Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Grenada steel solutions

Structural steel for large Grenada projects, from St George’s to Carriacou

Grenada learned what wind can do in 2004, when Hurricane Ivan damaged most of the buildings on the island, and Carriacou and Petite Martinique learned it again with Beryl in 2024. Today the Spice Isle is building resorts on Grand Anse, campus and public buildings around St George’s, and new homes and schools on the sister islands. We design and fabricate that steel in our own plant in Vietnam, 2,500 t a month, and ship it packed in erection order to St George’s.

Ever conscious of God we aspire, build and advance as one people

Large-project capacityIAS AC472

2,500 t

of structural steel a month, own plant in Vietnam, shipped to St George’s

Metal floor deck laid on each level of a steel-framed building
Going up beside the plant in Vietnam: World Steel framed its own office building.

National symbols of Grenada

Built with respect for Grenada

Red for courage and warmth, gold for the sun and the people’s wisdom, green for the land, seven stars for the parishes and the nutmeg of the Spice Isle. Four national symbols, and what each one means for the steel we make for Grenadian buildings.

The nutmeg

The Spice Isle grows much of the world’s nutmeg, and the pod is on the flag. After Ivan the trees took years to come back; we design buildings to come through the next storm.

The seven stars

One star for each parish, Carriacou and Petite Martinique among them, set in the red border. One standard of care for every parish we ship to.

The Grenada dove

One of the rarest birds on earth, found only in the dry forests of the west coast. Small things protected well last a long time, which is the idea behind every coating we apply.

The bougainvillea

The national flower climbs over walls across the island in red, purple and gold. Colour that survives sun and salt, like the finish on our coated steel.

Six parishes and the sister islands

Pick your parish. Each one has its own steel page.

Grenada has six parishes on the main island, from St George with the capital and Grand Anse to St Patrick at the northern tip, and Carriacou and Petite Martinique, the sister islands in the Grenadines, have their own page. Each page covers the main town, the ground, the hurricane and earthquake conditions, the route from St George’s and the steel we recommend for what gets built there.

SouthNorth and the spice countryCarriacou and Petite Martinique

South

St George with the capital, the port, the airport and Grand Anse, and St David on the south-east coast.

North and the spice country

St John, St Mark, St Patrick and St Andrew: nutmeg and cocoa country, Grenville and the Grand Etang mountains.

Carriacou and Petite Martinique

The sister islands in the Grenadines to the north, with Hillsborough and their boatbuilding tradition.

Why World Steel

What a large Grenadian project gets from World Steel

Large-project capacity

2,500 metric tons of structural steel a month from our own plant, released area by area.

Large-project program →

Hurricane design

Frames, purlins, cladding and anchors designed for the storm load path Ivan and Beryl tested.

Hurricane guide →

Seismic detailing

Ductile frames and welds detailed for the earthquake values your engineer sets.

Earthquake guide →

Ready for approval

Calculations that state the code basis for your engineer and the Planning and Development Authority.

Building code guide →

Coated for salt air

Paint systems and galvanizing chosen for the coasts of all three islands.

Coatings guide →

Shipped to St George’s

Packed in erection order and shipped to the Port of St George’s, with a sea leg to Carriacou.

Port delivery guide →

Project types

What Grenada builds in steel, and where

The four project types behind most steel orders on the three islands, with where they cluster and what we recommend. Every photo is a World Steel project or our plant.

Finished steel building in blue wall panels with a walk-in door

Logistics and light industry

St George’s, Grand Anse, Frequente

Clear-span warehouses, distribution and light industrial buildings near the port and the airport.

Completed, clad building by World Steel in Quang Ngai Province, Vietnam.

Tall columns and rafters inside a clear-span building with roof sheeting on

Schools and shelters

Every parish and the sister islands

Classrooms, halls and sports buildings designed to serve as hurricane shelters where required.

Clear-span interior on a World Steel job in southern Vietnam.

Buy it all in one place · Grenada

Everything your project in Grenada needs in steel, from one desk

Resorts, the university campus, warehouses and public buildings on three islands. One World Steel order covers design, drawings, fabrication, coating, inspection, packing and shipping, FOB Vietnam or CIF St George’s, with every piece tracked live in PEB Studio.

All solutions and products for Grenada

Picked for Grenada

One desk, every step

  1. DesignTo the basis your engineer of record sets
  2. DrawingsShop and erection drawings, no extra cost
  3. MaterialsNamed mills, a mill certificate for each piece
  4. FabricationLaser cut up to 100 mm, 2,500 t a month
  5. CoatingPaint brands sold locally, galvanizing where needed
  6. Quality controlAn ITP per project, ILAC-accredited labs
  7. PackingErection order, piece marks, packing lists
  8. ShippingFOB Vietnam or CIF St George’s
  9. Your contractor erectsClearance at St George’s, site work and erection, with the engineer of record.
FOBVietnam port, your forwarder
CIFSt George’s, freight and insurance by us
Track it live in PEB Studio →

No prices are published. World Steel designs and fabricates the steel; the local contractor, our customer, erects it, and the engineer of record approves the drawings and seals them where local rules require.

Seeking Grenadian contractor partners

Grenadian contractors: you win the job, we fabricate the steel

Resorts on Grand Anse and the south coast, campus and public buildings, warehouses in St George, and the rebuilding of Carriacou and Petite Martinique after Hurricane Beryl are big steel packages. You win the job and run the site. We design, detail and fabricate the steel in our own plant, ship it to St George’s and back your bid with drawings and live tracking.

  • Resorts on Grand Anse and the south coast
  • Campus, schools and public buildings
  • Rebuilding on Carriacou and Petite Martinique

Hurricanes, salt air, earthquakes

Steel for Grenada’s storms and sea

A broad hazard picture for Grenada and the Caribbean guides that go deep on each one: wind and uplift design, ISO 12944 coatings, galvanizing, coastal details and post-storm care. Your engineer of record sets the site values.

All Caribbean hurricane and marine guides

Real World Steel photos

Every Grenada package starts in our plant in Vietnam

Real photos from World Steel: the plant, plate store, beam line, girders, fit-up, blasting, paint shop and packed bundles. None is shown as a site in Grenada.

Drone view across the World Steel plant: office block in front, fabrication halls behind
The plant that fabricates US orders: World Steel in Tay Ninh Province, Vietnam (Hai Son Industrial Park, formerly Long An).
Shop worker taking a measurement on a steel plate in the yard
Incoming plate is measured at intake, before any cutting, in the Vietnam plant.
Welder beside a deep built-up girder running through the automatic line
A deep plate girder going through automatic welding at World Steel, Vietnam.
Operator checking web and flange plates set in blue H-beam assembly jigs
Web and flange plates set in the H-beam assembly jigs before automatic welding, Vietnam plant.
Quality inspector taking dimensions on a finished steel member
Dimensional check by QC in Vietnam before a member goes on to blasting and paint.
Crew loading steel parts onto the shot-blasting conveyor
Parts going into the blaster ahead of primer, World Steel, Vietnam.
Coated frame parts with welded brackets in the paint hall
Frame parts with their brackets, coated and drying, World Steel, Vietnam.
Gray members stacked and strapped together on a packing rack
Gray members strapped into a bundle on the packing rack, World Steel, Vietnam.

Caribbean logistics

Ports for Grenada: shipped from our plant in Vietnam

All Caribbean ports and routes

Questions from Grenadian buyers

Grenada questions we hear most

Which building rules apply to steel buildings in Grenada?

New buildings need approval from the Planning and Development Authority. Structural design follows the Grenada Building Code, from the regional OECS model code, with US standards such as the IBC and ASCE 7 commonly used for the detail. We state the code basis your engineer of record sets on the first calculation sheet.

Do hurricanes hit Grenada?

Yes. Grenada was long thought to sit south of the main storm track, but Ivan in 2004 and Emily in 2005 changed that, and Beryl in 2024 devastated Carriacou and Petite Martinique. We design the whole load path for the wind speed your engineer sets.

Is Grenada an earthquake zone?

Yes. It sits on the Lesser Antilles arc, and Kick ’em Jenny, an active underwater volcano, lies just north of the island. Steel frames are designed for the seismic values your engineer sets.

How large a package can you take?

Our plant fabricates 2,500 metric tons of structural steel a month. Our largest jobs include Sunpro Steel at 5,000 t, CPV Food at 2,500 t and the Long Son petrochemical complex at 2,000 t.

Which port do you ship to?

The Port of St George’s, in the capital’s harbour. Steel for Carriacou and Petite Martinique goes on by sea from there.

Do you erect the steel?

No. World Steel supplies the steel structure only. Erection and site work are the contractor’s scope, done from our erection drawings and piece marks with our engineers on call.

Talk to an engineer

Send the parish and the plan. We tell you what Grenada asks of your steel.

Our engineers and project managers work in English and reply with the code, wind, ground and delivery questions for your site.

Honest status. World Steel designs and fabricates to the code basis your engineer of record sets for Grenada and the US standards it references. We hold no approval, licence or registration in Grenada and do not apply for permits; planning permission, building approval and inspections are the contractor’s scope with the engineer or architect of record. We supply the steel structure only; erection and site work are the contractor’s.

Keep reading

Contact World Steel · Grenada

Talk to us about steel for Grenada

WhatsApp, email or a video call with our engineers, booked at an hour that suits St George’s. Our contact page for Grenada has the ports, the local time and the form.