New Jersey · Cold storage and food
Structural steel for New Jersey cold storage and food plants
New Jersey feeds the Northeast. Freezer and cooler warehouses cluster near the port and the Meadowlands, and food and beverage plants run across Middlesex, Burlington and South Jersey, close to the largest consumer market in the country. Both need insulated envelopes, heavy roof plant and steel that stays clean.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and landed at Port Newark–Elizabeth, a short drive from your New Jersey site.
- Cold storage
- Port and Meadowlands
- Food plants
- Central and South Jersey
- Envelope
- Insulated, thermal breaks
- Roof
- Heavy refrigeration plant
Why it matters
Cold, clean and close to the market
A freezer warehouse loses energy and ices up wherever steel passes through the insulated envelope without a thermal break. Refrigeration plant sits on the roof or on platforms, and docks need sealed doors and canopies. In process rooms, ledges and pockets collect product and water, so the steel is detailed to drain and to clean.
Our plant built 1,000 t of steel for the New Era cold storage in Vietnam and 2,500 t for the CPV Food processing factory. We design or detail the frame, the thermal breaks and the refrigeration platforms, and specify galvanizing or epoxy coatings for wet areas.
What we design and fabricate
Steel for cold storage and food plants
Thermal breaks
Steel details that keep the envelope continuous.
Refrigeration platforms
Roof and interior platforms for the plant.
Washable details
Sealed and sloped details in wet process areas.
Dock steel
Door framing and canopies for sealed docks.
Who does what
Cold storage steel, split clearly
World Steel supplies
- Frame, platform and dock steel design or detailing
- Thermal break and envelope steel details
- Coating systems for wet and cold areas
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- Temperature zones and food safety design with the owner
- Engineer of Record approval and PE seal
- Municipal permit and inspections
- Refrigeration, floors and process equipment
- Erection and site work
New Jersey
What we do not claim
World Steel names no cold storage or food company in New Jersey as a customer and holds no food safety certification for buildings. New Era and CPV Food are projects in Vietnam.
New Jersey ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · New Jersey contractors
New Jersey contractors: let’s win the next project together
If your next bid involves cold storage and food plants, World Steel wants to be your long-term, win-win steel partner in New Jersey. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your New Jersey project is cut, welded, inspected and packed.
Q&A
What New Jersey buyers ask
Do you detail thermal breaks?
Yes. We detail the steel where it passes through the insulated envelope so the cold room stays continuous.
Can you supply refrigeration platforms?
Yes. Roof and interior platforms for the refrigeration plant, designed with their own snow drift where they sit on the roof.
Have you built cold storage?
Yes. Our plant supplied 1,000 t of steel for the New Era cold storage in Vietnam, published on our projects page.
Official sources: New Jersey Department of Agriculture
New Jersey solutions
Every New Jersey guide
Related pages
Code facts on this page summarize New Jersey practice, the New Jersey Uniform Construction Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in New Jersey?
Send the drawings or the site address, size and use. We set the New Jersey design basis with your Engineer of Record, design or detail the steel to the Uniform Construction Code and to wind, snow and flood, and quote it made in our plant in Vietnam, packed in erection order for Port Newark and a short drive to your site.