Made in Vietnam, landed at Charleston
Why ship your building through Charleston
SC Ports operates three container terminals in the Charleston harbor: Wando Welch, North Charleston and the Hugh K. Leatherman Terminal, which opened in 2021. Columbus Street Terminal handles breakbulk and ro-ro. Inland Port Greer and Inland Port Dillon move containers by rail to the Upstate and the I-95 corridor.
For South Carolina’s manufacturing belt, your building is fabricated in World Steel’s plant in Vietnam, shipped into Charleston and moved inland by Norfolk Southern or CSX. PEB Studio shows every bundle from the shop floor to the inland port.
-
One package, one plant
Primary frames, secondary steel, panels, trims and fasteners from World Steel’s plant in Vietnam. The steel comes mainly from mills in Vietnam, each heat on record.
-
Accredited fabrication
World Steel is the first and only steel building plant in Vietnam accredited under IAS AC472.
-
Designed to US codes
IBC and ASCE 7 loads, steel designed to AISC 360, with drawings ready for your engineer’s review.
-
Packed for this port
Containers or breakbulk sorted by erection sequence, with seal numbers, weights and photos in the packing report.
Port facts
Terminals, channel and connections at Charleston
Channel
15.8 m (52 ft) harbor
Rail
CSX and Norfolk Southern; inland ports at Greer and Dillon
Highways
I-26, I-526, I-95
| Terminal | Where / operator | Cargo |
|---|---|---|
| Wando Welch Terminal | Mount Pleasant | Containers |
| North Charleston Terminal | Cooper River | Containers |
| Hugh K. Leatherman Terminal | Former Navy Base, North Charleston | Containers |
| Columbus Street Terminal | Breakbulk and ro-ro | Breakbulk |
Source: SC Ports: facilities, USACE and port notices, last reviewed November 17, 2026. Terminal operators and depths change; your booking names the terminal for your cargo.
From our plant to Charleston
How your steel gets here
Through the Panama Canal on most services and up the Atlantic coast to Charleston; some services use the Cape of Good Hope or the Suez Canal.
Your shipment to Charleston, leg by leg
Run the full simulation →By road
About 2 hours
World Steel pays
By sea · via Panama
≈ 11,600 nmi illustrative lane
Split between us
Customs, truck or rail
Planned with your trucker
You pay
Risk passes to you when the steel is on board the vessel at the named Vietnamese port.
Inland reach
Where steel goes from Charleston
Norfolk Southern serves Inland Port Greer for the Upstate; CSX serves Inland Port Dillon for the Pee Dee and I-95. Trucks run I-26 to Columbia and the interior.
Designed for the region
Site conditions we design for around Charleston
Hurricane Coast Steel Buildings
The Lowcountry is hurricane-prone with wind-borne debris rules near the coast.
How we design for itSeismic Design
Charleston has notable seismic hazard for the East Coast; the 1886 earthquake is in the design maps.
How we design for itCoastal Corrosion Protection
Marsh and harbor sites need a marine-grade coating.
How we design for itOn arrival
Receiving your steel at Charleston
Upstate jobs
Route containers by rail to Inland Port Greer to shorten the truck leg.
Seismic and wind together
Coastal South Carolina designs for both; we set the lateral system early.
Oversize pieces
Breakbulk can discharge at Columbus Street Terminal.
Documents sent ahead to your broker
- Commercial invoice and packing list per container
- Bill of lading and certificate of origin
- Container packing report with seal number and VGM
- EN 10204 3.1 mill certificates
- Shipping marks with a QR link to each member’s passport
What the quote states for Charleston
- The Incoterm, for example FOB Vietnam, CFR or CIF Charleston
- Who acts as importer of record
- Containers, flat racks or breakbulk for oversize members
- Delivery to the port or to a named US place, if offered
No prices, freight rates or duty estimates are published.