Maine · Delivery
Structural steel delivered to Maine job sites
Maine has its own container service at Portland’s International Marine Terminal, and Boston and New York–New Jersey are larger gateways a truck ride away. Our steel travels from the port by truck on I-95 and I-295 to sites across the state. Members are packed in erection order.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered through Portland, Boston or New York for your Maine site.
- In-state
- Portland, Maine terminal
- Larger gateway
- New York–New Jersey
- Highway
- I-95
- Packing
- Erection order
Why it matters
Up the coast by truck
Portland, Maine suits many southern and central sites; New York–New Jersey and Boston have more sailings for large packages. Aroostook County is a long truck ride north. The choice depends on the site, the package and the delivery terms.
We pack bundles by erection area, label every piece and show loading in PEB Studio, so your team knows what arrives on each truck.
The route
How steel reaches a Maine site
Portland, Maine terminal
In-state container service for the truck to your site.
Maine
Maine ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Maine contractors
Maine contractors: let’s win the next project together
If your next bid involves port to Maine, World Steel wants to be your long-term, win-win steel partner in Maine. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Maine project is cut, welded, inspected and packed.
Q&A
What Maine buyers ask
Which port is best for Maine?
Portland, Maine or New York–New Jersey, depending on the package. We compare routes.
Can you deliver to Aroostook County?
Yes, depending on the Incoterms agreed. It is a long truck ride north.
How are members packed?
In erection order, labeled by area, with packing lists for each bundle.
Official sources: Maine Port Authority
Maine solutions
Every Maine guide
Related pages
Code facts on this page summarize Maine practice, the Maine Uniform Building and Energy Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in Maine?
Send the drawings or the site address, size and use. We set the Maine design basis with your Engineer of Record, design or detail the steel to MUBEC, heavy snow and salt air, and quote it made in our plant in Vietnam, packed in erection order and delivered through Portland, Boston or New York for the truck to your site.