Six places steel and freight hide in a design
Tick the ones that matter to you in the form. On a large job, steel saved in one bay is saved in every bay.
-
Steel weight
Tapered and built-up sections sized to the load, not to a catalog.
-
Frame spacing
Bay spacing tuned against purlin, girt and foundation cost.
-
Connections
Fewer, simpler connections that are faster to fabricate and erect.
-
Coating system
A coating matched to the real exposure, not the worst case.
-
Container loading
Members cut and nested so fewer containers cross the Pacific.
-
Erection planning
Pieces and sequences planned with your erector in mind.
Every change is an option, written up with its reason. Your Engineer of Record approves it or it does not happen.
Capacity for large jobs
The plant behind your quote has already built these
2,500 metric tons (about 2,750 short tons) of structural steel a month, from our own IAS AC472-accredited plant in Vietnam. Each job below was designed, detailed, fabricated and shipped by World Steel.
-
5,000 t about 5,500 short tons
Sunpro Steel Factory
Steel industryCan Tho City, Vietnam · 2024
-
2,500 t about 2,750 short tons
CPV Food Processing Factory
Food processingDong Nai Province, Vietnam · 2020
-
2,000 t about 2,200 short tons
Long Son petrochemical complex
Oil and gasBa Ria–Vung Tau, Vietnam · 2022
-
2,000 t about 2,200 short tons
M&D (MD Factory)
Warehouse and industrialThailand · 2024
-
1,500 t about 1,650 short tons
Tongwei Tien Giang feed factory, phase 1
Animal feedDong Thap Province, Vietnam · 2018
-
1,000 t about 1,100 short tons
New Era cold storage
Cold storage, phase 1 tonnageTay Ninh Province, Vietnam
Before you send
Questions contractors ask first
Something else? Write it in the message box and an engineer answers with your quote.
Do you promise a saving?
No. Each job is different. We show where steel, connections or freight can come out and what each change involves, and you decide.
Will our Engineer of Record stay in charge?
Yes. Every idea is an option for your Engineer of Record to accept or decline. Nothing changes in the design without that approval.
Does a review cost anything?
A review of a job you are pricing with us is part of quoting it. Send the design and the code edition and we tell you what we found.
Not quite your project? Pick another route
- I have a bid package for a large jobYou are bidding a large job and have the bid documents.
- I am a contractorYou are a GC, design-builder, EPC or erector pricing steel or looking for a long-term fabricator.
- I have drawingsYou have a permit set, IFC model or sketches.
- I need a complete buildingYou know the use, the site and a rough size, but not the steel yet.
- I need corrosion protectionYour site sees salt air, de-icing salt, fertilizer or fumes.
- I’m on the design teamYou are on the design team and need data, answers or delegated design.
- I need federal supply supportThe job is publicly funded or on a federal site.
- All quote routes