Indiana · Heavy industry
Structural steel for Indiana steel mills and heavy plants
Northwest Indiana, from Gary to Burns Harbor and Whiting, produces more steel than any other state, alongside refineries and heavy plants. Mill buildings carry some of the heaviest cranes in industry, and new lines, upgrades and processing plants need heavy built-up steel made to the owner’s specification.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered by port, rail and truck to your Indiana site.
- Region
- Lake Michigan shore
- Buildings
- Mill and process buildings
- Key loads
- Heavy cranes, heat, dust
- Our part
- Built-up heavy steel
Why it matters
Heavy cranes need heavy steel
Crane runways in mill buildings see repeated heavy wheel loads, and fatigue governs the girders and their connections. Columns carry the crane, the roof and lateral loads together, often as built-up or stepped sections.
We cut plate up to 100 mm thick on our laser machines, weld built-up girders and columns in our own shop and follow the owner’s specification for materials, welding and coatings.
What we design and fabricate
Steel for heavy plants
Crane runway girders
Built-up girders detailed for fatigue.
Built-up columns
Stepped and laced columns for crane bays.
Process platforms
Heavy platforms, stairs and walkways.
Plant coatings
Coating systems for heat, dust and moisture.
Who does what
Heavy plant steel, split clearly
World Steel supplies
- Runway, column and platform design or detailing
- Built-up members from our own shop
- Welding to the owner’s specification
- Coating systems for the plant exposure
- Tekla shop and erection drawings, included
The US contractor arranges
- Crane data and plant specifications from the owner
- Work inside running plants and shutdowns
- Engineer of Record approval and PE seal
- Foundations and erection
- Permits and plant safety rules
Indiana
What we do not claim
World Steel names no steel mill or refinery as a customer and claims no completed Indiana plant.
Indiana ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Indiana contractors
Indiana contractors: let’s win the next project together
If your next bid involves steel mills and heavy industry, World Steel wants to be your long-term, win-win steel partner in Indiana. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Indiana project is cut, welded, inspected and packed.
Q&A
What Indiana buyers ask
How heavy a member can you make?
We make built-up girders and columns from plate up to 100 mm thick, within shipping limits agreed for the project.
Can you follow a mill’s own specification?
Yes. We follow the owner’s material, welding, inspection and coating specification.
Can you supply steel for a shutdown?
Yes, if planned early. We release and pack steel so it arrives in the order the shutdown work needs.
Official sources: Indiana Economic Development Corporation
Indiana solutions
Every Indiana guide
Related pages
Code facts on this page summarize Indiana practice, the Indiana Building Code, the state Construction Design Release, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the reviewing authority confirm the code and edition in force for your project.
Building in Indiana?
Send the drawings or the site address, size and use. We set the Indiana design basis with your Engineer of Record, design or detail the steel ready for the state design release and quote it made in our plant in Vietnam, packed in erection order for the trip to your site.