Maine · Shipyards
Structural steel for Maine shipyards and marine industry
Maine has built ships for centuries. Bath builds Navy destroyers, the naval shipyard at Kittery maintains submarines, and boatyards and marine suppliers line the coast. Their fabrication halls need heavy crane bays, wide doors and coatings for salt air. We fabricate that steel bay by bay.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered through Portland, Boston or New York for your Maine site.
- Hubs
- Bath, Kittery, the coast
- Typical steel
- Halls and crane bays
- Exposure
- Salt air
- Release
- Bay by bay
Why it matters
Heavy cranes by the water
A shipyard fabrication hall carries heavy overhead cranes and very wide doors beside the water, under heavy snow, and expansions happen inside secure, running yards with strict procurement rules.
We fabricate crane columns, runway girders and long-span roof steel, coat it for salt air and release each bay to suit the site.
What we design and fabricate
Steel for industrial plants
Crane columns
Built-up and stepped columns for overhead cranes.
Runway girders
Crane runway beams with fatigue details.
Long-span halls
Clear-span frames over production lines.
Equipment supports
Platforms and frames for process equipment.
Who does what
Plant steel, split clearly
World Steel supplies
- Crane columns, runway girders and hall frames
- Platforms and machinery support frames
- Bay-by-bay releases for expansions
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- Crane data from the crane supplier
- Engineer of Record approval and PE seal
- Foundations and crane rail installation
- Crane installation and commissioning
- Erection and site work
Maine
What we do not claim
World Steel names no Maine manufacturer as a customer and claims no completed Maine plant. World Steel can supply the overhead cranes with the steel; crane installation and commissioning are site scope.
Maine ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Maine contractors
Maine contractors: let’s win the next project together
If your next bid involves shipyards and marine industry, World Steel wants to be your long-term, win-win steel partner in Maine. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Maine project is cut, welded, inspected and packed.
Q&A
What Maine buyers ask
Can you work on secure yards?
Procurement and access rules are checked with the owner first; we follow them where we can bid.
Can you build heavy crane bays?
Yes. We design runway steel to the crane supplier’s data.
Do you name shipyards as customers?
No. World Steel names no company as a customer on this site.
Official sources: Maine Department of Economic and Community Development
Maine solutions
Every Maine guide
Related pages
Code facts on this page summarize Maine practice, the Maine Uniform Building and Energy Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in Maine?
Send the drawings or the site address, size and use. We set the Maine design basis with your Engineer of Record, design or detail the steel to MUBEC, heavy snow and salt air, and quote it made in our plant in Vietnam, packed in erection order and delivered through Portland, Boston or New York for the truck to your site.