Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

PEB Studio

Track your building through our Vietnam factory from your desk in the US

Our plant in Vietnam runs on PEB Studio, and your team in the US gets a login to follow production in real time: fabrication, inspection, packing and shipping of your own order, as each step is scanned, instead of waiting for the next status email.

PEB Studio · your projectSample figures
Fabricated65%by weight, sequences 1–3
QC released1,180members
Open NCRs2both under repair
Containers sealed14photos and VGM on file
C-12WeldingIn progress
R-21QC releaseDone
P-104Packed · B-014Done
C-15Hold: NCR-006On hold

How a member is tracked

One record per piece, from mill to jobsite

Every part in the Tekla model gets a record and a QR label. Each shop step is scanned and shows up in your project immediately.

  1. Material
  2. Cutting
  3. Fit-up
  4. Welding
  5. Inspection
  6. Coating
  7. Packing
  8. Shipping
  9. Site receipt

Production status

How much of your structure has cleared each stage, by member, assembly or area.

Shop photos

Pictures of your members in production, attached to the matching records.

Inspection results

Dimensional, NDT and coating results as each one is signed off.

Weld records

The procedure and the qualified welder behind each weld.

Packing lists

Which members went into which bundle and container, with loading photos.

Shipping documents

Booking details and export paperwork for every shipment.

Closeout records

The quality documents that make up your turnover package.

QR lookup

Scan a label on site and open that member’s record on a phone.

PEB Studio for your project

Why it matters

Visibility across an ocean

Buying steel from overseas usually means trusting the photos a supplier chooses to send. PEB Studio gives you the records our production and QC staff use, the moment they are created. Your project manager is still there to explain, but you no longer rely on anyone’s word.

Is my order on schedule?
The usual answerA status email when someone has time to write one
With PEB StudioProgress by stage and sequence, the moment it is scanned
Did it pass inspection?
The usual answerPhotos the supplier chose to send
With PEB StudioEvery inspection attempt per member, failed ones included
What is in container 9?
The usual answerA spreadsheet sent after departure
With PEB StudioA packing list locked at sealing, with photos and the seal number
Where does this rafter go?
The usual answerSearch the drawings on site
With PEB StudioScan the QR label: gridline, elevation and erection step

Inside PEB Studio

A look at the screens

Five views your project team uses, shown with demonstration data from a training project rather than a real customer order.

PEB Studio production dashboard with fabrication progress by stage (demonstration data) Demonstration data

Production

Shop progress by stage, with the holdup flagged

Cutting, fit-up, welding, blasting and painting are tallied by count and weight, alongside what is waiting on QC and what failed. Your regular production report is built from the same numbers.

These are real PEB Studio screens filled with sample training data, so no customer’s job is exposed and personal names are masked.

Access and security

Your project, your data

Project-level permissions

Each request is authorized server-side against your project and role, so a customer login only reaches that customer’s own order.

Any device, no install

PEB Studio runs in a browser on a laptop, tablet or phone, so your superintendent can use it on site.

QR codes carry no data

A label only points to the member’s read-only passport and grants no rights. Records are append-only.

Released documents only

You see documents released to you, never internal notes or pricing, and each released file is frozen with a SHA-256 fingerprint.

Logins for your whole team

Ask your project manager to add the people who should see the job. Each one sees only what their role needs.

  • US contractor

    Schedule, production and shipping at a glance

  • Engineer of Record

    Released drawings and calculation sets

  • Special inspector

    Inspection records and the data record

  • Erector

    Erection navigator and QR lookup on site

Asked by US contractors

Questions on peb studio tracking

Is PEB Studio access included?

Yes. Customers log in to follow their own order, and access is set up at kickoff.

How current is the data?

Records appear as each step is scanned and signed off in the shop, so you see progress as it happens rather than in a weekly digest.

Is there software to install?

No. It runs in a standard web browser on a computer, tablet or phone.

Can my erector, engineer or owner get access?

Ask your project manager to add the people on your team who should see the project.

Can another customer see my job or my pricing?

No. Each request is cleared server-side against your project and role. Customer screens show released documents only, with no internal notes or prices.

What does the QR label on a member show?

A read-only passport with the member’s drawings, shop stages, bundle, container and site status. The code itself stores no data and grants no rights.

Keep reading

Next in how we work

World Steel designs, fabricates and supplies the steel structure. You, the US contractor and our customer, erect it, and with your Engineer of Record approve the drawings and handle the PE seal and the permit.

Get a quote, then get a login

Send drawings, a sketch or the footprint and address. When your order starts, PEB Studio shows it from the first approval drawing to closeout.