New York · Coast
Structural steel for Long Island coastal wind and flood
Long Island, Staten Island and the harbor shore lie in the hurricane-prone region of ASCE 7, and low-lying sites fall in mapped flood zones. Coastal storms push wind into large door openings and water against the base of the building, and salt air works on every exposed member.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and landed at the Port of New York and New Jersey for your New York site.
- Region
- Long Island and the harbor
- Wind
- ASCE 7 hurricane-prone
- Also
- Mapped flood zones
- Coatings
- Galvanizing or duplex
Why it matters
Keep the building closed and above the water
When a large door fails in a coastal storm, wind enters the building and the pressure inside pushes the roof up while the outside pulls it. Designing door framing, roof edges and the load path for the full pressure keeps the frame working as designed.
In a flood zone, the design flood elevation sets where the floor, the base plates and the equipment sit, and which walls must let water through. We design the frame around the elevation your Engineer of Record confirms and specify galvanizing or duplex coatings near the water.
What we design and fabricate
Steel for the coast
Opening framing
Jambs and headers for doors under full wind pressure.
Corner zones
Closer purlins and girts at roof corners and edges.
Flood elevation
Platforms and supports above the design flood elevation.
Salt-air coatings
Galvanizing or duplex systems near the water.
Who does what
Coastal design, split clearly
World Steel supplies
- Frame, roof, wall and opening framing for the stated wind
- Supports set to the confirmed flood elevation
- Coating systems for coastal exposure
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- Site wind, exposure and flood elevation confirmed by the Engineer of Record
- Door, window and cladding product approvals
- Engineer of Record approval and PE seal
- Local permit, floodplain review and inspections
- Erection and site work
New York
What we do not claim
World Steel holds no New York or coastal product approval. Doors, glazing and cladding carry their own ratings, arranged by your team.
New York ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · New York contractors
New York contractors: let’s win the next project together
If your next bid involves Long Island coastal wind, World Steel wants to be your long-term, win-win steel partner in New York. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your New York project is cut, welded, inspected and packed.
Q&A
What New York buyers ask
Does Long Island need hurricane design?
Yes. Long Island and the harbor shore are in the hurricane-prone region of ASCE 7, so openings, corners and anchorage get extra attention.
How do you handle flood zones?
We set base plates, platforms and equipment supports to the design flood elevation your Engineer of Record confirms.
Which coating suits a waterfront site?
Usually hot-dip galvanizing or a duplex system, chosen with your engineer for the distance to salt water.
Official sources: ASCE Hazard Tool · FEMA Flood Map Service Center
New York solutions
Every New York guide
Related pages
Code facts on this page summarize New York practice, the NYS Uniform Code, the NYC Construction Codes, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the code official or the Department of Buildings confirm the code and edition in force for your project.
Building in New York?
Send the drawings or the site address, size and use. We set the New York design basis with your Engineer of Record, design or detail the steel to the Uniform Code or the NYC codes and your site’s snow and wind, and quote it made in our plant in Vietnam, packed in erection order for the trip to your site.