Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Louisiana · River ports

How structural steel reaches Louisiana through the river ports

The lower Mississippi is one of the busiest port systems in the world: New Orleans, the Port of South Louisiana and Baton Rouge line the deep-water channel, and many plants have their own docks. Steel for Louisiana projects lands at New Orleans and continues by truck, barge or rail, while Houston can serve Lake Charles and the west.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, and shipped to your Louisiana site through the Port of New Orleans and the river ports.

Gateway
Port of New Orleans
Inland
Truck, barge or rail
Packing
Erection order, road limits
Our part
Packing lists and loading plans
Rows of labeled steel bundles ready to leave the plant
Labeled bundles lined up for dispatch from World Steel in Vietnam.

The route

From the Gulf to your site

Port of New Orleans

Container and breakbulk terminals at the mouth of the industrial river.

Port page →

Port of Houston

An option for Lake Charles and western Louisiana by truck on I-10.

Port page →

Port of Mobile

An option for the Northshore and eastern parishes.

Port page →

River and barge

Breakbulk can move upriver by barge to plant docks.

Truck to site

Containers and flat-racks continue by road to your site.

How we pack

Packed for the port, barge and erection

Member lengths

Cut to container, flat-rack and road limits.

Erection-order bundles

Bundles grouped by area and sequence.

Piece marks

Every member marked to the erection drawings.

Packing lists

Lists by container, ready for receiving.

Louisiana

Louisiana

What we do not claim

We publish no transit times or freight rates. Routes and timing are planned per project at quotation, with the Incoterm agreed in writing.

Louisiana ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · Louisiana contractors

Louisiana contractors: let’s win the next project together

If your next bid involves river ports and logistics, World Steel wants to be your long-term, win-win steel partner in Louisiana. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Louisiana project is cut, welded, inspected and packed.

Steel bundles stacked high on a packing frame awaiting loading
A packing frame in the Vietnam plant stacked with bundles before they are loaded out.
Packing hall with steel bundles, timber dunnage and loading racks
Timber dunnage and bundles in the packing hall at the Vietnam plant.
Painted members strapped into bundles and stacked for the voyage
Bundles made up for an export shipment at the Vietnam plant.
Trucks loaded with fabricated steel leaving the World Steel plant, seen from the air
The plant that fabricates US orders: World Steel in Tay Ninh Province, Vietnam (Hai Son Industrial Park, formerly Long An).

Q&A

What Louisiana buyers ask

Can steel go by barge to a plant dock?

Breakbulk can, where the plant has a dock and the route is planned. Most projects use truck from New Orleans.

Who handles customs?

The importer of record agreed in your Incoterm. We set this out in writing before you order.

Are bundles packed in erection order?

Yes, with piece marks and packing lists by container.

Official sources: Port of New Orleans

Louisiana solutions

Every Louisiana guide

Related pages

Code facts on this page summarize Louisiana practice, the Louisiana State Uniform Construction Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building official confirm the edition and amendments in force for your permit.

Building in Louisiana?

Send the drawings or the site address, size and use. We set the Louisiana design basis with your Engineer of Record, design or detail the steel and quote it made in our plant in Vietnam, packed in erection order for the trip to your site.