Minnesota · Iron Range
Structural steel for Minnesota Iron Range mining
The Mesabi Iron Range around Hibbing, Virginia and Eveleth produces most of the iron ore mined in the US, processed into taconite pellets and shipped through Duluth and Two Harbors. Mine and plant buildings here are large and heavy, with crushers, conveyors and big cranes, and they stand in the deepest snow and cold in the state.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and sent by rail on the northern route to your Minnesota site.
- Range
- Mesabi Iron Range
- Product
- Taconite pellets
- Buildings
- Process, conveyors, shops
- Climate
- Deepest snow and cold
Why it matters
Heavy plant in the far north
A taconite plant has tall process buildings around crushers, mills and kilns, long conveyor galleries between them and maintenance shops big enough for haul trucks, with heavy cranes in most of them. Owners write their own specifications for steel, welding, coatings and inspection, and the cold makes steel toughness part of the design conversation.
Our plant built 5,000 t of structural steel for the Sunpro Steel factory in Vietnam. We design or detail crane runways and built-up columns, conveyor and platform steel to the owner’s specification, and supply steel with Charpy test results when it is specified.
What we design and fabricate
Steel for mine and plant buildings
Crane bays
Runways and built-up crane columns for heavy duty.
Conveyor galleries
Gallery trusses and support bents.
Truck shops
Tall maintenance shops for haul trucks.
Tested steel
Charpy-tested steel when the design calls for it.
Who does what
Mining steel, split clearly
World Steel supplies
- Building, runway and gallery design or detailing
- Fabrication to the owner’s specification
- Inspection and test plan agreed per project
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- Owner specifications and mine safety rules
- Engineer of Record approval and PE seal
- Permits and inspections
- Process equipment and conveyors
- Erection and site work
Minnesota
What we do not claim
World Steel names no mining company as a customer and claims no completed mining project. Sunpro Steel is a factory project in Vietnam.
Minnesota ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Minnesota contractors
Minnesota contractors: let’s win the next project together
If your next bid involves Iron Range mining, World Steel wants to be your long-term, win-win steel partner in Minnesota. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Minnesota project is cut, welded, inspected and packed.
Q&A
What Minnesota buyers ask
Can you work to a mine owner’s specification?
Yes. We fabricate to the owner’s steel, welding, coating and inspection specifications, agreed in the inspection and test plan.
Can you supply conveyor gallery steel?
Yes. Gallery trusses, support bents and walkways, designed or detailed to your Engineer of Record’s criteria.
Can you supply steel for very low temperatures?
Yes. Plate mills can supply steel with Charpy impact test results when it is specified.
Official sources: Minnesota Department of Natural Resources: minerals
Minnesota solutions
Every Minnesota guide
Related pages
Code facts on this page summarize Minnesota practice, the Minnesota State Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in Minnesota?
Send the drawings or the site address, size and use. We set the Minnesota design basis with your Engineer of Record, design or detail the steel to the Minnesota State Building Code and to snow, drift and frost, and quote it made in our plant in Vietnam, packed in erection order for rail on the northern route to your site.