Louisiana · LNG terminals

Structural steel for Louisiana LNG export terminals

Southwest Louisiana has become one of the largest LNG export regions in the world, with terminals along the Calcasieu Ship Channel and the Cameron coast. Around the liquefaction trains, which follow specialist designs, each terminal needs pipe rack steel, control and electrical buildings, warehouses, workshops and offices, all on exposed coastal sites with very high design wind speeds.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, and shipped to your Louisiana site through the Port of New Orleans and the river ports.

Market
LNG export in Southwest Louisiana
Steel
Racks, support buildings, platforms
Loads
Very high coastal wind
Our part
Galvanized steel, released by area
Seaside industrial site with a steel warehouse at its center, wide drone shot
Wide aerial of a World Steel warehouse on a seaside site outside the US.

Why it matters

The buildings around the trains

The liquefaction trains and tanks of an LNG terminal are specialist work. The steel around them is not: pipe racks, equipment structures, control rooms, electrical buildings, warehouses and maintenance shops. It is ordered in large packages and erected while the trains are built.

These sites face some of the highest design wind speeds in the state and salt air every day. We fabricate to the engineering contractor’s drawings and specification, galvanize or coat for the exposure and release the steel area by area.

What we design and fabricate

Steel for an LNG terminal

Pipe rack steel

Racks and bridges to your drawings.

Electrical buildings

Switchgear and control buildings.

Warehouses and shops

Maintenance and spare-parts buildings.

Galvanized members

Protection for coastal exposure.

Who does what

Our scope beside the specialists

World Steel supplies

  • Structural steel for racks, platforms and buildings
  • Galvanizing or coatings to your specification
  • Tekla shop and erection drawings, included
  • Mill certificates by heat and inspection records
  • Release packages by plant area

Others provide

  • Liquefaction trains, tanks and cryogenic systems
  • Engineering contractor design and PE seal
  • Erection and site work by the US contractor
  • Piping, equipment and electrical installation
  • Permits and inspections

Louisiana

What we do not claim

World Steel names no LNG company as a customer and supplies no cryogenic or tank structures. We fabricate structural steel to the drawings and specifications your team approves.

Louisiana ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · Louisiana contractors

Louisiana contractors: let’s win the next project together

If your next bid involves LNG export terminals, World Steel wants to be your long-term, win-win steel partner in Louisiana. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Louisiana project is cut, welded, inspected and packed.

Galvanized poles and channels with wrapped flanges stacked in a yard
Galvanized tower members with their flanges wrapped for shipping, Vietnam.
Stiffened heavy plate girders resting on shop supports
Heavy plate girders with stiffeners, fabricated by World Steel in Vietnam.
Rows of labeled steel bundles ready to leave the plant
Labeled bundles lined up for dispatch from World Steel in Vietnam.
Galvanized ladder cage section with mesh rings and rebar rungs under blue sky
Galvanized ladder cage section for a 50 m (164 ft) tower job, Vietnam.

Q&A

What Louisiana buyers ask

Do you supply the LNG tanks or trains?

No. We supply structural steel for racks, platforms and buildings around them.

Can steel be galvanized for coastal exposure?

Yes, galvanizing is arranged when the specification calls for it.

How do you handle very large packages?

Our plant fabricates 2,500 t a month, released by plant area to match erection.

Official sources: US Energy Information Administration: LNG

Louisiana solutions

Every Louisiana guide

Related pages

Code facts on this page summarize Louisiana practice, the Louisiana State Uniform Construction Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building official confirm the edition and amendments in force for your permit.

Building in Louisiana?

Send the drawings or the site address, size and use. We set the Louisiana design basis with your Engineer of Record, design or detail the steel and quote it made in our plant in Vietnam, packed in erection order for the trip to your site.