Fellowship hall
Often first: worship, meals and events under one clear span.
Clear-span frame with one end wall planned to open later.
Build in stages
Most congregations build a campus over years. We plan the grid, the end wall that will open and the connection details from the first building, so each later phase bolts on instead of starting over.
Often first: worship, meals and events under one clear span.
Clear-span frame with one end wall planned to open later.
When the congregation outgrows the hall.
Column-free room, exposed trusses or a vaulted ceiling, balcony framing.
Classrooms, nursery and offices.
Two-story framing on composite floors, stairs and corridors.
A gym and youth space for the whole week.
Long-span roof carrying goals, curtains and lights.
The shape of the room
The ceiling sets the character of a sanctuary, and the steel follows it. Pick one to see what changes in the frame.
Illustrations only. Your architect sets the room; we design and fabricate the steel to it.
What the room needs
Three things make a worship room work. Each one starts in the structure.
No columns between the seats and the platform; balconies framed to keep the view.
Acoustic liners in the package where it calls for them; framing for the acoustician’s panels.
Clerestories, gable windows and skylights framed in; lighting rigs designed into the roof.
Assembly buildings by World Steel
A two-floor mosque in Georgetown, an arts centre with about 400 t of steel in a curved roof over its main hall, and a golf clubhouse built around one gathering room. All framed in the plant that also takes our largest industrial jobs, up to about 5,000 t.
3D model
The mosque as designed
Photo
Girders up to 1.5 m deep
Photo
Painted and checked
Photo
Packed for Georgetown
Photo
Trusses over the hall
Photo
A landmark roof
Photo
Column and rafter
Photo
Clean edge to the room
3D model
Clubhouse entrance
3D model
A gathering room
3D model
Roof over the terrace Projects outside the US. The mosque is a place of worship; Goldfields and Whaleback are shown as assembly buildings. Concept renderings and 3D models are marked as such.
Fabrication capacity
2,500 metric tons a month
About 2,750 short tons of structural steel fabricated every month in World Steel’s own plant in Vietnam.
Big tonnage does not have to queue behind other work. The plant is sized to take the steel package of a large US job, from heavy frames and built-up girders to multi-story framing, and to ship it to your US port in the order your erector needs it.
Largest jobs delivered: Sunpro Steel 5,000 t · CPV Food 2,500 t · Long Son petrochemical 2,000 t · M&D Thailand 2,000 t →Real World Steel frames
Steel that will be seen is made with care: built-up rafters from plate, every member checked and every weld finished before paint. Tap a photo to open it full size.
Photo
Rafters with end plates
Photo
Checked before paint
Photo
Welds finished by hand
Photo
A row of members
Photo
A curved rafter
Photo
Girders from plate Projects by World Steel
Photo
Mosque, two floors, girders up to 1.5 m deep. Guyana · 2026.
Photo
Arts centre, curved long-span roof, about 400 t. Australia.
3D model
Golf clubhouse, about 50 t. Australia.
Buying steel from outside the US
US buyers ask us the same ten questions before they order steel made in Vietnam. Here is what we do about each one, and where you can check it for yourself.
The worry: “Will steel designed overseas pass US plan check?”
We design to the code your jurisdiction enforces: IBC 2024 and ASCE 7-22 by default, AISC 360 and AISC 341 for steel, plus state codes such as the California Building Code. Our calculations and drawings go to your Engineer of Record for review and approval, and the PE seal and permit stay with the US contractor, our customer.
The worry: “I can’t see the quality from across the Pacific.”
Our plant is the first and only fabricator in Vietnam accredited under IAS AC472, with written inspection procedures audited by IAS. Your special inspector or owner’s representative can visit, or inspect remotely over live video, and every QC release is logged with photos.
The worry: “Will the materials be traceable to the grade on the drawings?”
Steel is ordered to the ASTM grades you specify, mainly from mills in Vietnam. Plate and sections are stored by grade and heat number, and you receive EN 10204 type 3.1 mill certificates traced to the members they went into, with Charpy V-notch results when your project asks for them.
The worry: “What if pieces don’t fit when they reach the site?”
Every member is modeled in Tekla Structures and cut only after you approve the shop drawings, which are included at no extra charge. QC checks dimensions, holes and end plates against the drawing before a piece is released.
The worry: “How will I know where my order really is?”
You follow your own members through cutting, welding, coating, QC release, packing and loading in PEB Studio, online, at any hour. No waiting for a weekly email to find out what happened.
The worry: “Ocean freight scares me: damage, missing pieces, a port I don’t know.”
Steel is bundled and tagged in your erection sequence, with a packing list and photos for every container or breakbulk load. The quote names the US port of discharge, and the shipment is planned backward from your site date.
The worry: “Who handles customs and duties?”
Every quote states the Incoterm and who acts as importer of record, so nobody is surprised at the port. Our Section 232 page explains how US import rules apply to fabricated steel, from official sources only.
The worry: “Time zones and language will slow everything down.”
Our engineers and project managers work in English and in US units on request. One project manager owns your job from approval drawings to the last container, and our US office is in Westminster, California.
The worry: “Who erects it, and who stands behind the field work?”
World Steel supplies the steel structure only; we never erect. Our customers are US contractors: erection and field work are their scope, done from our erection drawings and piece marks, with our engineers on call for questions from the field.
The worry: “Who is responsible for the design?”
We put the split in writing: full design by World Steel, or a delegated design such as connections under your Engineer of Record, who keeps overall responsibility. You see exactly what we design and what stays with your team.
What the package contains
Congregations want a sanctuary that feels open and a building that grows with them. A clear-span frame or exposed truss roof gives the main room its height, with two-story framing for classrooms and offices along one side. We provide the calculations and drawings your architect and building department will ask for, and finishes that look like a place of worship, not a warehouse.
standard = in the base scope · optional = add if you want it · confirm = depends on your design
Talk to an engineer
Our engineers work in English. Tell us how many people the sanctuary seats, which building comes first and the site address, and we send a written scope for the steel of each phase.
Covered in our state guides
Asked by churches, building committees and contractors
11 answers on the sanctuary, phases, large campuses and scope.
Yes. A clear-span rigid frame or exposed trusses carry the roof from wall to wall, so every seat sees the platform. We compare the options by steel weight in the proposal.
Yes. Exposed trusses are designed and detailed to be seen: member sizes, connection layout and the paint finish are agreed before fabrication, and the shop drawings show them for your architect to review.
Yes. Balconies, choir lofts, steeple frames, bell towers and entrance canopies are framed with the building and checked for their loads and the wind on them.
We supply acoustic liners and insulation in the roof and walls where the package calls for them, and frame for the acoustic panels and sound equipment your acoustician specifies. The acoustic design itself comes from that specialist.
Yes. Many congregations do. We design the first building with the next one in mind: grid lines, the end wall that will open and the connection details are planned so phase two bolts on without rework.
Yes. A fellowship hall or family life center is often the worship space for the first years. We design its clear span and roof loads for that use and for the gym, meals or events it hosts later.
Yes. Our plant in Vietnam fabricates 2,500 t (5.5 million lb) of structural steel a month, and our largest single job is about 5,000 t. A worship center, education wing and gym can share one design and ship building by building, with production slots confirmed in the quote.
Yes. We designed and fabricated the steel structure and sheeting of a two-floor mosque in Georgetown, Guyana, framed with plate girders up to 1.5 m (4.9 ft) deep. The Goldfields Arts Centre in Western Australia has about 400 t of World Steel steel in a curved long-span roof over its main hall, with curved rafters welded from plate in our plant. We also framed the Whaleback golf clubhouse, about 50 t.
IBC 2024, ASCE 7-22 and AISC 360 by default, or your jurisdiction’s edition. Large worship rooms often fall in a higher Risk Category under ASCE 7 because of the crowd; your Engineer of Record confirms it. The PE seal and the permit belong to the US contractor, our customer, and their engineer. World Steel designs and fabricates; it does not seal drawings.
No. World Steel designs, fabricates and supplies the steel. Foundations, erection and site work are the scope of the US contractor, our customer, and the trades they hire.
No. Send the seating, the phases you plan and the site address and we return a written scope and quotation for each phase.
Keep reading
Send the seating, the phases you plan and the site address. We design the first building to welcome the next and send a written scope for the steel, made in our plant in Vietnam.