Oklahoma · Manufacturing
Structural steel for Oklahoma manufacturing plants
Oklahoma makes tires, metal products, oilfield and HVAC equipment and aerospace parts in plants around Oklahoma City, Tulsa, Ardmore and Muskogee, and central location and low costs keep bringing new ones. Production halls are long and wide, with crane bays and mezzanines, and they have to stand up to Oklahoma storms.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and landed at Port Houston and trucked north to your Oklahoma site.
- Clusters
- OKC, Tulsa, Ardmore
- Halls
- Long-span production
- Inside
- Cranes and mezzanines
- Storms
- Wind, hail and ice
Why it matters
Production halls that grow
A plant starts with one hall and adds bays as orders grow. Cranes set the column and runway design, mezzanines carry offices and equipment, and roof plant gets heavier with every new line.
Our plant built 5,000 t of structural steel for the Sunpro Steel factory in Vietnam. We design or detail long-span frames, crane runways and mezzanines for the plant’s crane classes, keep the model for the next bay and release the steel area by area.
What we design and fabricate
Steel for manufacturing plants
Long-span frames
Rigid frames and trusses for wide production halls.
Crane bays
Runways and crane columns for the specified classes.
Mezzanines
Floors for offices, lines and equipment.
Roof plant
Platforms and dunnage for air handling.
Who does what
Plant steel, split clearly
World Steel supplies
- Frame, runway and mezzanine design or detailing
- Packages released area by area
- A model kept for the next bay
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- Crane classes and loads from the owner
- Engineer of Record approval and PE seal
- Local permit and inspections
- Cranes and process equipment
- Erection and site work
Oklahoma
What we do not claim
World Steel names no manufacturer as a customer and claims no completed Oklahoma plant. Sunpro Steel is a project in Vietnam.
Oklahoma ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Oklahoma contractors
Oklahoma contractors: let’s win the next project together
If your next bid involves manufacturing plants, World Steel wants to be your long-term, win-win steel partner in Oklahoma. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Oklahoma project is cut, welded, inspected and packed.
Q&A
What Oklahoma buyers ask
Can the plant grow later?
Yes. We design end walls to come off and keep the model so the next bay matches.
Do you supply crane runways?
Yes. Runway beams, brackets and crane columns for the crane classes the plant specifies.
How large a plant can you supply?
Our plant fabricates 2,500 t a month; Sunpro Steel used 5,000 t of our steel.
Official sources: Oklahoma Department of Commerce
Oklahoma solutions
Every Oklahoma guide
Related pages
Code facts on this page summarize Oklahoma practice, the IBC as adopted by the Oklahoma Uniform Building Code Commission, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in Oklahoma?
Send the drawings or the site address, size and use. We set the Oklahoma design basis with your Engineer of Record, design or detail the steel to the statewide code and to tornado, hail, ice and seismic loads, and quote it made in our plant in Vietnam, packed in erection order for the trip to your site.