Aerial view of the Tien Giang Tongwei Animal Feed Factory (Phase 1)

Aerial photo, World Steel project archive.

Dong Thap Province, Vietnam

Tien Giang Tongwei Animal Feed Factory (Phase 1) 1,500 t of structural steel for a factory in Vietnam

Phase 1 of a feed factory in Dong Thap Province, Vietnam (2018): about 1,500 metric tons (1,650 short tons) of structural steel designed, fabricated and supplied by World Steel. The same owner later returned for an expansion.

Location
Dong Thap Province, Vietnam
Building type
Factory
Year
2018
Structural steel
1,500 t
Next step Plan a similar building → Next step See all projects →

Project overview

About Tien Giang Tongwei Animal Feed Factory (Phase 1)

Phase 1 of the Tien Giang Tongwei Animal Feed Factory was completed in 2018 in Dong Thap Province in the Mekong Delta. World Steel designed, fabricated and supplied about 1,500 metric tons (1,650 short tons) of structural steel for this phase alone, and the same owner returned in 2020 for an expansion of the plant.

US feed, seed and fertilizer operators often build in stages as volumes grow. Planning column grids and end walls in the first phase so they can be extended later is a general design point worth raising at the outset with your Engineer of Record. We can model phase one with a future bay in mind and ship each phase as its own sequenced package. Ask for a phasing review.

Phase 1 of the Tongwei plant used about 1,500 tonnes of steel, and an expansion followed. A large first phase with a planned second one is the kind of program US industrial owners run.

In context

Tien Giang Tongwei Animal Feed Factory (Phase 1) by the numbers

Steel weight

About 1,500 metric tons of structural steel (1,653 short tons), about 60% of one month of the plant's 2,500 t monthly fabrication capacity.

It is the 5th largest of the 20 projects on this site with a published steel tonnage.

In the portfolio

Tien Giang Tongwei Animal Feed Factory (Phase 1) is one of 33 factories in the World Steel portfolio on this site, and one of 43 projects listed for Vietnam.

World Steel supplied Tien Giang Tongwei Animal Feed Factory (Phase 1) in 2018, together with 5 other projects shown here from that year.

Closest in steel weight:

Design points

What a factory needs from its steel

General points for every factory, not specific to this one.

Process first, frame second

Production lines, crane coverage and utility runs are laid out first, and the frame is sized to carry what they need.

Learn more →

Mezzanines in the model

Offices, control rooms and equipment decks are part of the main structural model rather than bolted on later.

Learn more →

Heat, cold and condensation

Insulation, ventilators and louvers are chosen for the process heat and the IECC climate zone, so the shop floor stays workable year-round.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Factory. Steel structure design, fabrication and supply by World Steel.