Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Nevada · Data centers

Structural steel for Nevada data center campuses

Nevada data center campuses cluster around Reno and in the industrial parks east of it, and across the Las Vegas Valley. Halls repeat building after building, roofs carry heavy cooling plant, northern sites need seismic bracing and southern sites face extreme heat.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and landed at Oakland or Los Angeles–Long Beach for your Nevada site.

Built-up members with welded stiffeners and drilled clip plates on shop supports
Stiffeners and drilled clip plates welded on, World Steel plant in Vietnam.
Clusters
Reno area and Las Vegas
Halls
Repeat bays
Roof
Heavy cooling plant
Release
Hall by hall

Why it matters

Repeat halls, heavy roofs

A data center campus is built hall after hall from the same grid. The steel has to carry heavy roof plant and cable loads, brace the halls for the site seismic category and arrive in phases that match the owner’s schedule.

We model the repeat hall once, release it phase by phase, and track every member in PEB Studio so your team sees the next hall coming before it ships.

What we design and fabricate

Steel for data halls

Hall frames

Repeat bays sized for roof plant and cable loads.

Roof plant steel

Platforms and dunnage for cooling equipment.

Cable supports

Tray and cable support steel through the halls.

Seismic bracing

Braced frames for the site seismic category.

Who does what

Data center steel, split clearly

World Steel supplies

  • Hall frames, roof plant steel and cable supports
  • Phased releases hall by hall
  • Seismic bracing designed or detailed to the site category
  • Live production tracking in PEB Studio
  • Tekla shop and erection drawings, included

The US contractor arranges

  • The owner contract and the phasing
  • Engineer of Record approval and PE seal
  • Permits and special inspections
  • Mechanical and electrical installation
  • Erection and site work

Nevada

What we do not claim

World Steel names no data center operator as a customer and claims no completed data center in Nevada. We fabricate the structural steel for the US contractor who builds the campus.

Nevada ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · Nevada contractors

Nevada contractors: let’s win the next project together

If your next bid involves data centers, World Steel wants to be your long-term, win-win steel partner in Nevada. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Nevada project is cut, welded, inspected and packed.

Operator checking web and flange plates set in blue H-beam assembly jigs
Web and flange plates set in the H-beam assembly jigs before automatic welding, Vietnam plant.
Welder looking over the stiffeners and end plate of a heavy column
Column stiffeners and end plate under inspection at World Steel, Vietnam.
Members in gray finish paint laid out in the paint hall
Gray finish coat applied in the Vietnam paint hall.
Gray members stacked and strapped together on a packing rack
Gray members strapped into a bundle on the packing rack, World Steel, Vietnam.

Q&A

What Nevada buyers ask

Can you repeat the same hall design?

Yes. We model the repeat hall once and release each copy as the owner’s phasing calls for it.

Do you supply roof plant steel?

Yes. Platforms and dunnage for cooling equipment come in the same package as the frames.

What about seismic loads in Reno?

The halls are braced for the Seismic Design Category your Engineer of Record sets, with AISC 341 where it applies.

Official sources: Nevada Governor’s Office of Economic Development

Nevada solutions

Every Nevada guide

Related pages

Code facts on this page summarize Nevada practice, the county-adopted IBC with its Southern or Northern Nevada amendments, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.

Building in Nevada?

Send the drawings or the site address, size and use. We set the Nevada design basis with your Engineer of Record, design or detail the steel to the code your county adopts and for seismic loads, desert heat and snow, and quote it made in our plant in Vietnam, packed in erection order and landed at Oakland or Los Angeles–Long Beach for the truck to your site.