Utah · Salt Lake distribution
Structural steel for Salt Lake City distribution centers
Salt Lake City sits where I-15 and I-80 cross and where rail lines meet, a day’s drive from much of the Mountain West. Large distribution centers fill the west side of the valley, from the airport area to West Jordan, and a state inland port is developing more. Buildings are big, clear-span and in high seismic country.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and landed at Los Angeles–Long Beach or Oakland for your Utah site.
- Crossroads
- I-15 and I-80
- Cluster
- West side of the valley
- Buildings
- Clear-span, tall
- Loads
- Snow and seismic
Why it matters
Clear spans, snow and shaking
Distribution centers want wide clear spans, tall clear heights for racking and long rows of dock doors. In Salt Lake City the roof also carries snow, and the frame and bracing must resist Wasatch Front seismic loads on soft lake soils.
We size rigid frames and purlins for the span, the racking, the snow and the seismic loads, and pack the steel in erection order so the crew can keep moving down the building.
What we design and fabricate
Steel for distribution centers
Clear-span frames
Rigid frames for wide spans and tall clear heights.
Dock walls
Framed openings for long rows of dock doors.
Snow roofs
Purlins and bracing for the site snow and drift.
Seismic bracing
Rod and frame bracing for the site category.
Who does what
Warehouse steel, split clearly
World Steel supplies
- Rigid frames, purlins and girts for the span and loads
- Dock canopies and framed openings
- Bracing for the site seismic category
- Steel packed in erection order
- Tekla shop and erection drawings, included
The US contractor arranges
- The owner contract and the site plan
- Engineer of Record approval and PE seal
- Permits and inspections
- Slab, foundations and dock equipment
- Erection and site work
Utah
What we do not claim
World Steel names no logistics company as a customer and claims no completed warehouse in Utah. We fabricate the structural steel for the US contractor who builds the distribution center.
Utah ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Utah contractors
Utah contractors: let’s win the next project together
If your next bid involves Salt Lake distribution, World Steel wants to be your long-term, win-win steel partner in Utah. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Utah project is cut, welded, inspected and packed.
Q&A
What Utah buyers ask
How wide can the clear spans be?
Rigid frames are sized for the span, the racking and the site loads your Engineer of Record confirms; wide clear spans are routine.
Do you design for snow and seismic together?
Yes. Frames, purlins and bracing are checked for the site snow, drift and seismic loads.
How are deliveries packed?
In erection order, so each load matches the next bays the crew sets.
Official sources: Utah Inland Port Authority
Utah solutions
Every Utah guide
Related pages
Code facts on this page summarize Utah practice, the Utah State Construction Code, the IBC with Utah amendments, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in Utah?
Send the drawings or the site address, size and use. We set the Utah design basis with your Engineer of Record, design or detail the steel to the Utah State Construction Code and for seismic and snow loads, and quote it made in our plant in Vietnam, packed in erection order and landed at Los Angeles–Long Beach or Oakland for the rail or truck run to your site.