Utah · Wasatch Fault
Structural steel for Utah’s Wasatch Fault
The Wasatch Fault runs along the foot of the mountains past Ogden, Salt Lake City and Provo, where most Utahns live and most large projects are built. Soft sediments left by ancient Lake Bonneville amplify the shaking and can liquefy, so many Wasatch Front sites fall in Seismic Design Category D or higher.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and landed at Los Angeles–Long Beach or Oakland for your Utah site.
- Source
- The Wasatch Fault
- Categories
- Often D and above
- Soils
- Old lake sediments
- Design basis
- ASCE 7 and AISC 341
Why it matters
Ductile frames and tough welds
Once a building lands in a high Seismic Design Category, AISC 341 governs the lateral system: braced or moment frames with ductile details, protected zones, demand-critical welds and capacity-designed connections. Your Engineer of Record sets the category and the system; we design and detail the steel to it.
Our shop has AWS D1.8-qualified welding procedures and welders. Plate mills can supply EN 10204 3.1 certificates with Charpy results on request, we mark protected zones on the members, and remote inspector access is available on request.
What we design and fabricate
Steel for high seismic categories
Braced frames
Special concentric and buckling-restrained frame steel.
Moment frames
Prequalified connections under AISC 358 where specified.
Demand-critical welds
Welds made by AWS D1.8-qualified welders with procedures on file.
Anchorage
Base plates and anchor rods for the seismic reactions.
Who does what
Seismic steel, split clearly
World Steel supplies
- Lateral system steel designed or detailed to AISC 341 where it applies
- AWS D1.8-qualified procedures and welders for demand-critical welds
- Protected zones marked on the members on request
- Mill certificates traced by heat, with Charpy results on request
- Tekla shop and erection drawings, included
The US contractor arranges
- Site class and Seismic Design Category by the Engineer of Record
- Engineer of Record approval and PE seal
- Special inspections and the quality assurance plan
- Foundations and anchorage installation
- Erection and site work
Utah
What we do not claim
AISC 341 is a design standard, not a fabricator certificate, and World Steel holds no Utah engineering license. We design and fabricate to AISC 341 where it applies, and your Engineer of Record approves and seals the design.
Utah ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Utah contractors
Utah contractors: let’s win the next project together
If your next bid involves Wasatch Fault seismic, World Steel wants to be your long-term, win-win steel partner in Utah. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Utah project is cut, welded, inspected and packed.
Q&A
What Utah buyers ask
Is every Utah site highly seismic?
No. The Wasatch Front is, while parts of southern and eastern Utah carry lower loads. The site class and the address decide the category.
Do you have AWS D1.8 welders?
Yes. Our shop has AWS D1.8-qualified welding procedures and welders for demand-critical welds.
Can inspectors follow the fabrication?
Yes. Remote inspector access is available on request, and every member’s status shows in PEB Studio.
Official sources: Utah Geological Survey: earthquakes
Utah solutions
Every Utah guide
Related pages
Code facts on this page summarize Utah practice, the Utah State Construction Code, the IBC with Utah amendments, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in Utah?
Send the drawings or the site address, size and use. We set the Utah design basis with your Engineer of Record, design or detail the steel to the Utah State Construction Code and for seismic and snow loads, and quote it made in our plant in Vietnam, packed in erection order and landed at Los Angeles–Long Beach or Oakland for the rail or truck run to your site.