Oregon · Food and cold storage
Structural steel for Oregon food processing plants and cold storage
The Willamette Valley is one of the richest farm regions in the United States: berries, hazelnuts, vegetables, grass seed, wine grapes and dairy. Processing plants, freezers and cold storage warehouses cluster around Salem, Woodburn, Albany and Eugene, and along the Columbia in the northeast of the state.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and landed at the Port of Portland or Seattle–Tacoma for your Oregon site.
- Region
- Willamette Valley
- Crops
- Berries, nuts, vegetables
- Rooms
- Freezers and process halls
- Seismic
- High categories
Open call · Oregon contractors
Oregon contractors: let’s win the next project together
If your next bid involves food processing and cold storage, World Steel wants to be your long-term, win-win steel partner in Oregon. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Oregon project is cut, welded, inspected and packed.
Q&A
What Oregon buyers ask
Can you detail steel for daily wash-down?
Yes. We detail process steel to drain and to clean, and specify galvanizing or epoxy coatings for daily washing.
Do racks change the seismic design?
Yes. Racked product adds mass. We design the frames for the rack loads and seismic data your Engineer of Record provides.
Have you built cold storage?
Yes. Our plant supplied 1,000 t of steel for the New Era cold storage in Vietnam.
Official sources: Oregon Department of Agriculture
Oregon solutions
Every Oregon guide
Related pages
Code facts on this page summarize Oregon practice, the Oregon Structural Specialty Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in Oregon?
Send the drawings or the site address, size and use. We set the Oregon design basis with your Engineer of Record, design or detail the steel to the Oregon Structural Specialty Code and for Cascadia seismic hazard, snow and coastal wind, and quote it made in our plant in Vietnam, packed in erection order and landed at the Port of Portland or Seattle–Tacoma for the truck to your site.