West Virginia · Building code
Structural steel and the West Virginia State Building Code
The West Virginia State Fire Commission adopts the State Building Code, based on the IBC. Cities and counties choose whether to adopt and enforce it, while the State Fire Code applies statewide. We confirm whether your parcel has local enforcement and which edition applies before we model.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered through Baltimore or Norfolk for your West Virginia site.
- State code
- IBC based
- Adopted by
- State Fire Commission
- Enforced
- Where adopted locally
- Our part
- Code stated on sheet one
Why it matters
A state code, adopted county by county
Charleston, Morgantown and Martinsburg enforce the building code, while a mine site in a southern county may have only the fire code. Lenders, insurers and owners still usually expect design to the IBC and ASCE 7.
We confirm the edition and enforcement with your Engineer of Record, state the code basis and loads on the first calculation sheet and answer reviewer comments on the steel through your team.
Design basis
What the steel design states
The items we confirm with your Engineer of Record before modeling.
| Item | What we state |
|---|---|
| Code | The West Virginia State Building Code edition, where adopted locally |
| Wind | ASCE 7 wind speed, exposure and risk category |
| Snow | Ground snow, drift and the roof shape |
| Seismic | Site class and Seismic Design Category |
| Envelope | Girt and purlin details for the adopted energy code |
Who does what
Code work, split clearly
World Steel supplies
- Steel design or detailing to the stated code basis
- Calculations and drawings for plan review
- Answers to reviewer comments on the steel
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- The permit application
- Engineer of Record approval and PE seal
- Geotechnical report and site class
- Special inspections and local inspections
- Foundations and erection
West Virginia
What we do not claim
World Steel holds no West Virginia approval and no West Virginia engineering license, and does not apply for permits. Your Engineer of Record seals the design and your team files it with the building official.
West Virginia ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · West Virginia contractors
West Virginia contractors: let’s win the next project together
If your next bid involves State Building Code, World Steel wants to be your long-term, win-win steel partner in West Virginia. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your West Virginia project is cut, welded, inspected and packed.
Q&A
What West Virginia buyers ask
Is the building code statewide?
The State Fire Code is. The building code applies where a city or county has adopted it.
What if my county has not adopted it?
We still design the steel to the IBC and ASCE 7 unless the owner directs otherwise.
Can you answer plan review comments?
Yes. We answer comments on the steel and revise drawings through your Engineer of Record.
Official sources: West Virginia State Fire Marshal
West Virginia solutions
Every West Virginia guide
Related pages
Code facts on this page summarize West Virginia practice, the West Virginia State Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in West Virginia?
Send the drawings or the site address, size and use. We set the West Virginia design basis with your Engineer of Record, design or detail the steel to the West Virginia State Building Code, mountain snow and valley floods, and quote it made in our plant in Vietnam, packed in erection order for mountain roads and delivered through Baltimore or Norfolk.