Montana · Delivery
Structural steel delivered to Montana job sites
Montana is reached from the Pacific Northwest. Our steel usually lands at Seattle or Tacoma and travels east by rail on the northern transcontinental lines or by truck on I-90 and I-94 to Missoula, Bozeman, Billings and the Hi-Line. Members are packed complete and in erection order.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered by rail or truck for your Montana site.
- Gateways
- Seattle and Tacoma
- Rail
- Northern lines
- Highways
- I-90 and I-94
- Packing
- Erection order
Why it matters
East over the passes
Rail runs from Puget Sound across the Rockies to Montana, and I-90 crosses the passes by truck. Portland is an alternative gateway. The choice depends on the site, the package and the delivery terms.
We pack bundles by erection area, label every piece and show loading in PEB Studio, so your team knows what arrives on each railcar or truck.
The route
How steel reaches a Montana site
Montana rail and truck
Rail yards and I-90 and I-94 for the truck to your site.
Montana
Montana ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Montana contractors
Montana contractors: let’s win the next project together
If your next bid involves rail across the Rockies, World Steel wants to be your long-term, win-win steel partner in Montana. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Montana project is cut, welded, inspected and packed.
Q&A
What Montana buyers ask
Which port is best for Montana?
Usually Seattle or Tacoma. We compare routes for your site and terms.
Can you deliver to remote sites?
Yes, depending on the Incoterms agreed and road limits.
How are members packed?
In erection order, labeled by area, with packing lists for each bundle.
Official sources: Montana Department of Transportation
Montana solutions
Every Montana guide
Related pages
Code facts on this page summarize Montana practice, the Montana building code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in Montana?
Send the drawings or the site address, size and use. We set the Montana design basis with your Engineer of Record, design or detail the steel to the Montana building code, western seismic belts and mountain snow, and quote it made in our plant in Vietnam, packed complete in erection order and delivered by rail or truck to your site.