Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Tall lattice columns of a crane-served industrial building during erection

Mining steel structures · For large US contractors and EPCs

Structural steel for large mining projects, from the crusher to the load-out

Process plants, crusher and screen buildings, conveyor galleries and trestles, transfer towers, stockpile covers, pipe racks and truck shops: World Steel designs the structural steel to US codes, fabricates it in its own plant in Vietnam and ships it to your US port in pieces packed for a remote site.

The first and only fabricator in Vietnam accredited under IAS AC472. The steel comes mainly from mills in Vietnam, with Japan, Korea, Indonesia or Thailand when the project specification calls for it. Westminster, California is our US office, not a plant.

Capacity
2,500 t / monthabout 2,750 US tons of structural steel
Largest job
Jobs up to 5,000 tSunpro Steel factory, 2024
Accreditation
IAS AC472first and only in Vietnam
Tracking
PEB Studioevery member, in real time

Structural steel at mine scale

A large steel group behind your mining package

A mine is one of the largest steel packages a US contractor will bid: a concentrator, kilometers of conveyor gallery, towers, covers and racks, often all needed at once. World Steel Group’s plant fabricates up to 2,500 metric tons (about 2,750 US tons) of structural steel a month, with several projects in the shop in parallel and one project manager from the first calculation to the last container.

We work as the steel supply partner of the US contractor, who erects the steel, holds the permit and works with the Engineer of Record and the owner’s team.

Our largest jobs, metric tons of structural steel

Sunpro Steel Factory Steel industry · Can Tho City, Vietnam · 2024 5,000 tabout 5,500 short tons
CPV Food Processing Factory Food processing · Dong Nai Province, Vietnam · 2020 2,500 tabout 2,750 short tons
Long Son petrochemical complex Oil and gas · Ba Ria–Vung Tau, Vietnam · 2022 2,000 tabout 2,200 short tons
M&D (MD Factory) Warehouse and industrial · Thailand · 2024 2,000 tabout 2,200 short tons
Tongwei Tien Giang feed factory, phase 1 Animal feed · Dong Thap Province, Vietnam · 2018 1,500 tabout 1,650 short tons
New Era cold storage Cold storage, phase 1 tonnage · Tay Ninh Province, Vietnam 1,000 tabout 1,100 short tons

The white line marks one month of our plant’s output, 2,500 t. These are heavy industrial and large-tonnage jobs, shown for scale; none of them is a mine.

Walk the mine

Every station on the ore path that steel carries

Pick a view to follow the ore or the support facilities, then pick a station to read how we design and fabricate its steel.

Diagram Mine site flowsheet Diagram of a mine site: a truck shop and the open pit on the left, then a crusher building, a conveyor gallery to a transfer tower, a gallery along the ridge of a stockpile cover, a reclaim conveyor to the process plant and a load-out bin over a rail track, with a pipe rack running along the front. MINE TRUCK SHOP CRUSHER GALLERY TOWER STOCKPILE PROCESS PLANT LOAD-OUT PIPE RACK · SLURRY, TAILINGS, WATER AND POWER

Swipe the diagram sideways to see the whole site.

Diagram for explanation only. It is not a World Steel project and shows no real site, sizes or loads. The pit, the equipment and the earthworks are the owner’s and the US contractor’s scope.

Every steel structure on the site, from the truck shop to the load-out. Pick a station to read its guide.

The mining solution group

Ten guides, from the crusher to the remote site

Written for US contractors, EPCs, owners’ teams and engineers, each tied to the way we design, fabricate, protect and ship your steel.

Duty matrix

What usually drives the design of each structure

Mining steel is designed for more than gravity and wind. This matrix shows the design drivers that typically govern, or are always checked, for each structure. It is a general guide; your site, the owner’s criteria and your Engineer of Record decide.

Typical design drivers by mining structure
StructureDynamic and impact loadsFatigueAbrasion and spillageCorrosionWind and exposureSeismicSnow, ice and dust build-upAccess and guarding
Crushing and screening Often governs Often governs Often governs Often checked Seldom governs Often checked Often checked Often governs
Conveyor galleries Often checked Often checked Often checked Often governs Often governs Often checked Often governs Often governs
Transfer towers Often governs Often checked Often governs Often checked Often governs Often governs Often checked Often governs
Stockpile and load-out Seldom governs Seldom governs Often checked Often governs Often governs Often checked Often governs Often checked
Process plant Often governs Often governs Often checked Often governs Seldom governs Often governs Often checked Often governs
Pipe racks Often checked Seldom governs Seldom governs Often governs Often checked Often governs Often checked Often checked
Truck shop Often checked Often checked Seldom governs Often checked Often checked Often checked Often governs Often checked

Often governs the designOften checked

Remote-site delivery

From our plant to a mine at the end of the road

Steel for a remote mine is designed to ship: pieces sized for containers or flat racks, bolted splices instead of field welds, and every bundle packed by area in erection order.

  1. Our plant, Tay Ninh

    Designed, cut, welded, coated and packed by area

    World Steel

  2. Port in Vietnam

    Containers, flat racks or break-bulk

    World Steel

  3. Across the Pacific

    Tracked container by container in PEB Studio

    World Steel

  4. Your US port

    West, Gulf or East Coast, chosen for the inland route

    As agreed in the Incoterm

  5. Rail or road inland

    Import, customs and inland haul to the mine

    By agreement

  6. Mine laydown and erection

    Unloading, erection and field bolting

    The US contractor, our customer

Real photos from our plant in Vietnam

Where the steel for your mine is made

Heavy girders, trusses, columns and frames for US projects are cut, welded, blasted, coated and packed in World Steel’s own plant in Tay Ninh Province, Vietnam. Real photos of our shop floors, not stock images; none shows a mine.

Stiffened heavy plate girders resting on shop supports Photo
Heavy plate girders with stiffeners, fabricated by World Steel in Vietnam.
Welder beside a deep built-up girder running through the automatic line Photo
A deep plate girder going through automatic welding at World Steel, Vietnam.
Crew assembling a large steel truss on the shop floor Photo
A large truss being put together in the Vietnam fabrication hall.
X-braced red truss assembly on the fabrication floor Photo
Bridge truss assembled and coated in the World Steel shop, Vietnam.
Welder looking over the stiffeners and end plate of a heavy column Photo
Column stiffeners and end plate under inspection at World Steel, Vietnam.
Roller conveyor carrying members into a shot-blasting machine Photo
Surface preparation: the automatic shot blaster at the Vietnam plant.
Rows of labeled steel bundles ready to leave the plant Photo
Labeled bundles lined up for dispatch from World Steel in Vietnam.
Trucks loaded with fabricated steel leaving the World Steel plant, seen from the air Photo
The plant that fabricates US orders: World Steel in Tay Ninh Province, Vietnam (Hai Son Industrial Park, formerly Long An).

Who does what

A clear line between the steel and the mine

World Steel supplies the steel structure only. The US contractor, our customer, builds the plant with the owner’s team.

World Steel

  • Structural steel design to US codes and the owner’s criteria, for your Engineer of Record’s review
  • Tekla shop and erection drawings, at no extra charge
  • Process plant frames, crane runways, galleries, trestles, towers, covers, racks and platforms
  • Built-up heavy members welded from plate in our own plant
  • Hot-dip galvanizing, duplex or high-build coatings applied in our plant
  • QC records, mill certificates and the Manufacturing Data Record
  • Pieces packed by area in erection order and shipped to your US port
  • Real-time fabrication tracking in PEB Studio

The US contractor, our customer, and the owner’s team

  • Drawing approval, the PE seal and the permit, with your Engineer of Record
  • Owner’s design criteria, equipment data and MSHA safety requirements
  • Crushers, conveyors, mills, pumps and all process equipment
  • Earthworks, foundations and anchor rod setting
  • Erection, field bolting and field welding
  • Import, customs and inland delivery to the mine, as agreed in the Incoterm
  • Field special inspection and testing

The mining steel ecosystem

One mine, the whole World Steel ecosystem behind it

The large-project program, the engineering guides and the building packages connect here, with the products we make for heavy industrial work and past World Steel projects.

Products made in our plant in Vietnam

World Steel projects: heavy industrial and large-tonnage work

Past World Steel work, shown for the structure type and scale. None of these is a mine.

US codes, standards and guidance

The documents behind mining steel

We design and fabricate to these standards as your project requires. They are design references, not certifications: we claim no AISC or AWS company certification. Conveyor loads usually follow CEMA guidance from the conveyor designer, racks may follow PIP structural criteria, and MSHA rules are applied by the mine operator.

Questions from US contractors

Mining steel questions we hear

Can World Steel supply the structural steel for a large US mining project?

Yes. We design and fabricate the steel for process plant buildings, crusher and screen buildings, conveyor galleries and trestles, transfer towers, stockpile covers, pipe racks and truck shops in our own plant in Vietnam, and ship it to your US port. Large US contractors and EPCs are our customers: they erect the steel and hold the permit.

How much steel can you fabricate?

World Steel Group’s plant fabricates up to 2,500 metric tons (about 2,750 US tons) of structural steel a month. Our largest jobs so far include about 5,000 t for the Sunpro Steel factory and about 2,000 t for the Long Son petrochemical complex.

Have you built a mine before?

We have not published a mining project. Our references are heavy industrial jobs of similar scale and type, such as steel plant, petrochemical and large warehouse projects, shown on this page for structure type and tonnage. Ask us for the details of the work closest to your package.

Who approves and seals the design?

The US contractor, our customer, and their Engineer of Record. We deliver calculations and drawings ready for their review and approval; the PE seal and the permit are theirs.

Do you erect the steel or supply the conveyors?

No. World Steel supplies the steel structure only. Erection is the scope of the US contractor, and conveyors, crushers, mills and other equipment come from their specialist suppliers.

Can you meet MSHA requirements?

MSHA rules are applied by the mine operator and its safety team. We detail walkways, stairs, ladders, handrails, toe plates and guards to the criteria they give us, and your Engineer of Record approves the drawings.

What is your lead time?

We do not publish lead times, because they depend on tonnage, approvals and shipping. Your written scope includes a schedule for your project, and fabrication progress is visible in PEB Studio.

Bidding a mining project?

Send the general arrangement drawings, the owner’s structural criteria and the steel tonnage if you have it. We return a written scope for structural steel designed to US codes, made in our plant in Vietnam and shipped to your US port.