Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

New York · Coast

Structural steel for Long Island coastal wind and flood

Long Island, Staten Island and the harbor shore lie in the hurricane-prone region of ASCE 7, and low-lying sites fall in mapped flood zones. Coastal storms push wind into large door openings and water against the base of the building, and salt air works on every exposed member.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and landed at the Port of New York and New Jersey for your New York site.

Long Island coastal windNY
Hot-dip galvanized welded steel frames laid on trestles in a fabrication shop
Galvanized welded frames back from the kettle, laid out on trestles in the shop, Vietnam.
Region
Long Island and the harbor
Wind
ASCE 7 hurricane-prone
Also
Mapped flood zones
Coatings
Galvanizing or duplex

Why it matters

Keep the building closed and above the water

When a large door fails in a coastal storm, wind enters the building and the pressure inside pushes the roof up while the outside pulls it. Designing door framing, roof edges and the load path for the full pressure keeps the frame working as designed.

In a flood zone, the design flood elevation sets where the floor, the base plates and the equipment sit, and which walls must let water through. We design the frame around the elevation your Engineer of Record confirms and specify galvanizing or duplex coatings near the water.

What we design and fabricate

Steel for the coast

Opening framing

Jambs and headers for doors under full wind pressure.

Corner zones

Closer purlins and girts at roof corners and edges.

Flood elevation

Platforms and supports above the design flood elevation.

Salt-air coatings

Galvanizing or duplex systems near the water.

Who does what

Coastal design, split clearly

World Steel supplies

  • Frame, roof, wall and opening framing for the stated wind
  • Supports set to the confirmed flood elevation
  • Coating systems for coastal exposure
  • Mill certificates traced by heat
  • Tekla shop and erection drawings, included

The US contractor arranges

  • Site wind, exposure and flood elevation confirmed by the Engineer of Record
  • Door, window and cladding product approvals
  • Engineer of Record approval and PE seal
  • Local permit, floodplain review and inspections
  • Erection and site work

New York

What we do not claim

World Steel holds no New York or coastal product approval. Doors, glazing and cladding carry their own ratings, arranged by your team.

New York ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · New York contractors

New York contractors: let’s win the next project together

If your next bid involves Long Island coastal wind, World Steel wants to be your long-term, win-win steel partner in New York. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your New York project is cut, welded, inspected and packed.

Galvanized poles and channels with wrapped flanges stacked in a yard
Galvanized tower members with their flanges wrapped for shipping, Vietnam.
Primed column with its bolted end plate set on painting stands
Primer on a column and its end plate at the Vietnam plant, ready for the next coat.
Members in gray finish paint laid out in the paint hall
Gray finish coat applied in the Vietnam paint hall.
Painted members strapped into bundles and stacked for the voyage
Bundles made up for an export shipment at the Vietnam plant.

Q&A

What New York buyers ask

Does Long Island need hurricane design?

Yes. Long Island and the harbor shore are in the hurricane-prone region of ASCE 7, so openings, corners and anchorage get extra attention.

How do you handle flood zones?

We set base plates, platforms and equipment supports to the design flood elevation your Engineer of Record confirms.

Which coating suits a waterfront site?

Usually hot-dip galvanizing or a duplex system, chosen with your engineer for the distance to salt water.

Official sources: ASCE Hazard Tool · FEMA Flood Map Service Center

New York solutions

Every New York guide

Related pages

Code facts on this page summarize New York practice, the NYS Uniform Code, the NYC Construction Codes, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the code official or the Department of Buildings confirm the code and edition in force for your project.

Building in New York?

Send the drawings or the site address, size and use. We set the New York design basis with your Engineer of Record, design or detail the steel to the Uniform Code or the NYC codes and your site’s snow and wind, and quote it made in our plant in Vietnam, packed in erection order for the trip to your site.