Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Rows of columns, rafters and purlins inside a large steel building

Inside a finished World Steel frame on a job abroad (location not stated).

Specialized opportunities

Refining · Chemical · Midstream

Oil, Gas & Industrial Processing

Heavy welded process steel with complete quality records. Pipe racks, process platforms, equipment supports and maintenance buildings for refining, chemical and midstream operators.

Structures
Pipe racks, platforms and equipment frames
Welding
Qualified procedures under AWS D1.1
Quality
Work to your inspection and test plan
Records
Weld, NDT and coating data per piece
Typical sectionIllustrative
Illustrative section of a oil, gas & industrial processing steel buildingThree tiersPipe rack modulesProcess platformStairs and accessWeld and coating records

Illustrative pipe rack and platform, not a design. Your inspection and test plan sets welds, NDT and coatings.

Every weld on record

Your inspection and test plan, executed piece by piece

Process owners write detailed specifications. We work to them in our IAS AC472-accredited plant and hand over a record for every weld and every coat.

  1. Agree the ITP

    Hold and witness points, NDT scope and coating checks are fixed before cutting starts.

  2. Qualified procedures

    Welders and procedures are qualified to the code your specification names.

    Learn more →
  3. Inspect and test

    NDT and dimensional checks are recorded, and inspections can be witnessed remotely.

    Learn more →
  4. Coat and verify

    Surface preparation and film thickness are measured and logged for each piece.

    Learn more →
  5. Hand over the data book

    The complete record ships with the steel, ready for your quality team.

    Learn more →

In the US market

Gulf Coast refineries, chemical plants and midstream terminals work to detailed owner specifications, and replacement or expansion steel has to tie into existing plant.

What the building needs

Welded members made to qualified procedures, coating systems for aggressive exposure, safe access to equipment, and a record for every weld and every coat.

How World Steel helps

We work to your inspection and test plan, offer remote witnessing of inspections, and hand over a complete data record with the steel.

Made in our Vietnam plant

What we supply

  • Heavy steel fabrication
  • Welded built-up members
  • Access platforms
  • Protective coatings
  • Quality documentation

Products · Steel buildings

Building types and the frames behind them

Each type starts from a building package we already make in Vietnam, then gets engineered for your site, your codes and your layout.

All steel buildings →

Pipe rack

Braced rack in shippable modules

Scoped to your drawings

Process platform

Built-up platform with stairs and ladders

Scoped to your drawings

Open floor of a clear-span warehouse with no interior columns Photo

Maintenance building

Rigid frame with optional crane

Starts from: Carport & Canopy Structures

Warehouse frame from above, purlins and girts fixed to the rafters and columns Photo

Building packages

Planned steel building packages for the building types US owners ask for most.

See packages →

Engineering

Engineered for US codes, your site and this use

Our engineers design to the code edition your jurisdiction has adopted, and deliver calculations and drawings ready for your Engineer of Record to review and approve.

Questions your engineer will raise

  • Weld procedures, NDT and coating inspection are fixed in an inspection and test plan before cutting starts.

  • Owner engineering standards frequently add requirements on top of the building code.

  • Module and member sizes are planned around shipping and crane limits.

Your Engineer of Record sets the design values, and your local building department decides which code edition and amendments apply.

IBC 2024ASCE 7-22AISC 360AISI S100AWS D1.1AWS D1.3

Site conditions to review

IAS AC472 accreditedWorld Steel is the first and only steel building plant in Vietnam accredited to IAS AC472 for design and fabrication inspection.

Solutions · End to end

From our plant in Vietnam to your site in the US

One partner carries your oil, gas & industrial processing building from the first calculation to the last container. Westminster, California is our US office; every member is made in Vietnam.

  1. Engineered to US codes

    Designed to IBC 2024 and ASCE 7-22, with drawings ready for your engineer’s review and approval.

    Steel building design →
  2. Made in our Vietnam plant

    Cut, welded and coated in World Steel’s own IAS AC472-accredited plant, from steel rolled mainly in Vietnam and ordered to US grades.

    Inside the plant →
  3. Tracked live in PEB Studio

    Watch each of your members move through fabrication and QC release, in real time.

    PEB Studio →
  4. Shipped to a US port

    Packed by erection sequence and shipped to West, Gulf or East Coast ports, then trucked to site.

    Vietnam to USA →
  5. Erected by your team

    Piece marks, erection drawings and packing lists let your erector start straight away.

    How we work →

PEB Studio

Watch your building being made, in real time

Log in to PEB Studio and follow every column, rafter and purlin of your project through cutting, welding, coating and QC release at our Vietnam plant. Your team plans erection around real progress, not promises.

PEB Studio production dashboard with fabrication progress by stage (demonstration data) Demonstration data
Live production status

The Oil, Gas & Industrial Processing ecosystem

Everything that connects to your building

Products you can buy, solutions that deliver them, the states we ship to and the people we work with. Each link opens its own page.

Projects

Similar buildings we have fabricated

Comparable building types from our portfolio, with US work, including the US territory of Guam, shown first.

All projects →

Questions and answers

Oil, Gas & Industrial Processing: what US contractors ask us

16 straight answers on design, fabrication in our Vietnam plant, shipping and who does what on your project.

Standards and specifications 4 answers

Can you work to our owner engineering standards?

Yes. Owner standards often add requirements on top of the building code; we review them with your inspection and test plan before fabrication.

Which welding codes do you follow?

AWS D1.1 for structural welding, and AWS D1.8 for seismic systems where specified. Our shop holds qualified procedures and welders for both, and owner welding requirements are reviewed before release.

Can you supply impact-tested steel?

Yes, on request. Vietnamese plate mills can supply EN 10204 3.1 certificates with Charpy impact values when your specification calls for toughness testing.

Do you follow an inspection and test plan?

Yes. Your ITP is mapped to our quality steps, with hold and witness points agreed before fabrication starts and results recorded per piece.

Racks, modules and buildings 4 answers

Which process structures do you fabricate?

Pipe racks, equipment structures, platforms and stairs, compressor and process buildings, warehouses, workshops and control buildings.

How are large racks shipped?

In modules sized for containers, flat-racks and the crane at your site, with bolted connections between modules.

Can process buildings carry cranes and heavy equipment?

Yes. Crane runways, equipment supports and hanging loads are designed with the frame from the start, using the loads equipment suppliers give.

How do you protect steel in a corrosive plant?

With a coating or galvanizing system chosen for the exposure your engineer sets, applied in our Vietnam plant, with film thickness recorded for each lot.

Capacity and inspection 4 answers

What is the largest process project you have supplied?

The Long Son oil and gas project used about 2,000 metric tons (2,205 short tons) of World Steel structural steel over more than 56,000 m² (603,000 sq ft). The plant fabricates up to 2,500 metric tons a month.

Can our inspector witness tests in Vietnam?

Witness points can be attended in person or remotely, and PEB Studio shows the status of each piece between visits.

Is the fabricator accredited?

Yes. World Steel is the first and only fabricator in Vietnam accredited under IAS AC472, audited twice a year since 2019.

Can protected zones be marked on seismic members?

Yes, on request. Protected zones are marked on members so field trades do not weld or attach to them.

Scope and contracting 4 answers

Does World Steel erect at the facility?

No. World Steel designs, fabricates and supplies. Erection, tie-ins and site work are the scope of the US contractor, our customer.

Who seals the drawings?

Your Engineer of Record reviews and approves our calculations and drawings, and the PE seal and permits stay with the US project team.

Can you fabricate to drawings from our engineer?

Yes. We can detail and fabricate to your issued-for-construction design, or design the steel ourselves for your Engineer of Record to review.

What do you need for a bid?

The structural drawings or design basis, owner standards, ITP, coating specification, site location and the module limits for transport and lifting.

Ready to scope your process steel project?

Send a footprint, a sketch or a full drawing set. An engineer checks it against US code requirements and replies with exactly what World Steel would make in Vietnam and ship to your port.