New Jersey · The Shore
Structural steel for Jersey Shore wind and flood
From Sandy Hook to Cape May, the Shore carries the highest wind speeds in the state, salt air and flood zones that grew stricter after Hurricane Sandy in 2012. Public, commercial and marine buildings here are designed for the wind on the frame and the openings, for the flood at the base, and for corrosion over the life of the building.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and landed at Port Newark–Elizabeth, a short drive from your New Jersey site.
- Coast
- Sandy Hook to Cape May
- Wind
- Highest in the state
- Flood
- Mapped flood zones
- Air
- Salt, coatings matter
Why it matters
Wind above, water below, salt all around
When a large door or window fails in a coastal storm, wind enters the building and the pressure inside pushes the roof up. Designing door framing, bracing and anchorage for the full pressure keeps the frame working as designed. In flood zones, the base of the building, the anchor rods and any steel below the design flood elevation are coordinated with your engineer’s flood design.
Salt air shortens the life of bare and poorly coated steel. We specify hot-dip galvanizing or a coating system for the exposure, with products from paint makers such as Jotun, PPG, Carboline and Hempel that can be bought for touch-up in the US.
What we design and fabricate
Steel for the Shore
Opening framing
Jambs and headers for doors under coastal wind.
Anchorage
Base plates and anchor rods for uplift and shear.
Flood-zone bases
Base details coordinated with the flood design.
Coatings
Galvanizing or coating systems for salt air.
Who does what
Coastal design, split clearly
World Steel supplies
- Frame, bracing and opening framing for the stated wind
- Base and anchorage details for the flood design
- Galvanizing or coating systems for the exposure
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- Flood design and elevations by the Engineer of Record
- Engineer of Record approval and PE seal
- Coastal and flood permits
- Foundations and site work
- Erection
New Jersey
What we do not claim
World Steel does not design flood protection or hold coastal permits. Flood design and elevations come from your Engineer of Record, and we detail the steel to them.
New Jersey ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · New Jersey contractors
New Jersey contractors: let’s win the next project together
If your next bid involves shore wind and flood, World Steel wants to be your long-term, win-win steel partner in New Jersey. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your New Jersey project is cut, welded, inspected and packed.
Q&A
What New Jersey buyers ask
Do you design for hurricane wind at the Shore?
Yes. We design the frame, openings and anchorage for the ASCE 7 wind for the site, confirmed with your Engineer of Record.
How do you handle flood zones?
We coordinate base plates, anchor rods and any steel below the design flood elevation with your engineer’s flood design.
Which coatings do you use near the ocean?
Hot-dip galvanizing or a coating system for the exposure, from brands such as Jotun, PPG, Carboline and Hempel.
Official sources: ASCE Hazard Tool · FEMA Flood Map Service Center
New Jersey solutions
Every New Jersey guide
Related pages
Code facts on this page summarize New Jersey practice, the New Jersey Uniform Construction Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in New Jersey?
Send the drawings or the site address, size and use. We set the New Jersey design basis with your Engineer of Record, design or detail the steel to the Uniform Construction Code and to wind, snow and flood, and quote it made in our plant in Vietnam, packed in erection order for Port Newark and a short drive to your site.