Multi-story building · Ho Chi Minh City, Vietnam · 2020
The Sun Tower
Steel structure designed, fabricated and supplied by World Steel. Tonnage not published.
Proof of capacity
What makes this project type different
Offices, hotels, hospitals, schools, labs, mixed-use blocks and parking structures are where steel competes with concrete. It wins on speed, on long column-free floors and on a lighter frame and smaller foundations, provided the steel package is detailed and delivered as tightly as the schedule requires.
That means a frame broken into erection tiers, columns spliced at the right levels, every connection detailed for the deck and the fire protection, and shipments that arrive in tier order. Fire ratings and, in seismic regions, AISC 341 systems and AWS D1.8 welds are part of the same package.
Composite beams and deck set member depths, camber and the shear studs (field-welded through the deck).
Braced or moment frames for wind and seismic, chosen by the Engineer of Record.
Rated frames need steel prepared for its listed fire protection.
Long, open floors are checked for walking vibration, not only strength.
Podiums, parking levels and lobbies often need transfer girders.
The frame is detailed, shipped and erected tier by tier.
Structures and systems
Your Engineer of Record chooses the systems. These are the ones we see most often in this type of project, all fabricated in our plant in Vietnam.
| Structure | Typical system | What we fabricate |
|---|---|---|
| Columns | Rolled or built-up columns spliced every two or three floors | Columns, splices, base plates |
| Floors | Composite beams and girders on metal deck | Beams, girders, deck support, edge angles |
| Lateral system | Concentric braced or moment frames | Braces, gussets, moment connections |
| Transfers | Plate or built-up transfer girders | Built-up girders on our own lines |
| Stairs and secondary | Stair towers, canopies, screens | Stairs, rails, secondary steel |
Our advice before you bid
Braced frames are usually lighter; moment frames keep facades open. The choice shapes every connection.
Rated members and their primer must suit the fire product, or steel gets stripped on site.
Tiers set the splice levels, the drawing releases and the shipping order.
Open-plan floors may need deeper beams; it is cheaper to know at design.
Heavy transfers welded from plate can be lighter than the deepest rolled sections.
World Steel projects of this type
Steel designed, fabricated and supplied by World Steel. Photos are from our project archive and open full size.
Multi-story building · Ho Chi Minh City, Vietnam · 2020
Steel structure designed, fabricated and supplied by World Steel. Tonnage not published.
Parking structure · Thailand · 2022
Steel structure designed, fabricated and supplied by World Steel. Tonnage not published.
Multi-story frames by World Steel
Towers, offices and floors framed in World Steel steel, photographed before cladding. Made in our plant in Vietnam at up to 2,500 t of structural steel a month. Each tile opens the photo; the name opens the project.
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Real photos
World Steel’s own shop floors and jobs, where the steel for US projects is made: 2,500 metric tons of structural steel a month. Not stock images.
Inside our factory
How World Steel supports this
Delivered by tier
Drawings, fabrication and shipments released tier by tier.
AWS D1.8 qualified
Qualified procedures and welders for seismic welds where required.
Ready for fire protection
Primer matched to the listed fire product before fabrication.
The structural steel ecosystem
The products we make for this part of a seismic structure, the services that come with them and past World Steel projects, all one click away.
Photo
Photo
Photo
Photo
Photo
Past World Steel work, shown for the structure type. It does not describe the seismic criteria of any one project.
Standards on this page
Each standard page explains what it covers, the edition we reference and how we apply it. We design and fabricate to these standards; they are not certifications.
Keep reading
Questions from US contractors
Yes. Columns, floor beams and girders, bracing or moment frames, transfer girders, stairs and secondary steel, detailed in one model and shipped by tier.
No. Deck installation and shear studs, which are field-welded through the deck, are site work in the US contractor’s scope. We supply the steel ready for them.
Yes. We fabricate AISC 341 systems with AWS D1.8-qualified procedures and welders, as the Engineer of Record’s design requires.
Either the Engineer of Record or, where the contract delegates it under AISC 303, our engineers, with calculations for the Engineer of Record’s review.
Yes. Shop drawings come with every project at no extra charge, from one Tekla Structures model of the whole job. Your Engineer of Record reviews and approves the structural drawings.
No. World Steel designs, fabricates and supplies the steel structure. Erection, the PE seal, the permit and site work are the scope of the US contractor, our customer.
A plain-English guide for US contractors, not engineering advice for a specific site. Ranges are typical, the adopted codes govern, and your Engineer of Record sets the design criteria for each project.
Send the drawings, the specification and the schedule. Our estimators take off the tonnage, confirm the production slot we can hold for it and return a written scope for steel designed to US codes, made in our plant in Vietnam and shipped to your US port by erection sequence.