Frame outside the box
Insulated panels hang inside the steel.
- Steel stays warm and dry, outside the cold
- Panel ceiling hung from the roof steel on hangers
- Fewest thermal bridges through the insulation line
Follow the cold line
The dashed blue line is the insulated envelope. The frame stays outside it; these are the places where the two meet and the details we design there. Point at an item to find it on the drawing.
Refrigeration plant, evaporators, piping, controls and insulated floors are supplied by your refrigeration contractor; we supply the steel that carries them.
The steel and the insulated box
A cold store is an insulated box inside or around a steel frame. Where the frame sits decides how much steel crosses the insulation line, and every crossing is a place for frost and drips. We compare both arrangements for your temperatures.
Insulated panels hang inside the steel.
Insulated panels form the outer skin.
Illustration; the room temperature is an example. Your refrigeration engineer and panel supplier set the envelope.
The cold storage ecosystem
Each ring of a cold store is a trade of its own. The red dashed ring is the refrigeration contractor’s scope; everything inside it links to the products and pages we supply.
Refrigeration plant, evaporators and controls: your refrigeration contractor
A World Steel cold store
A high-bay cold store in Tay Ninh Province, Vietnam. Phase 1 of this job took about 1,000 t of World Steel structural steel, and the owner came back for phase 2. Tap a photo to open it full size.
Photo
Frame going up
Photo
Full-height frame
Photo
Braced frame, panels going in
Photo
Envelope nearly closed
Photo
Clad cold store A project outside the US, shown for the structure type; it is not a US site.
Large projects
World Steel frames large food factories with long-span roofs and cold stores like New Era in Vietnam, where phase 1 alone took about 1,000 t of steel and the owner came back for a second phase. These are food processing plants we framed; each one shows the scale our plant handles.
Photo
CPV food factory, about 2,500 t
Photo
Long-span roof trusses
Photo
Based meat factory, Thailand Projects outside the US, shown for their scale; they are not US sites. CPV and Based are food processing factories, not cold stores.
Fabrication capacity
2,500 metric tons a month
About 2,750 short tons of structural steel fabricated every month in World Steel’s own plant in Vietnam.
Big tonnage does not have to queue behind other work. The plant is sized to take the steel package of a large US job, from heavy frames and built-up girders to multi-story framing, and to ship it to your US port in the order your erector needs it.
Largest jobs delivered: Sunpro Steel 5,000 t · CPV Food 2,500 t · Long Son petrochemical 2,000 t · M&D Thailand 2,000 t →Real World Steel frames
Long-span food plant roofs in Vietnam and Thailand, and World Steel frames erected in a Japanese winter. Tap a photo to open it full size.

Photo
CPV, trusses from below
Photo
Trusses going up
Photo
Two cranes, one roof
Photo
Based meat factory
Photo
Erected in the snow Projects outside the US, shown for the structure type; they are not US sites.
Cold store and food projects by World Steel
Photo
A cold store: phase 1 took about 1,000 t of steel, and the owner came back for phase 2. Vietnam · 2024.
Photo
Food processing factory with long-span trusses, about 2,500 t of steel. Vietnam · 2020.
Photo
Meat processing factory with white-coated frames. Thailand · 2022.
Buying steel from outside the US
US buyers ask us the same ten questions before they order steel made in Vietnam. Here is what we do about each one, and where you can check it for yourself.
What the package contains
A cooler or freezer only works when frame, panels and vapor retarder act as one envelope. We coordinate insulated panels with the structure, place thermal breaks wherever steel crosses the cold line, and hang evaporators and piping from steel designed for them. Your refrigeration contractor supplies and commissions the cooling system.
standard = in the base scope · optional = add if you want it · confirm = depends on your design
Talk to an engineer
Our engineers work in English. We keep the frame outside the cold box, detail every crossing and send a written scope for the steel.
Asked by cold-chain owners and contractors
9 answers on the cold envelope, equipment steel, large projects and scope.
Both work. With the frame outside the box, the insulated panels hang inside and the steel stays warm and dry; with the frame inside, the panels form the outside skin and every column and girder sits in the cold. We compare both for your temperatures, layout and panel supplier.
Any piece of steel that passes through the insulation carries cold out and heat in, and can grow frost or drip condensation. We detail panel hangers, penetrations and connections so as little steel as possible crosses the insulation line.
The floor insulation, vapor barrier and under-floor heating that stop frost heave are designed by your refrigeration and civil engineers and built by your contractor. We coordinate column bases and anchor rods with them.
Yes. Tell us the equipment weights and where they hang or stand. Hanger steel for evaporators inside and platforms for condensing units on the roof are designed with the frame.
No. Refrigeration plant, evaporators, piping, controls and insulated floors belong to your refrigeration contractor. We supply the steel that carries them.
Yes. Our plant fabricates 2,500 t (5.5 million lb) of structural steel a month. Large cold stores are split into packages by building or zone, with production slots confirmed in the quote, and later phases reuse the first phase’s model, as on the New Era Cold Storage project in Vietnam, where phase 1 alone took about 1,000 t of steel.
IBC 2024, ASCE 7-22 and AISC 360 by default, or your jurisdiction’s edition. Your Engineer of Record approves the drawings, and the PE seal and permit belong to the US contractor, our customer, and their engineer. World Steel designs and fabricates; it does not seal drawings.
No. World Steel designs, fabricates and supplies the steel structure, and panels if you want them. Foundations, insulated floors, erection and site work are the scope of the US contractor, our customer.
No. Send the room layout, the temperatures and the site address and we return a written scope and quotation.