Columns and floor beams of a multi-story steel frame partway through erection

Engineering & standards · AISC 341-22 seismic provisions

AISC 341: steel that bends in an earthquake, and the proof it was built to

AISC 341 decides where a steel frame is allowed to yield in a major earthquake and makes everything around that point stronger. It reaches design, materials, welding, bolting and inspection. When your project triggers it, World Steel designs and fabricates the seismic system to it in our own IAS AC472-accredited plant in Vietnam, with every record your reviewer and inspector will ask for.

Capacity design in a steel moment frame The beam yields in a protected zone near each column; the connections, column and base are designed stronger than the force that yielding can deliver. SEISMIC FORCE Beam yields here first protected zone: no welds, holes or pins Connection stronger than the beam (Ry·Mp) Column strong column, weak beam Base and anchorage designed for what the system delivers
Standard
ANSI/AISC 341-22, used with AISC 360-22
Triggered by
ASCE 7-22: SDC D to F, or R above 3 in B and C
Seismic welds
AWS D1.1 plus D1.8; D1.8-qualified welders
Approved by
Your Engineer of Record

Start here

Does AISC 341 apply to your building?

Three questions from ASCE 7-22 decide it. The trigger is the category and the system, never the state on its own.

  1. What is the Seismic Design Category?

    Set by the site’s ground motion, its soil class and the building’s risk category under ASCE 7-22.

  2. Which seismic system is chosen?

    Moment frame, braced frame or a mix, each with its own R value, height limit and detailing level.

  3. Is the member part of that system?

    Only the frames, braces, connections and bases that resist the earthquake fall under AISC 341.

Three possible answers

AISC 360 only

Category A, or B and C with a steel system not specifically detailed for seismic resistance (R = 3).

Simple detailing, higher design force. Common on light metal buildings in low categories.

AISC 341, ordinary systems

Ordinary moment frames and ordinary concentrically braced frames, often the right fit for one-story metal buildings.

A limited set of AISC 341 rules: materials, connections, protected zones where applicable and Chapter J QA.

AISC 341, special systems

Special and intermediate moment frames, special braced frames, eccentrically braced and buckling-restrained frames.

Full capacity design, AISC 358 connections, demand-critical welds and the widest QA program.

ANSI/AISC 341-22 chapter by chapter

Inside the standard, and where each chapter meets our work

AISC 341 is organized in chapters A to K. Here is what each one covers and how it shows up in a World Steel project.

Chapter A: General requirements

Scope, referenced codes, materials (including Ry and Rt and toughness of heavy sections) and the structural design drawings.

Steel bought to the ASTM grade and toughness the drawings call for

Chapter B: General design requirements

How the seismic load combinations and the seismic force-resisting system are set up.

Load cases and system set in the SAP2000 model

Chapter C: Analysis

What the analysis must capture, including the required strength from the system’s capacity.

Capacity-based forces carried into connection design

Chapter D: Members and connections

Ductility classes, width-to-thickness limits, stability bracing, protected zones, demand-critical welds, column splices and bases.

Member proportions, bolted joints, splices and base plates

Chapter E: Moment-frame systems

Ordinary, intermediate and special moment frames, special truss moment frames and cantilever column systems.

Tapered built-up frames and multi-story moment frames

Chapter F: Braced-frame and shear-wall systems

Ordinary and special concentrically braced frames, eccentrically braced frames, buckling-restrained braced frames and steel plate shear walls.

Braced bays, gusset plates and brace connections

Chapter G: Composite moment-frame systems

Steel and concrete moment frames working together.

Steel parts supplied to your engineer’s composite design

Chapter H: Composite braced-frame and shear-wall systems

Composite braced frames and composite shear walls.

Steel parts supplied to your engineer’s composite design

Chapter I: Fabrication and erection

Shop and erection drawings, protected zones, bolted joints and welded joints in the shop and in the field.

Tekla shop drawings, included; field work by the US contractor

Chapter J: Quality control and quality assurance

QC by the fabricator and erector, QA for the owner, inspection tasks, nondestructive testing and documents.

QC records in PEB Studio and the Manufacturing Data Record

Chapter K: Prequalification and cyclic qualification testing

How a connection is prequalified or proven by cyclic testing.

AISC 358 or test-qualified connections, as your engineer selects

Red letters mark the chapters that do the most work on a typical World Steel seismic project.

Steel seismic force-resisting systems

Seven steel systems, three levels of ductility

The more a system is allowed to yield, the lower its design force and the more detailing AISC 341 asks for. Metal buildings most often use the ordinary systems.

  • Ordinary moment frame (OMF)

    Ordinary ductility Common on metal buildings

    Frames meant to yield only a little; simple connections designed for the beam’s capacity or the amplified seismic force.

    Where you see it: Tapered built-up portal frames of one-story metal buildings within the ASCE 7 limits

  • Intermediate moment frame (IMF)

    Intermediate ductility

    Frames detailed for moderate rotation, with prequalified or tested connections.

    Where you see it: Heavier frames where an OMF is not allowed

  • Special moment frame (SMF)

    Special ductility

    Frames that form plastic hinges in the beams, away from the columns, with AISC 358 connections.

    Where you see it: Multi-story frames and open fronts in high categories

  • Ordinary concentrically braced frame (OCBF)

    Ordinary ductility Common on metal buildings

    Braces with limited ductility; connections designed for the brace’s expected strength or the amplified force.

    Where you see it: Wall and roof bracing on many metal buildings

  • Special concentrically braced frame (SCBF)

    Special ductility

    Braces designed to buckle and yield in a planned order; gussets detailed to let them do so.

    Where you see it: Braced bays in high categories and multi-story frames

  • Eccentrically braced frame (EBF)

    Special ductility

    A short beam segment, the link, yields in shear or bending while the braces stay elastic.

    Where you see it: Frames that need both stiffness and openings

  • Buckling-restrained braced frame (BRBF)

    Special ductility

    Braces with a steel core sleeved so it yields in tension and compression without buckling.

    Where you see it: Frames that need high, even energy absorption

SystemDuctilityHow it handles shakingWhere you see it
Ordinary moment frame (OMF)Common on metal buildings Ordinary Frames meant to yield only a little; simple connections designed for the beam’s capacity or the amplified seismic force. Tapered built-up portal frames of one-story metal buildings within the ASCE 7 limits
Intermediate moment frame (IMF) Intermediate Frames detailed for moderate rotation, with prequalified or tested connections. Heavier frames where an OMF is not allowed
Special moment frame (SMF) Special Frames that form plastic hinges in the beams, away from the columns, with AISC 358 connections. Multi-story frames and open fronts in high categories
Ordinary concentrically braced frame (OCBF)Common on metal buildings Ordinary Braces with limited ductility; connections designed for the brace’s expected strength or the amplified force. Wall and roof bracing on many metal buildings
Special concentrically braced frame (SCBF) Special Braces designed to buckle and yield in a planned order; gussets detailed to let them do so. Braced bays in high categories and multi-story frames
Eccentrically braced frame (EBF) Special A short beam segment, the link, yields in shear or bending while the braces stay elastic. Frames that need both stiffness and openings
Buckling-restrained braced frame (BRBF) Special Braces with a steel core sleeved so it yields in tension and compression without buckling. Frames that need high, even energy absorption

Read with ASCE 7-22 Table 12.2-1, which sets each system’s R, Ω₀, Cd and height limits. We fabricate every system on this list to your Engineer of Record’s design.

What AISC 341 adds to ordinary steel design

Eight ideas that make a steel frame tough, not only strong

Capacity design

Pick the part that yields first, then make the connections, columns and anchorage strong enough for the force that part can really deliver.

Expected strength

Ry and Rt raise the yield and tensile strength used in that check, because real steel is stronger than its minimum grade.

Ductile proportions

Width-to-thickness limits keep flanges and webs from buckling locally before the member has done its job.

Stability bracing

Beams and columns in the seismic system get lateral bracing close enough that they can yield without twisting.

Protected zones

The stretch of steel expected to yield is kept free of welds, holes, shot pins and attachments that could start a crack.

Demand-critical welds

Welds whose failure would endanger the system use notch-tough filler and get the testing AWS D1.8 adds.

Splices and bases

Column splices and column bases are designed for the forces the system can develop, not only for the analysis results.

A seismic quality program

Chapter J lists who inspects what, which welds are tested and which documents must exist before the steel is accepted.

Responsibilities under AISC 341

Who does what on a seismic steel project

AISC 341 splits the work between design, fabrication, erection and inspection. This is how it divides when World Steel supplies your steel.

Your Engineer of Record

Sets the seismic criteria with the building official, approves the system and the drawings, coordinates foundations.

Leaves shop methods, procedures and QC to the fabricator.

World Steel

Designs the steel building for your engineer’s approval, prepares shop drawings, buys the steel, fabricates, welds, tests and documents it in our plant in Vietnam.

Does not erect. Field work is the US contractor’s scope.

QA agency / special inspector

Performs the quality assurance tasks for the owner, in person or online for the shop, on site for erection.

Does not direct the work; reports to the owner and the building official.

US contractor

Erects the frame, installs and pretensions the bolts, keeps protected zones clear on site and runs erection QC.

Does not change seismic details without the engineer.

Building official

Issues the permit, accepts the special inspection program and decides on any fabricator approval under IBC 1704.2.5.

Does not design or inspect for the contractor.

US contractors
Become a World Steel contractor partner Partner program

World Steel · made in our own plant in Vietnam

How we carry AISC 341 from the calculation to the shipped member

One team owns the seismic requirements from the SAP2000 model to the last weld record, and you can follow every step in PEB Studio.

  1. Multi-story steel frame rising next to a fabrication hall Photo

    Design for your approval

    Earthquake, wind and snow in one SAP2000 model, the seismic system checked to AISC 341 and capacity forces carried into every connection. The package goes to your Engineer of Record to review and approve.

  2. Fitter comparing a built-up beam with its shop drawing Photo

    Shop drawings, included

    Tekla shop drawings mark ductility class, protected zones, demand-critical welds, access holes, backing and tabs, so the shop floor sees them before cutting.

  3. Plate and coil strip racked by grade and heat number in the store Photo

    Steel with its paperwork

    Plate and sections to the specified ASTM grade, with EN 10204 3.1 certificates from Vietnamese mills, Charpy results on request and heat numbers kept to the piece mark.

  4. Two welders operating a submerged-arc welding station on a member Photo

    Welded to D1.1 and D1.8

    Welding procedures and welders qualified to AWS D1.8 for seismic joints, notch-tough filler where required, backing and tabs removed or reinforced as the drawings show.

  5. Quality inspector taking dimensions on a finished steel member Photo

    Chapter J quality control

    Visual inspection of every weld, ultrasonic and magnetic particle testing as Chapter J and the specification require, hold points your inspector can witness live.

  6. Rows of labeled steel bundles ready to leave the plant Photo

    Records, then shipment

    Every report filed under its piece mark in PEB Studio, closed into the Manufacturing Data Record, then packed in erection order and shipped from Vietnam to your US port.

AISC 341 Chapter J · IBC Chapter 17

Quality control in our plant, quality assurance for you

Chapter J gives the fabricator the quality control and the owner’s agency the quality assurance. Your inspector can do the shop part in person or live online.

  • Documents

    QC, World Steel: Shop drawings, welding procedures, welder qualifications, filler and steel certificates kept and available

    QA, your agency: Reviews the documents before and during fabrication

  • Before welding

    QC, World Steel: Fit-up, joint preparation, access holes and backing checked against the shop drawing

    QA, your agency: Observes on a sampling basis or at agreed hold points

  • During welding

    QC, World Steel: Procedure, filler, preheat and heat input followed and recorded

    QA, your agency: Observes welding of seismic and demand-critical joints

  • After welding

    QC, World Steel: Visual inspection of every weld; backing and tab removal checked

    QA, your agency: Performs or observes visual inspection of seismic welds

  • Nondestructive testing

    QC, World Steel: UT and MT carried out and reported where specified

    QA, your agency: Performs or verifies the UT and MT that Chapter J assigns

  • Protected zones and bolted joints

    QC, World Steel: No attachments in protected zones; faying surfaces prepared and checked

    QA, your agency: Confirms protected zones and faying surfaces before release

StageQuality control: World Steel, in the plantQuality assurance: your agency
DocumentsShop drawings, welding procedures, welder qualifications, filler and steel certificates kept and availableReviews the documents before and during fabrication
Before weldingFit-up, joint preparation, access holes and backing checked against the shop drawingObserves on a sampling basis or at agreed hold points
During weldingProcedure, filler, preheat and heat input followed and recordedObserves welding of seismic and demand-critical joints
After weldingVisual inspection of every weld; backing and tab removal checkedPerforms or observes visual inspection of seismic welds
Nondestructive testingUT and MT carried out and reported where specifiedPerforms or verifies the UT and MT that Chapter J assigns
Protected zones and bolted jointsNo attachments in protected zones; faying surfaces prepared and checkedConfirms protected zones and faying surfaces before release

Inspection tasks and test extents follow AISC 341 Chapter J and your project specification. Field QC is the US contractor’s, and field QA is arranged by the owner.

Records you receive for the seismic system

  • Seismic design criteria, system, R, Ω₀ and Cd, printed at the front of the calculations
  • Calculations and drawings for the steel building we design, for your engineer’s approval
  • Shop drawings marking ductility class, protected zones and demand-critical welds
  • Welding procedures for seismic joints, with their AWS D1.1 and D1.8 basis
  • Welder qualification records, including the D1.8 supplemental test where required
  • EN 10204 3.1 mill certificates by heat number, with Charpy results on request
  • Filler metal certificates showing the required notch toughness
  • Visual, UT and MT inspection reports by piece mark
  • Faying-surface preparation records for pretensioned bolted joints
  • The Manufacturing Data Record, closed in PEB Studio before shipment

Accredited plant

The first and only IAS AC472 fabricator in Vietnam

Written procedures for design and fabrication inspection, audited by IAS. Your building official may accept it under IBC 1704.2.5 for shop special inspection; only they can decide.

IAS AC472 accreditation

In-depth articles

AISC 341-22, chapter by chapter

Twenty in-depth articles on the 2022 Seismic Provisions for Structural Steel Buildings: what each chapter asks of the design, the drawings, the shop and the inspector, and how World Steel engineers and fabricates seismic steel to it for US projects.

Chapter D
Members and connections

Ductile sections, bracing, protected zones, joints, splices and bases.

Chapter E
Moment frames

OMF, IMF, STMF, SMF and the cantilever column systems.

Chapter F
Braced frames and walls

Concentric and eccentric bracing, buckling-restrained braces, plate walls.

Chapters G–H
Composite systems

Steel and concrete working together, including the new CC-PSW/CF.

Chapters I–K
Fabrication, QA and testing

Shop and site rules, quality control and assurance, cyclic tests.

Real World Steel projects

Steel from our plant, standing on real jobs

Site photos from World Steel projects: a job on Guam built to US codes, multi-story frames and heavy industry in Vietnam, and buildings in Japan, the Philippines, Australia and Singapore, where earthquakes and strict codes are part of the brief.

Featured project · Guam · 2023

Cost U Less Supermarket

Type
Commercial & retail building
Made in
Our plant, Vietnam
Photos
4 real site photos

A supermarket on Guam, a US territory that builds to US codes on an island exposed to typhoons and earthquakes. World Steel did the structural design, fabricated the steel structure in our plant in Vietnam and shipped it to the island.

See the project and all photos
Portal frames standing during erection on a cold site Photo
Exported steel in place in Japan: a World Steel job abroad, shown for the building type rather than a US site.
Crane setting a rafter on a warehouse frame Photo
Exported steel in place in Philippines: a World Steel job abroad, shown for the building type rather than a US site.
Port structures several stories high under construction, drone view Photo
Exported steel in place in Singapore: a World Steel job abroad, shown for the building type rather than a US site.
Curved long-span trusses being set during erection Photo
Exported steel in place in Western Australia: a World Steel job abroad, shown for the building type rather than a US site.
All World Steel projects

Past World Steel work, shown for the structure type. It does not state the seismic criteria of any one project.

Real photos from World Steel

Where seismic steel for US projects is made and checked

Built-up members, stiffened columns and the inspection behind them, photographed in our own plant in Tay Ninh Province, Vietnam, and on World Steel jobs. Not stock images.

Welder beside a deep built-up girder running through the automatic line Photo
A deep plate girder going through automatic welding at World Steel, Vietnam.
Welder looking over the stiffeners and end plate of a heavy column Photo
Column stiffeners and end plate under inspection at World Steel, Vietnam.
Stiffened heavy plate girders resting on shop supports Photo
Heavy plate girders with stiffeners, fabricated by World Steel in Vietnam.
Shop worker taking a measurement on a steel plate in the yard Photo
Incoming plate is measured at intake, before any cutting, in the Vietnam plant.
Inspector walking a line of painted built-up members on the shop floor Photo
Final look at coated members before they are released to packing, World Steel plant in Vietnam.
Primed column with its bolted end plate set on painting stands Photo
Primer on a column and its end plate at the Vietnam plant, ready for the next coat.
Mobile crane lifting a member into a multi-story steel frame Photo
Going up beside the plant in Vietnam: World Steel framed its own office building.
Tall lattice columns of a crane-served industrial building during erection Photo
Lattice crane columns on a World Steel job in Can Tho City, Vietnam.

Asked by US owners, contractors and engineers

AISC 341 questions and answers

28 straight answers on the standard, how it ties to ASCE 7, AISC 360, AISC 358 and AWS D1.8, materials, inspection and what World Steel does and does not do.

Understanding AISC 341 6 answers

What is AISC 341, in one sentence?

ANSI/AISC 341, Seismic Provisions for Structural Steel Buildings, is the American Institute of Steel Construction standard that tells engineers, fabricators and inspectors how a steel seismic force-resisting system must be designed, detailed, made and checked so it can bend and stretch through a major earthquake without breaking.

How is AISC 341 different from AISC 360?

AISC 360 sizes every steel member and connection for strength and stability. AISC 341 is layered on top of it for the members and joints that resist earthquakes: it adds expected material strength, capacity design, ductility limits, protected zones, demand-critical welds and a seismic quality program. A frame designed to AISC 341 is always designed to AISC 360 as well.

Which edition do you work to?

AISC 341-22 with ASCE 7-22 and IBC 2024 by default. If your jurisdiction still enforces an earlier IBC or a state code built on one, such as an older California Building Code, we use the AISC 341 edition that code references, confirmed with your Engineer of Record before design starts.

Is AISC 341 required for every steel building in Seismic Design Category D?

In categories D, E and F the steel seismic force-resisting system must follow AISC 341. What changes from one building to the next is how much of it applies: an ordinary moment frame or ordinary braced frame needs far less detailing than a special one, and purlins, girts and other members outside the seismic system keep their normal design.

Can a building in Category B or C skip AISC 341?

Often, yes. ASCE 7 lets a steel building in Category B or C use a system “not specifically detailed for seismic resistance” with R = 3. It is then designed to AISC 360 alone, for a higher seismic force. On many light metal buildings that is the economical path; your Engineer of Record makes the call.

What does the response modification coefficient R have to do with it?

R is the factor ASCE 7 uses to reduce the elastic earthquake force for a system that can absorb energy by yielding. A higher R means a lower design force but demands the ductile detailing of AISC 341. Choosing the system, and therefore R, is the biggest seismic decision on a steel building.

How it fits with the other standards 6 answers

Who decides whether AISC 341 applies: ASCE 7 or AISC?

ASCE 7. Its Seismic Design Category and its table of seismic force-resisting systems decide which system is allowed and whether AISC 341 detailing is needed. AISC 341 then says how to design and build that system. The IBC ties both into law in your jurisdiction.

Where does AISC 358 come in?

AISC 358 lists moment connections that are prequalified for special and intermediate moment frames, such as the reduced beam section and bolted end-plate connections. AISC 341 requires one of those, or a connection qualified by cyclic testing, whenever such a frame is used.

How do AWS D1.1 and AWS D1.8 relate to AISC 341?

Every structural weld is made to AWS D1.1. For welds in a system designed to AISC 341, the standard calls up AWS D1.8, the seismic supplement, which adds notch-tough filler metal, special access-hole and backing details and extra welder testing. Our shop welding procedures and welders are qualified to AWS D1.8 for that work.

Do bolted joints in the seismic system need anything special?

Yes. AISC 341 requires bolts in the seismic system to be pretensioned high-strength bolts, with faying surfaces prepared as for slip-critical joints. We prepare the faying surfaces in the plant and mark them on the shop drawings; the US contractor installs and pretensions the bolts to the RCSC Specification.

Does the MBMA Manual replace AISC 341 for a metal building?

No. The MBMA Metal Building Systems Manual is a practice reference that helps apply the codes to metal buildings. The seismic requirements still come from ASCE 7 and AISC 341, including the special provisions for single-story metal building frames.

Where does IBC Chapter 17 fit?

IBC Chapter 17 sets the special inspections and tests for the structural steel, including the seismic quality assurance AISC 341 Chapter J describes. Your building official enforces it and decides who performs which inspections.

Materials and certificates 5 answers

Which steel grades can be used in an AISC 341 system?

Members expected to yield must use steels AISC 341 lists, and in most systems their specified minimum yield stress may not exceed 345 MPa (50 ksi). We buy plate and sections to the ASTM grade your drawings specify, such as ASTM A572 Grade 50 plate for built-up members, and check every certificate against that specification at intake.

What is expected yield strength, Ry, and why should I care?

Real steel is usually stronger than its minimum grade. AISC 341 multiplies the minimum by Ry (and Rt for tensile strength) to estimate what the yielding member will actually deliver, then designs the connections and columns around it for that higher force. It is why a seismic connection often looks heavier than the member it joins.

Do you supply mill certificates and Charpy V-notch results?

Yes. Our steel comes from mills in Vietnam that issue EN 10204 type 3.1 inspection certificates, and Charpy V-notch impact results are supplied on request. AISC 341 calls for them on thick material in the seismic system, for example rolled-shape flanges 38 mm (1-1/2 in.) and thicker and plates 50 mm (2 in.) and thicker in built-up members, where the requirement is 27 J at 21 °C (20 ft·lbf at 70 °F).

Can each seismic member be traced back to its steel?

Yes. Plate and sections are stored by grade and heat number, and every cut part keeps its heat number through to its piece mark. In PEB Studio you can open a member and see the certificate behind it.

Where do the materials come from?

Mainly from mills in Vietnam, with Japan, Korea, Indonesia or Thailand when AISC 341 toughness or size requirements call for it. The whole structure is fabricated in our own plant there before it is shipped to your US port.

Inspection, testing and QA 5 answers

Who is responsible for quality control and who for quality assurance?

Under AISC 341 Chapter J, quality control belongs to the fabricator and the erector: World Steel for the steel we make, and the US contractor for the work on site. Quality assurance is performed for the owner by an agency the owner or the building official appoints, which observes, checks and documents the work.

Can our QA agency or special inspector check the steel in Vietnam?

Yes. Your inspector can witness hold points in person at our plant or live over Zoom or Microsoft Teams, review the records online and request the video afterwards. Remote access is arranged for inspectors who ask for it.

Does IAS AC472 accreditation replace seismic QA?

Not by itself. IBC Section 1704.2.5 lets a building official waive special inspection of shop work done by an approved fabricator, and IAS AC472 is the evidence many officials accept. Only your building official can grant that, and field inspection on site always continues.

Which welds are tested, and how?

Every weld is visually inspected. Complete-joint-penetration welds in the seismic system receive the ultrasonic testing Chapter J assigns, and magnetic particle testing is applied where AISC 341 and AWS D1.8 call for it, for example at weld tabs and backing removal on demand-critical joints. The extent is set by your project specification.

How do you keep protected zones clear?

Protected zones are drawn on the Tekla shop drawings, so nothing is welded, drilled or shot there in the plant. On request we also mark them on the steel, so the erector and other trades on site can see them too.

World Steel’s role and documents 6 answers

Is World Steel AISC certified?

No, and we do not claim it. Our plant is accredited under IAS AC472, the first and only fabricator in Vietnam with that accreditation. We design and fabricate to AISC 341, AISC 358 and AISC 360 as your project requires, and prove it with project records.

Who is the Engineer of Record, and who seals the design?

Your project Engineer of Record, engaged by the US contractor or owner, reviews, approves and seals the design, coordinates the building as a whole, including foundations, and confirms the seismic criteria with us. World Steel designs and fabricates the steel structure.

Can you fabricate to our own engineer’s seismic design?

Yes. Send the sealed design and we prepare shop drawings to it, raise questions on any connection that falls outside AISC 358 limits, and fabricate to the drawings once your engineer approves them.

Are shop drawings included for seismic projects?

Yes, shop drawings come with every project at no extra charge. On seismic work they show the ductility class of each member, the protected zones, the demand-critical welds and the backing and weld tab treatment.

Does World Steel erect the steel?

No. World Steel supplies the steel structure only. Erection is the scope of the US contractor, World Steel’s customer and partner, who is responsible for field bolting, any field work and their own quality control under Chapter J.

Can I follow the fabrication of my seismic members?

Yes. PEB Studio shows each member moving through cutting, fit-up, welding, testing, coating and release in real time, with inspection reports and photos attached to its piece mark.

More on the codes we design and fabricate to: US standards questions and answers.

Details confirmed in quote Edition: As referenced

Source record: https://worldsteelstructure.com/

Last checked: November 8, 2026. Editions are revised on a cycle, so your Engineer of Record confirms which one your jurisdiction enforces.