Wisconsin · Data centers

Structural steel for Wisconsin data centers

Southeast Wisconsin has become one of the newest hyperscale data center regions in the Midwest, with very large campuses in Mount Pleasant and Port Washington between Milwaukee and Chicago. Cool weather helps cooling, but the halls still carry heavy plant on the roof, and in Wisconsin that plant sits in snow.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and sent by rail through Chicago to your Wisconsin site.

Operator at the control panel of an automatic beam welding line, a built-up beam in front
Running the automatic beam line from its control panel, World Steel in Vietnam.
Clusters
Mount Pleasant, Port Washington
Scale
Hyperscale campuses
Roof
Heavy plant in snow
Release
Phase by phase

Why it matters

Big halls, heavy plant, snow on top

Data halls carry cooling units on the roof or on platforms beside the hall, cable trays below the deck and generator and switchgear yards outside. In Wisconsin, every rooftop unit collects drift, and owners build campus phases fast, one hall after another.

We design or detail hall frames, roof and yard platforms with their drift and service support steel, keep the model for the next phase, and release the steel in the sequence your crew erects.

What we design and fabricate

Steel for data centers

Hall frames

Frames and roofs for large data halls.

Roof plant

Platforms for cooling units, designed with drift.

Service supports

Cable tray and pipe support steel.

Yard steel

Platforms and shelters for generators and switchgear.

Who does what

Data center steel, split clearly

World Steel supplies

  • Hall, roof and platform design or detailing
  • Service support steel coordinated with the model
  • Packages released phase by phase
  • Mill certificates traced by heat
  • Tekla shop and erection drawings, included

The US contractor arranges

  • Owner design standards and loads
  • Engineer of Record approval and PE seal
  • Plan approval, permit and inspections
  • Electrical, cooling and IT systems
  • Erection and site work

Wisconsin

What we do not claim

World Steel names no data center owner or operator as a customer and claims no completed Wisconsin data center.

Wisconsin ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · Wisconsin contractors

Wisconsin contractors: let’s win the next project together

If your next bid involves data centers, World Steel wants to be your long-term, win-win steel partner in Wisconsin. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Wisconsin project is cut, welded, inspected and packed.

Welder beside a deep built-up girder running through the automatic line
A deep plate girder going through automatic welding at World Steel, Vietnam.
Fitter comparing a built-up beam with its shop drawing
In the Vietnam shop, fit-up is compared with the shop drawing before final welding starts.
Welder looking over the stiffeners and end plate of a heavy column
Column stiffeners and end plate under inspection at World Steel, Vietnam.
Blue-coated frames waiting under the shop crane to be packed
Blue frames waiting their turn in the packing area, Vietnam plant.

Q&A

What Wisconsin buyers ask

Do you design rooftop platforms for snow?

Yes. Platforms for cooling plant are designed with their own snow and drift, to your Engineer of Record’s design basis.

Can each phase repeat the last?

Yes. We keep the model and details so repeat halls are released faster.

How large a campus can you supply?

Our plant fabricates 2,500 t a month and releases large packages hall by hall.

Official sources: Wisconsin Economic Development Corporation

Wisconsin solutions

Every Wisconsin guide

Related pages

Code facts on this page summarize Wisconsin practice, the Wisconsin Commercial Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.

Building in Wisconsin?

Send the drawings or the site address, size and use. We set the Wisconsin design basis with your Engineer of Record, design or detail the steel to the Wisconsin Commercial Building Code and to snow, drift and frost, and quote it made in our plant in Vietnam, packed in erection order for rail through Chicago to your site.