erector needs it.

Largest jobs delivered: Sunpro Steel 5,000 t · CPV Food 2,500 t · Long Son petrochemical 2,000 t · M&D Thailand 2,000 t →

Real World Steel frames

Towers and halls, built while the plant runs

Braced tower frames, cladding and whole sites going up at once. Tap a photo to open it full size.

Red steel tower frame rising beside a finished feed plant Photo Beside the running plant
Close view of a braced red steel tower frame Photo Bracing up close
Feed mill tower being clad in white and blue panels Photo Cladding the tower
Aerial view of a feed factory site with the tower frame and long hall under construction Photo A whole site at once
Aerial view of a feed mill with a tall process tower and long blue-roofed steel halls among fields Photo Tower and halls from the air
Steel tower frame at sunset on a feed factory site Photo Frame at dusk

Projects outside the US, shown for the structure type; they are not US sites.

Buying steel from outside the US

Every worry about an overseas fabricator, answered in writing

US buyers ask us the same ten questions before they order steel made in Vietnam. Here is what we do about each one, and where you can check it for yourself.

The worry: “Will steel designed overseas pass US plan check?”

Designed to US codes, ready for your engineer’s review

We design to the code your jurisdiction enforces: IBC 2024 and ASCE 7-22 by default, AISC 360 and AISC 341 for steel, plus state codes such as the California Building Code. Our calculations and drawings go to your Engineer of Record for review and approval, and the PE seal and permit stay with the US contractor, our customer.

The worry: “I can’t see the quality from across the Pacific.”

An accredited plant you can inspect, live

Our plant is the first and only fabricator in Vietnam accredited under IAS AC472, with written inspection procedures audited by IAS. Your special inspector or owner’s representative can visit, or inspect remotely over live video, and every QC release is logged with photos.

The worry: “Will the materials be traceable to the grade on the drawings?”

Mill certificates by heat number

Steel is ordered to the ASTM grades you specify, mainly from mills in Vietnam. Plate and sections are stored by grade and heat number, and you receive EN 10204 type 3.1 mill certificates traced to the members they went into, with Charpy V-notch results when your project asks for them.

The worry: “What if pieces don’t fit when they reach the site?”

Modeled, approved, then measured

Every member is modeled in Tekla Structures and cut only after you approve the shop drawings, which are included at no extra charge. QC checks dimensions, holes and end plates against the drawing before a piece is released.

The worry: “How will I know where my order really is?”

Real-time tracking in PEB Studio

You follow your own members through cutting, welding, coating, QC release, packing and loading in PEB Studio, online, at any hour. No waiting for a weekly email to find out what happened.

The worry: “Ocean freight scares me: damage, missing pieces, a port I don’t know.”

Packed in erection order, listed per container

Steel is bundled and tagged in your erection sequence, with a packing list and photos for every container or breakbulk load. The quote names the US port of discharge, and the shipment is planned backward from your site date.

The worry: “Who handles customs and duties?”

Incoterm and importer of record in writing

Every quote states the Incoterm and who acts as importer of record, so nobody is surprised at the port. Our Section 232 page explains how US import rules apply to fabricated steel, from official sources only.

The worry: “Time zones and language will slow everything down.”

One English-speaking project manager

Our engineers and project managers work in English and in US units on request. One project manager owns your job from approval drawings to the last container, and our US office is in Westminster, California.

The worry: “Who erects it, and who stands behind the field work?”

Your US contractor erects, with our drawings

World Steel supplies the steel structure only; we never erect. Our customers are US contractors: erection and field work are their scope, done from our erection drawings and piece marks, with our engineers on call for questions from the field.

The worry: “Who is responsible for the design?”

Scope split agreed before you sign

We put the split in writing: full design by World Steel, or a delegated design such as connections under your Engineer of Record, who keeps overall responsibility. You see exactly what we design and what stays with your team.

  • First and only IAS AC472 plant in Vietnam
  • Designed to US codes
  • Shop drawings at no extra charge
  • Live production in PEB Studio
  • Supplied to US contractors

What the package contains

Components in this package

Farm buildings work in dust, ammonia, fertilizer and big machinery, often with wide doors left open all season. We size clear spans for equipment turning room, design open-sided bays for wind and snow drift, and specify galvanized framing and sealed fasteners where animals or stored chemicals make the air aggressive.

standard = in the base scope · optional = add if you want it · confirm = depends on your design

Primary Structural System

Secondary Framing

Roofing System

Wall & Cladding System

Connections & Anchorage

Corrosion Protection

Drainage & Weather Protection

Not included

  • Foundations, slabs-on-grade, anchor rod setting and other sitework.
  • Steel erection and field labor, provided by your erector or general contractor.
  • Permit applications and plan review fees, unless agreed in writing.
  • Mechanical, electrical and plumbing design and installation.
  • US customs duties, tariffs, port charges and inland trucking, unless the stated Incoterm includes them.

Talk to an engineer

Send the use, the size and the openings.

Our engineers work in English. Tell us what the building shelters, the machines or animals inside and the site address, and we send a written scope for the steel and its coating.

Asked by farmers, ranchers and contractors

Agricultural building questions and answers

13 answers on farm buildings, corrosion, agribusiness and scope.

Farm buildings 4 answers

What agricultural buildings does World Steel supply?

The steel for machine and equipment sheds, hay and crop storage, livestock barns, riding arenas, farm shops and the larger agribusiness buildings around them: feed mills, packing halls and processing plants. Each is sized to your layout, loads and site.

How wide can a machine shed be without interior posts?

That depends on the loads and the roof shape. Clear spans let a combine or a planter turn inside without hitting a post; we compare frame options by steel weight in the proposal and send the one that suits your machines and site.

Can the sides stay open?

Yes. Open sides, a single open endwall or high eaves for large machines are common. An open building catches wind differently from a closed one, so we design the frame for the openings you actually have.

Can you add a lean-to or a shop bay?

Yes. Lean-tos, an insulated shop bay or a produce room are framed with the main building. Where a lower roof meets a higher one we design for the snow that drifts against it.

Livestock, fertilizer and corrosion 3 answers

Will steel last in a livestock barn?

Yes, when the coating suits the air inside. Ammonia from manure and constant humidity are hard on bare and painted steel, so animal housing is usually framed in hot-dip galvanized steel, or galvanized and painted (a duplex system), with sealed fasteners. We review the exposure for each building and propose the system.

What about fertilizer and salt storage?

Fertilizer and salt stores are among the most corrosive farm buildings. We review the products stored and propose a coating and fastener system for that exposure, using ISO 12944 corrosivity categories as a shared vocabulary with your engineer.

Do you supply ventilation?

We supply the louvers, ridge openings and the framing around fan openings. The fans, controls and livestock equipment come from their own makers, and we frame for their openings and weights once you send them.

Agribusiness and large projects 2 answers

Can you supply a feed mill or a whole agribusiness site?

Yes. Our plant in Vietnam fabricates 2,500 t (5.5 million lb) of structural steel a month. We supplied about 1,500 t for phase 1 of the Tongwei feed factory, and the same owner came back for an expansion. Haid Group ordered the steel for two feed plants from us. Production slots are confirmed in the quote.

Can several farm buildings ship together?

Yes. Buildings are packed and labeled one by one, so a shed, a barn and a shop can share a shipment and be unloaded in the order your US contractor erects them.

Codes, permits and erection 4 answers

Which codes do you design to?

IBC 2024, ASCE 7-22 and AISC 360 by default, or your jurisdiction’s edition. ASCE 7 places many agricultural buildings in Risk Category I; your Engineer of Record confirms the category for each building and its use.

Does a farm building need a permit?

Permit rules for farm buildings vary by state and county. The PE seal and the permit belong to the US contractor, our customer, and their engineer. World Steel designs and fabricates; it does not seal drawings.

Do you erect the building?

No. World Steel designs, fabricates and supplies the steel. Foundations, erection and site work are the scope of the US contractor, our customer, and the trades they hire.

Do you publish prices?

No. Send the use, the size, the openings and the site address and we return a written scope and quotation.

Keep reading

Related pages

Planning a farm building or a feed mill?

Send what the building shelters, the size, the openings and the site address. We design the frame and its coating for the air inside and send a written scope for the steel, made in our plant in Vietnam.